• Save
Forma de plástico - moladi plastica forma
Upcoming SlideShare
Loading in...5
×
 

Forma de plástico - moladi plastica forma

on

  • 2,095 views

Forma de plástico - Sistema Construtivo para casas populares - www.moladi.net - casas populares baixo, forma de plástico, formas, formas de plástico, formas plásticas, formwork, moladi, molde, ...

Forma de plástico - Sistema Construtivo para casas populares - www.moladi.net - casas populares baixo, forma de plástico, formas, formas de plástico, formas plásticas, formwork, moladi, molde, sistema construtivo para casas populares, forma plastica para concreto celular, forma plastica, Uma casa por dia, wall, montagem, tec, tecwall, Sistema construtivo para construção civil

Statistics

Views

Total Views
2,095
Views on SlideShare
2,095
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
4

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
  • Innovative Building Technologies - moladi - plastic formwork - monolithic - reinforced - building system - precast - prefab - insitu - IBS - cast homes - mortar - cement - concrete - Formas plásticas - forma
    Are you sure you want to
    Your message goes here
    Processing…
  • Forma plastica para concreto celular - forma plastica para concreto celular - forma plastica - forma plastica - Forma plástica - Forma plástica - Forma plástica - Sistema construtivo para construção civil - Sistema construtivo para construção civil
    Are you sure you want to
    Your message goes here
    Processing…
  • Formas plásticas para moldar paredes de concreto em casas populares. Montagem casa popular com formas plásticas e concreto celular pelo sistema moladi. Uma casa por dia.
    Construção inteligente em linha de montagem. Forma plástica leve e concreto celular. O futuro da construção. Ciclo de um dia por casa. 1986
    Are you sure you want to
    Your message goes here
    Processing…
  • Montagem casa popular com formas plásticas e concreto celular sistema moladi. Uma casa por dia. www.moladi.net
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Forma de plástico - moladi plastica forma Forma de plástico - moladi plastica forma Presentation Transcript

  • Established 1986
  • moladi is A MECHANISM for the RAPID delivery of QUALITY housing EMPOWERING local communities…a contemporary company that harnessesand implements contemporary solutions
  • Foundation-Raft Former
  • Foundation-Compact
  • Foundation-Compact
  • Foundation-Trench
  • Foundation-Trench
  • Foundation-Engineer Designed
  • Foundation-Professional-Indemnity
  • Foundation-Concrete
  • Foundation
  • Foundation-Power Float
  • moladi Formwork
  • moladi Formwork
  • moladi Formwork
  • Plumbing
  • Plumbing
  • moladi Formwork
  • moladi Formwork
  • Reinforcing
  • moladi Formwork
  • Foundation
  • Reinforcing-Engineer Designed
  • moladi Formwork
  • moladi Truss Block Out
  • moladi-Mix PlantRiver Sand-Cement-Water-moladiCHEM
  • moladi-Flow
  • moladi-Cast In-situ
  • moladi Formwork
  • Truss Block-Out
  • Truss Block-Out
  • Truss Block-Out
  • Truss Block-Out
  • Superstructure
  • Superstructure
  • Roof
  • Ceiling
  • Complete
  • Wall Properties
  • 40 m²
  • 45 m²
  • 52 m²
  • 62 m²
  • 75 m²
  • 80 m² 1987
  • 110 m²Bonded by Standard Bank since 1993
  • 120 m²
  • Mexico Double Walk-up
  • Mexico Semi - Detached
  • Classrooms
  • Clinics
  • Ablution Block
  • Offices
  • Factories – Shopping Centers
  • Security Walling
  • Block vs moladiOur block is BIGGER
  • Construction Cycle– Erratic supplies = erratic delivery– Dependant on skilled labour– Waste– Rework– Slow delivery– Inconsistent quality– Unpredictable cash flow– Increased cost
  • moladi Cycle– Constant supply = constant delivery– Known cost– Unskilled operators– Next to no waste– Increased productivity– Reduced cost– Consistent quality– Predictable cash flow
  • Key Benefits• NHBRC – Rational Design• Agrément Certified (CSIR)• SABS tested and approved• Engineer Certified * – Foundation – Super Structure – Roof• Superior wall strength• Quality Controls• Community acceptance NBR SABS - 0400 * Professional Indemnity QUALITY ...
  • Key Benefits• Train and employ local unskilled labour• Utilize local materials• Re-useable• Reduced transport cost• Low construction cost• Rapid construction time• Practicable designs• Quality approved materials• Variety of finishing details• Low maintenance cost ...SAVINGS
  • Key Benefits• Speed without compromising quality• No need to plaster• No need to chase• No beam filling• Waterproof• Reinforced• Waste reduction• Logistics• Alterations and additions ...SAVINGS
  • Housing Delivery• Reduce unemployment – Job creation• Community upliftment• Supply chain• Environment• Education• Health• Crime• Social development• Carbon footprint
  • A wall is a wall is a wall… A structure with a shower can be termed “Low Cost” A structure with a bath can be termed “Affordable” A structure with a Jacuzzi can be termed “High Income”The finishes of a structure determines the value No quality disparity between “High Income” structures and “Low Cost” structures
  • Fundamental Criteria• Social acceptance• Durability• Quality• Variety• Increase in value• Re-sale ability• Minimise risk - Insurance/Professional Indemnity• Certified• Bondable/Financed
  • SABS Test Waterproof• Test method is for the worst case scenario i.e. Cape Town 1,000-mm rainfall per annum with a wind speed of 30 metre/second conducted over a 24- hour period.
  • SABS Test Soft Body Impact• A 30 kg bag swings to impact the wall 900 mm above the floor height to access the serviceability criteria• 1800 mm above the floor height to access the safety criteria.• Two impacts of the bag where executed on the exterior wall surface for each of the above criteria and the wall was inspected after each impact for any sign of cracks, damage or collapse – none.
  • SABS Test Chisel Impact• After two impact of the chisel from a height of 375 mm above the floor height a slight indentation was visible. The depth of the indentation was less than 3 mm.
  • SABS Test• All test conducted by the South African Bureau of Standards, have been executed on a 100 mm (4 inch) wall as this is an acceptable norm for in situ walls and is also the standard applied to low cost housing units.• Thermal conductivity of 100 mm moladi wall = 0,54 W/m.K
  • ThermalConductivity/Resistance
  • Awards 1991 1997 2006Social entrepreneurs are not content just to give a fish, or teach how to fish. They will not rest until they have revolutionized the fishing industry. - Bill Drayton -
  • Conclusion One structure in One day withOne moladi mould More structures in One day withMore moladi moulds