Six sigma dmaic strategy
Upcoming SlideShare
Loading in...5
×
 

Six sigma dmaic strategy

on

  • 913 views

 

Statistics

Views

Total Views
913
Views on SlideShare
913
Embed Views
0

Actions

Likes
0
Downloads
23
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Six sigma dmaic strategy Six sigma dmaic strategy Presentation Transcript

  • Six Sigma - DMAIC Strategy
  • FICCI CE Six Sigma - DMAIC StrategyDefine Measure Analyze Improve Control DMAIC is a data driven quality strategy for improving processes and an integral part of a six Sigma quality initiative.DMAIC Is the Acronym for 5 phases of Six Sigma as given below:- Define, Measure, Analyze, Improve, Control
  • FICCI CE Define This phase defines the project . It identifies critical customer requirements and links them to business needs. It also defines a project charter and the business processes to be undertaken for Six Sigma.
  • FICCI CE Measure This phase involves selecting product characteristic, mapping respective process, making necessary measurements and recording the results of the process. This is essentially a data collection phase.
  • FICCI CE Analyze In this phase an action plan is created to close the “gap” between how things currently work and how the organization would like them to work in order to meet the goals for a particular product or service.
  • FICCI CE Improve This phase involves improving processes/product performance characteristics for achieving desired results and goals. This phase involves application of scientific tools and techniques for making tangible improvements in profitability and customer satisfaction.
  • FICCI CE Control This phase requires the process conditions to be properly documented and monitored through various control methods so that the results are sustained in the long run and do not deviate or slip-back.
  • FICCI CE The breakthrough strategyDefine Measure Analyze Improve Control Each phase is designed to ensure that :- • Companies apply the breakthrough strategy in a systematic way. • Six Sigma projects are systematically designed and executed and • The results of these projects are incorporated into running the day-today business.
  • FICCI CE Strategy at various levelsDefine Measure Analyze Improve Control Almost every organization can be divided into 3 basic levels :- 1. Business level 2. Operations level 3. Process level. It is extremely important that Six Sigma is understood and integrated at every level.
  • FICCI CE Strategies at various levelsDefine Measure Analyze Improve Control • Executives at the business level can use Six Sigma for improving market share, increasing profitability and organizations long term viability. • Managers at operations level can use Six Sigma to improve yield and reduce the labor and material cost. • At the process level engineers can use Six Sigma to reduce defects and variation and improve process capability leading to better customer satisfaction.
  • FICCI CE