SlideShare a Scribd company logo
1 of 12
KAZAKHSTAN, FROM LANDLOCKED TO LINKEDIN
From ‘Eurasian Transit Corridor’ into a ‘Trans Eurasian Destination'
Karl GHEYSEN
CEO Khorgos Gateway
АО НК КТЖ
Chengdu
Wuhan
Khorgos
ASTANA
Aktobe
Brest
Moscow
Lianyungang
Xian
Almaty
Shenzhen
Lodz
Pardubice
hamburg
Zhengzhou
Aktau
Arkalyk
Shubarkul
Zhrzkazgan
Baineu
Kostanay
Duisburg
Madrid
Willow
3572
6568
21192
2012. 2013. 2014.
Attracted current China-Europe-China
Alyat
Batumi /
Poti
Istanbul
Akhalkalaki
Kars
6 ORGANIZATION OF CONTAINER TRAINS
Altynkol
Сhongqing
Khorgos Gateway – your DESTINATION terminal
The movement of 20 regular container trains is organized on following routes:
Europe – Kazakhstan – Europe (13 trains)
China – Europe (7 trains)
The container train on the China-Istanbul route will be organized in 2015
Details of high-speed container trains
China-Europe
Distance Time
Chongqing - Duisburg ~ 10 769 km 16 days
Chengdu - Lodz ~ 9 764 km 14 days
Chongqing - Duisburg
(deep sea)
~ 20 000 km 45-60 days
KHORGOS Gateway
YOUR ULTIMATE LINK BETWEEN EUROPE & ASIA
KHORGOS Gateway – THE GAME CHANGER …
• SEZ and ICD at the KZ-China border
• World class equipment
• 500+ KTEU capacity
• Paperless clearing processes
Integration of TOS with Customs and scanning D-bases
• Under exclusive DP World management
Khorgos Gateway
Khorgos Gateway - Project Description – 3 pillars
Khorgos Gateway SEZ and ICD :
Industrial Zone
230 Ha
Logistics Zone
189 Ha
Dry Port
149 Ha
• Overall-site management by DP World :
• Introduction of international best practices and KPI’s to ensure both productivity & performance
standards.
• Ensuring the highest safety standards and strict monitoring of QHSE processes.
Dry Port - Tech Specs :
• 8 Full length rail tracks - 4 wide & 4 narrow gauge
• Rail Terminal : 3 fully automated RMG’s,
• Container Yard :
• 17 RTG’s
• 6 Reach Stackers & 2 Empty Handlers
• 3.650 TEU ground slots
• Annual throughput capacity : 650.000 TEU
• Scanning & weighbridge facilities
• Implementation of well-founded and tested TOS
(Terminal Operating Software)
• Integration of TOS with Customs Scanning Processes,
creating paperless and transparent customs processing
Khorgos Gateway - Project Update
2015 :
2015-’16 - Project Phase TWO :
• October 2015 :
• ready for investor developments
• May 2016 :
• logistic and Industrial Zone
completion of all facilities
• Jebel Ali
Industrial Zone
Dry Port
Logistics Zone
2015 - Project Phase ONE :
• Rail Terminal
• Multi User Warehouse I
• Multi User Warehouse II
• Container Yard
• July 15th. 2015 :
• Dry Port Start of Operations
• September 15th 2015 :
• Formal commissioning and
ceremonial opening of
Khorgos Gateway Dry Port
WHY Khorgos ?
• SEZ Benefits (tax, customs, workforce)
• Location
– On the crossroads of old and new Silk Road
– Centre of Eurasian continent
• EEC – Eurasian Economic Union
Khorgos Gateway - Why ?
Eurasian Economic Union (1/2)
• Established in 2014 by Belarus,
Kazakhstan and Russia, effective Jan. ’15
• Armenia and Kyrgyzstan (May ‘15)
• Integrated single market of 173 million
people and GDP of over 4 trillion USD.
• EEU introduces free movement of goods, capital and services.
• Provides for common policies on transport, agriculture and
energy.
Khorgos Gateway - Why ?
Eurasian Economic Union (2/2)
• 17 cities with more than 1 million inhabitants
• Produces
• 9% of the world‘s electrical energy
• 5.9% of the world's coal,
• making it the third and fourth producer in
the world, respectively
• Producing about 20.7% of the world's natural gas, and 14.6% of the
world's oil and gas condensate in 2012.
• Evolution :
– Provisions for single currency and greater integration in the future.
– By 2019, creation of a common electricity market as well as a single
hydrocarbons market by 2025.
– Candidate members including Tajikistan & Uzbekistan.
Khorgos Gateway - Why ?
Traditional supply-chain to Kazakhstan
Market
OCEAN- vs RAIL-FREIGHT (2/2)
European Regional HQ
(in charge of Kazakhstan market)
Market
(customers)
LDC KZ :
Almaty
Tianjin
Kotka
Amsterdam, June 9th , 2015
Summary
World class services (under management of DP World)
Centralized Location for access to ENTIRE Central-Asia and CIS Market
Eurasian Economic Zone
Khorgos Gateway … your strategic, regional Central-Asian hub, located on
the crossroads between Europe and Asia.
KAZAKHSTAN, FROM LANDLOCKED TO LINKEDIN
From ‘Eurasian Transit Corridor’ into a ‘Trans Eurasian Destination'
Karl Gheysen
CEO Khorgos Gateway
Start of Operations : July, 2015
Feel free to join us !

More Related Content

What's hot

Paprocki_Pieriegud_Smart_Rail_EURASIA_Istanbul_27-01-2016_final
Paprocki_Pieriegud_Smart_Rail_EURASIA_Istanbul_27-01-2016_finalPaprocki_Pieriegud_Smart_Rail_EURASIA_Istanbul_27-01-2016_final
Paprocki_Pieriegud_Smart_Rail_EURASIA_Istanbul_27-01-2016_finalJana Pieriegud
 
Baltic adriatique corridor k. bodewig
Baltic adriatique corridor   k. bodewigBaltic adriatique corridor   k. bodewig
Baltic adriatique corridor k. bodewigEuropean Commission
 
Challenging urban sprawl: public transit access point optimization
Challenging urban sprawl: public transit access point optimizationChallenging urban sprawl: public transit access point optimization
Challenging urban sprawl: public transit access point optimizationJoseph Chow
 
Dynamic Fleet Sizing Problem for an E-Scooter Valet Service
Dynamic Fleet Sizing Problem for an E-Scooter Valet ServiceDynamic Fleet Sizing Problem for an E-Scooter Valet Service
Dynamic Fleet Sizing Problem for an E-Scooter Valet ServiceJoseph Chow
 
Economic evaluation of fly over bridge and its assessment on traffic flow ben...
Economic evaluation of fly over bridge and its assessment on traffic flow ben...Economic evaluation of fly over bridge and its assessment on traffic flow ben...
Economic evaluation of fly over bridge and its assessment on traffic flow ben...PremGupta63
 
[Urban transportation policy program]city paper presentation guangzhou 2
[Urban transportation policy program]city paper presentation guangzhou 2[Urban transportation policy program]city paper presentation guangzhou 2
[Urban transportation policy program]city paper presentation guangzhou 2shrdcinfo
 
Assessing Potential for Transit-Oriented Development
Assessing Potential for Transit-Oriented DevelopmentAssessing Potential for Transit-Oriented Development
Assessing Potential for Transit-Oriented DevelopmentNew Jersey Future
 
Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...
Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...
Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...Joseph Chow
 
Transport for London - GIS
Transport for London - GISTransport for London - GIS
Transport for London - GISEsri UK
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottJumpingJaq
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureAuckland Transport
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Auckland Transport
 
Logistics lecture-4 transportation-1
Logistics lecture-4 transportation-1Logistics lecture-4 transportation-1
Logistics lecture-4 transportation-1Ravi K Singh
 
Synchromodal Transport - Opportunities for entrepreneurs
Synchromodal Transport - Opportunities for entrepreneurs Synchromodal Transport - Opportunities for entrepreneurs
Synchromodal Transport - Opportunities for entrepreneurs Kees Verweij
 
Port of Maputo Infrastructure and Operations update
Port of Maputo Infrastructure and Operations updatePort of Maputo Infrastructure and Operations update
Port of Maputo Infrastructure and Operations updateTristan Wiggill
 
Logistics managment part 1
Logistics managment part 1Logistics managment part 1
Logistics managment part 1Mohamed Motamed
 
Nicolas Gomez - Measuring bus ride satisfaction from latent attributes
Nicolas Gomez - Measuring bus ride satisfaction from latent attributesNicolas Gomez - Measuring bus ride satisfaction from latent attributes
Nicolas Gomez - Measuring bus ride satisfaction from latent attributesJoseph Chow
 
Risks to project benefits realisation: Some lessons from Transport webinar
Risks to project benefits realisation: Some lessons from Transport webinarRisks to project benefits realisation: Some lessons from Transport webinar
Risks to project benefits realisation: Some lessons from Transport webinarAssociation for Project Management
 

What's hot (20)

Paprocki_Pieriegud_Smart_Rail_EURASIA_Istanbul_27-01-2016_final
Paprocki_Pieriegud_Smart_Rail_EURASIA_Istanbul_27-01-2016_finalPaprocki_Pieriegud_Smart_Rail_EURASIA_Istanbul_27-01-2016_final
Paprocki_Pieriegud_Smart_Rail_EURASIA_Istanbul_27-01-2016_final
 
Baltic adriatique corridor k. bodewig
Baltic adriatique corridor   k. bodewigBaltic adriatique corridor   k. bodewig
Baltic adriatique corridor k. bodewig
 
Challenging urban sprawl: public transit access point optimization
Challenging urban sprawl: public transit access point optimizationChallenging urban sprawl: public transit access point optimization
Challenging urban sprawl: public transit access point optimization
 
Dynamic Fleet Sizing Problem for an E-Scooter Valet Service
Dynamic Fleet Sizing Problem for an E-Scooter Valet ServiceDynamic Fleet Sizing Problem for an E-Scooter Valet Service
Dynamic Fleet Sizing Problem for an E-Scooter Valet Service
 
Economic evaluation of fly over bridge and its assessment on traffic flow ben...
Economic evaluation of fly over bridge and its assessment on traffic flow ben...Economic evaluation of fly over bridge and its assessment on traffic flow ben...
Economic evaluation of fly over bridge and its assessment on traffic flow ben...
 
[Urban transportation policy program]city paper presentation guangzhou 2
[Urban transportation policy program]city paper presentation guangzhou 2[Urban transportation policy program]city paper presentation guangzhou 2
[Urban transportation policy program]city paper presentation guangzhou 2
 
Assessing Potential for Transit-Oriented Development
Assessing Potential for Transit-Oriented DevelopmentAssessing Potential for Transit-Oriented Development
Assessing Potential for Transit-Oriented Development
 
Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...
Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...
Investigating Time-of-Use as a Factor in Dynamic Wireless Charging Infrastruc...
 
Transport for London - GIS
Transport for London - GISTransport for London - GIS
Transport for London - GIS
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie Piggott
 
Integrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's futureIntegrated transport - investing in Auckland's future
Integrated transport - investing in Auckland's future
 
Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015Community liason-group-presentation-10-02-2015
Community liason-group-presentation-10-02-2015
 
Logistics lecture-4 transportation-1
Logistics lecture-4 transportation-1Logistics lecture-4 transportation-1
Logistics lecture-4 transportation-1
 
Weatflows case study - Freight mapping
Weatflows case study - Freight mappingWeatflows case study - Freight mapping
Weatflows case study - Freight mapping
 
Synchromodal Transport - Opportunities for entrepreneurs
Synchromodal Transport - Opportunities for entrepreneurs Synchromodal Transport - Opportunities for entrepreneurs
Synchromodal Transport - Opportunities for entrepreneurs
 
Port of Maputo Infrastructure and Operations update
Port of Maputo Infrastructure and Operations updatePort of Maputo Infrastructure and Operations update
Port of Maputo Infrastructure and Operations update
 
Logistics managment part 1
Logistics managment part 1Logistics managment part 1
Logistics managment part 1
 
Intermodal notes
Intermodal notesIntermodal notes
Intermodal notes
 
Nicolas Gomez - Measuring bus ride satisfaction from latent attributes
Nicolas Gomez - Measuring bus ride satisfaction from latent attributesNicolas Gomez - Measuring bus ride satisfaction from latent attributes
Nicolas Gomez - Measuring bus ride satisfaction from latent attributes
 
Risks to project benefits realisation: Some lessons from Transport webinar
Risks to project benefits realisation: Some lessons from Transport webinarRisks to project benefits realisation: Some lessons from Transport webinar
Risks to project benefits realisation: Some lessons from Transport webinar
 

Viewers also liked

CV_Project Architect_Hua Rong
CV_Project Architect_Hua RongCV_Project Architect_Hua Rong
CV_Project Architect_Hua RongHua Rong
 
The Map of the Transeuroasian Routes (Kazakhstan – New Silk Road)
The Map of the Transeuroasian Routes (Kazakhstan – New Silk Road)The Map of the Transeuroasian Routes (Kazakhstan – New Silk Road)
The Map of the Transeuroasian Routes (Kazakhstan – New Silk Road)Robert Mactier
 
05 kentsel-lojistik-ve-lojistik-merkezler
05 kentsel-lojistik-ve-lojistik-merkezler05 kentsel-lojistik-ve-lojistik-merkezler
05 kentsel-lojistik-ve-lojistik-merkezlerİrem Genç
 
Great Smart Green Silk Road: One Belt, One Road
Great Smart Green Silk Road: One Belt, One RoadGreat Smart Green Silk Road: One Belt, One Road
Great Smart Green Silk Road: One Belt, One RoadAzamat Abdoullaev
 

Viewers also liked (7)

CV_Project Architect_Hua Rong
CV_Project Architect_Hua RongCV_Project Architect_Hua Rong
CV_Project Architect_Hua Rong
 
The Map of the Transeuroasian Routes (Kazakhstan – New Silk Road)
The Map of the Transeuroasian Routes (Kazakhstan – New Silk Road)The Map of the Transeuroasian Routes (Kazakhstan – New Silk Road)
The Map of the Transeuroasian Routes (Kazakhstan – New Silk Road)
 
The Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk RoadThe Railway Challenges of the New Silk Road
The Railway Challenges of the New Silk Road
 
Flowserve suzhou
Flowserve suzhouFlowserve suzhou
Flowserve suzhou
 
Küresel lojistik
Küresel lojistikKüresel lojistik
Küresel lojistik
 
05 kentsel-lojistik-ve-lojistik-merkezler
05 kentsel-lojistik-ve-lojistik-merkezler05 kentsel-lojistik-ve-lojistik-merkezler
05 kentsel-lojistik-ve-lojistik-merkezler
 
Great Smart Green Silk Road: One Belt, One Road
Great Smart Green Silk Road: One Belt, One RoadGreat Smart Green Silk Road: One Belt, One Road
Great Smart Green Silk Road: One Belt, One Road
 

Similar to Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0

Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)EasyBusiness
 
Презентация Казахстана
Презентация КазахстанаПрезентация Казахстана
Презентация КазахстанаPerizat Imantaeva
 
Orient east med corridor m. grosch
Orient east med corridor   m. groschOrient east med corridor   m. grosch
Orient east med corridor m. groschEuropean Commission
 
Port Of Ust Luga
Port Of Ust LugaPort Of Ust Luga
Port Of Ust Lugaustluga
 
Presentation_UTLC_Geneva.pptx
Presentation_UTLC_Geneva.pptxPresentation_UTLC_Geneva.pptx
Presentation_UTLC_Geneva.pptxssuser41bbe4
 
South East Europe Rail conference - Franc Zepic
South East Europe Rail conference -  Franc ZepicSouth East Europe Rail conference -  Franc Zepic
South East Europe Rail conference - Franc ZepicRussell Publishing
 
JSC, “Lithuanian railways”
JSC, “Lithuanian railways”JSC, “Lithuanian railways”
JSC, “Lithuanian railways”Business Finland
 
Invest in Ukraine: Transport Infrastructure
Invest in Ukraine: Transport InfrastructureInvest in Ukraine: Transport Infrastructure
Invest in Ukraine: Transport InfrastructureOfficeNIC
 
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013Vadim Shabarov
 
ІІ Міжнародна конференція високого рівня "Інтегровані транспортні коридори Єв...
ІІ Міжнародна конференція високого рівня "Інтегровані транспортні коридори Єв...ІІ Міжнародна конференція високого рівня "Інтегровані транспортні коридори Єв...
ІІ Міжнародна конференція високого рівня "Інтегровані транспортні коридори Єв...Міністерство інфраструктури України
 
UIC HIGHSPEED 2018
UIC HIGHSPEED 2018 UIC HIGHSPEED 2018
UIC HIGHSPEED 2018 UICcom
 
UTG Presentation 2009
UTG Presentation 2009UTG Presentation 2009
UTG Presentation 2009Vadim Andreev
 
Delivering smarter transport networks for auckland
Delivering smarter transport networks for aucklandDelivering smarter transport networks for auckland
Delivering smarter transport networks for aucklandAuckland Transport
 

Similar to Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0 (20)

Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)
 
Trans Eurasia 2014
Trans Eurasia 2014Trans Eurasia 2014
Trans Eurasia 2014
 
5) 2015.03.23 presentation october railway_valinskiy oleg
5) 2015.03.23 presentation october railway_valinskiy oleg5) 2015.03.23 presentation october railway_valinskiy oleg
5) 2015.03.23 presentation october railway_valinskiy oleg
 
Презентация Казахстана
Презентация КазахстанаПрезентация Казахстана
Презентация Казахстана
 
Aktobe region - bright peak of your investments
Aktobe region - bright peak of your investmentsAktobe region - bright peak of your investments
Aktobe region - bright peak of your investments
 
Orient east med corridor m. grosch
Orient east med corridor   m. groschOrient east med corridor   m. grosch
Orient east med corridor m. grosch
 
Port Of Ust Luga
Port Of Ust LugaPort Of Ust Luga
Port Of Ust Luga
 
Rail Baltica
Rail BalticaRail Baltica
Rail Baltica
 
Presentation_UTLC_Geneva.pptx
Presentation_UTLC_Geneva.pptxPresentation_UTLC_Geneva.pptx
Presentation_UTLC_Geneva.pptx
 
South East Europe Rail conference - Franc Zepic
South East Europe Rail conference -  Franc ZepicSouth East Europe Rail conference -  Franc Zepic
South East Europe Rail conference - Franc Zepic
 
JSC, “Lithuanian railways”
JSC, “Lithuanian railways”JSC, “Lithuanian railways”
JSC, “Lithuanian railways”
 
Ukrainian infrastructure: open for investors
Ukrainian infrastructure: open for investorsUkrainian infrastructure: open for investors
Ukrainian infrastructure: open for investors
 
Invest in Ukraine: Transport Infrastructure
Invest in Ukraine: Transport InfrastructureInvest in Ukraine: Transport Infrastructure
Invest in Ukraine: Transport Infrastructure
 
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
 
ІІ Міжнародна конференція високого рівня "Інтегровані транспортні коридори Єв...
ІІ Міжнародна конференція високого рівня "Інтегровані транспортні коридори Єв...ІІ Міжнародна конференція високого рівня "Інтегровані транспортні коридори Єв...
ІІ Міжнародна конференція високого рівня "Інтегровані транспортні коридори Єв...
 
UIC HIGHSPEED 2018
UIC HIGHSPEED 2018 UIC HIGHSPEED 2018
UIC HIGHSPEED 2018
 
UTG Presentation 2009
UTG Presentation 2009UTG Presentation 2009
UTG Presentation 2009
 
Transport Sector of Uzbekistan as a factor of economic transformation in a lo...
Transport Sector of Uzbekistan as a factor of economic transformation in a lo...Transport Sector of Uzbekistan as a factor of economic transformation in a lo...
Transport Sector of Uzbekistan as a factor of economic transformation in a lo...
 
Development of the Russian Seaport Infrastructure
Development of the Russian Seaport InfrastructureDevelopment of the Russian Seaport Infrastructure
Development of the Russian Seaport Infrastructure
 
Delivering smarter transport networks for auckland
Delivering smarter transport networks for aucklandDelivering smarter transport networks for auckland
Delivering smarter transport networks for auckland
 

Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0

  • 1. KAZAKHSTAN, FROM LANDLOCKED TO LINKEDIN From ‘Eurasian Transit Corridor’ into a ‘Trans Eurasian Destination' Karl GHEYSEN CEO Khorgos Gateway
  • 2. АО НК КТЖ Chengdu Wuhan Khorgos ASTANA Aktobe Brest Moscow Lianyungang Xian Almaty Shenzhen Lodz Pardubice hamburg Zhengzhou Aktau Arkalyk Shubarkul Zhrzkazgan Baineu Kostanay Duisburg Madrid Willow 3572 6568 21192 2012. 2013. 2014. Attracted current China-Europe-China Alyat Batumi / Poti Istanbul Akhalkalaki Kars 6 ORGANIZATION OF CONTAINER TRAINS Altynkol Сhongqing Khorgos Gateway – your DESTINATION terminal The movement of 20 regular container trains is organized on following routes: Europe – Kazakhstan – Europe (13 trains) China – Europe (7 trains) The container train on the China-Istanbul route will be organized in 2015 Details of high-speed container trains China-Europe Distance Time Chongqing - Duisburg ~ 10 769 km 16 days Chengdu - Lodz ~ 9 764 km 14 days Chongqing - Duisburg (deep sea) ~ 20 000 km 45-60 days
  • 3. KHORGOS Gateway YOUR ULTIMATE LINK BETWEEN EUROPE & ASIA KHORGOS Gateway – THE GAME CHANGER …
  • 4. • SEZ and ICD at the KZ-China border • World class equipment • 500+ KTEU capacity • Paperless clearing processes Integration of TOS with Customs and scanning D-bases • Under exclusive DP World management Khorgos Gateway
  • 5. Khorgos Gateway - Project Description – 3 pillars Khorgos Gateway SEZ and ICD : Industrial Zone 230 Ha Logistics Zone 189 Ha Dry Port 149 Ha • Overall-site management by DP World : • Introduction of international best practices and KPI’s to ensure both productivity & performance standards. • Ensuring the highest safety standards and strict monitoring of QHSE processes. Dry Port - Tech Specs : • 8 Full length rail tracks - 4 wide & 4 narrow gauge • Rail Terminal : 3 fully automated RMG’s, • Container Yard : • 17 RTG’s • 6 Reach Stackers & 2 Empty Handlers • 3.650 TEU ground slots • Annual throughput capacity : 650.000 TEU • Scanning & weighbridge facilities • Implementation of well-founded and tested TOS (Terminal Operating Software) • Integration of TOS with Customs Scanning Processes, creating paperless and transparent customs processing
  • 6. Khorgos Gateway - Project Update 2015 : 2015-’16 - Project Phase TWO : • October 2015 : • ready for investor developments • May 2016 : • logistic and Industrial Zone completion of all facilities • Jebel Ali Industrial Zone Dry Port Logistics Zone 2015 - Project Phase ONE : • Rail Terminal • Multi User Warehouse I • Multi User Warehouse II • Container Yard • July 15th. 2015 : • Dry Port Start of Operations • September 15th 2015 : • Formal commissioning and ceremonial opening of Khorgos Gateway Dry Port
  • 7. WHY Khorgos ? • SEZ Benefits (tax, customs, workforce) • Location – On the crossroads of old and new Silk Road – Centre of Eurasian continent • EEC – Eurasian Economic Union Khorgos Gateway - Why ?
  • 8. Eurasian Economic Union (1/2) • Established in 2014 by Belarus, Kazakhstan and Russia, effective Jan. ’15 • Armenia and Kyrgyzstan (May ‘15) • Integrated single market of 173 million people and GDP of over 4 trillion USD. • EEU introduces free movement of goods, capital and services. • Provides for common policies on transport, agriculture and energy. Khorgos Gateway - Why ?
  • 9. Eurasian Economic Union (2/2) • 17 cities with more than 1 million inhabitants • Produces • 9% of the world‘s electrical energy • 5.9% of the world's coal, • making it the third and fourth producer in the world, respectively • Producing about 20.7% of the world's natural gas, and 14.6% of the world's oil and gas condensate in 2012. • Evolution : – Provisions for single currency and greater integration in the future. – By 2019, creation of a common electricity market as well as a single hydrocarbons market by 2025. – Candidate members including Tajikistan & Uzbekistan. Khorgos Gateway - Why ?
  • 10. Traditional supply-chain to Kazakhstan Market OCEAN- vs RAIL-FREIGHT (2/2) European Regional HQ (in charge of Kazakhstan market) Market (customers) LDC KZ : Almaty Tianjin Kotka
  • 11. Amsterdam, June 9th , 2015 Summary World class services (under management of DP World) Centralized Location for access to ENTIRE Central-Asia and CIS Market Eurasian Economic Zone Khorgos Gateway … your strategic, regional Central-Asian hub, located on the crossroads between Europe and Asia.
  • 12. KAZAKHSTAN, FROM LANDLOCKED TO LINKEDIN From ‘Eurasian Transit Corridor’ into a ‘Trans Eurasian Destination' Karl Gheysen CEO Khorgos Gateway Start of Operations : July, 2015 Feel free to join us !