08/25/10 PPG/Warren Safe-T Plus  Single Coat Rapid Return to Service Epoxy
Business Case for Single Coat PaintsReview 	U. S. Navy Goals 	Single Coat and Rapid Cure coatings for tank and void corrosion 	control 	Applicable to all tanks and voids within the U.S. Navy 		15,000 tanks and voids (~129,000,000ft2) 		1,612,000 gallons of coating required for preservation 		$250M per year to preserve tanks and voids in fleet using current 			materials and processes U. S. Navy Achievements Single Coat coatings now approved and specified for Class 5 (fuel), Class 7 	(ballast) and Class 11 (boiler/reserve feedwater) 		Single Coat optional in Class 13 (CHT) 		Single Coat still needed in Class 9 (potable water)
Business Case for Single Coat PaintsBackground Business case based on paint only.  Service Life issues are not addressed, but would favor high-solids and single coat products. Solvent based paints (Amercoat 235 or MIL-DTL-24441)	5-7 years in ballast tanks 100% Solids paints (Amercoat 133)			15-20 years in ballast tanks 100% Solids, single-coat paints (Safe-T Plus)		15-20 years in ballast tanks
Single Coat Production Requirements 	• Surface Preparation 		– Same industry standard as for legacy (24441) and high solids (23236) 	• SSPC SP-10 (Sa2-1/2) near white metal 	• Soluble salts <3μg/cm2 or conductivity <30μS-cm 		– Employs standard commercial process/equipment 	• Environmental Controls 		– Same industry standard as for legacy and high solids 	• Relative humidity <50% using commercial dehumidification 	• Application 		– Commercial standardized plural component 			equipment (COTS) 	• Same equipment as for high solids. 	• Equipment introduced to yards beginning in 1998 	• Nearly all commercial applicators are certified
The PPG Choices for Fuel, Ballast, Reserve Feed Water, CHT and Potable Water Tanks 216 hours to Completion 36 hours to Completion Traditional Cure UHS Coating, Ameron 133/333 MIL-PRF-23236, Type VII (Prime, Stripe, Topcoat) Rapid Cure PPG/Warren SAFE-T PLUS MIL-PRF-23236, Type VII  Single Coat Rapid Cure Coating Rapid Cure PPG/Warren SAFE-T PLUS Single Coat Rapid Cure Coating *Times include Touch-up Application of Rapid Cure Coatings, 2 Full Coats & Stripe – 90 Hrs *
Fleet Wide Cost Savings Using Single Coat, Rapid Cure Coatings Based on Remaining Composite Service Life* *Projections do not include: 1) Submarines due to complexity of maintenance requirements and cycles, however rapid Cure coating benefits as shown in this program are under investigation by SEA 07 and 92T 2) Auxiliary ships or MSC ships with  varied contracts and schedules . REFERENCE- Office of Naval Research
Looking Aft 15 Month Inspection         (US Navy Ship Oakhill)
“The PPG/Warren SAFE-T Plus coating system in this tank, SWB 3-121-1-W, was in excellent condition, with far less than 1/10 of 1% corrosion noted at 15 month inspection.” from Navy Inspection Report. US Navy Ship Oakhill
New York Aqueduct – 2 Year Inspection
16 year Inspection New York Aqueduct, May 12th 2010 of Warren SAFE-T PLUS. Inspection performed by Parsons Brinckerhoff, New York Office. The Single Coat, 40 mil application was in perfect condition after 16 years of constant flow.
QPL Certified US Navy MIL-PRF-23236, Type VII Classes 5/18, 7/18, 11/18, Grade C
SAFE-T PLUS TYPICAL PROPERTIES Liquid Properties: Mix Ratio 2:1 by volume Viscosity (ASTM 3278 Method A) 5000-10,000 cps Volume Solids (ASTM D 2697) 98 ± 2%* Weight Solids (ASTM D1475) 98 ± 2%* Thixotropic Index 4.0-5.0 Specific Gravity: ~1.12 Flash Point (Closed Cup): >235°F Color: off white, buff, gray, OAP blue Gel time (200g @ 77°F) 27 min. Thin Film Set (@ 77°F) 2 hours Thin Film Set (@ 40°F) 8 hours Shelf Life 3 year (unopened, dry, cool) Storage Requirements 40 -100°F VOC (EPA Method 24) <0.54 lb./gal.; 64.7 g/L Coverage (@ 20 mils) 80 ft.2 Coverage (@ 30 mils) 60 ft.2 Physical Properties: Tensile Strength (ASTM D638-86) 7000 psi Glass Transition Temperature (ASTM D3418-82) 151°F (avg.) Tensile Elongation @ Break 4.8% Shore D Hardness > 80 Qualifications: MIL-PRF-23236, Type VII, Class 5/18, Grade C MIL-PRF-23236, Type VII, Class 7/18, Grade C MIL-PRF-23236, Type VII, Class 11/18, Grade C MIL-PRF-23236, Type VII, Class 13/18, Grade C, Pending MIL-PRF-23236, Type VII, Class 9/18, Grade C, NSF Testing in progress Dry Time

More Related Content

What's hot

Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...impersal
 
water saving closet
water saving closetwater saving closet
water saving closetInstansi
 
Liquified natural gas (lng)
Liquified natural gas (lng)Liquified natural gas (lng)
Liquified natural gas (lng)Rizwan jamil
 
Chemical eor
Chemical eorChemical eor
Chemical eorKumar
 
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...Jj HanXue
 
Well Test Design
Well Test DesignWell Test Design
Well Test Designadsnah
 
Spe 130376 Slides
Spe 130376 SlidesSpe 130376 Slides
Spe 130376 Slidesjdowns
 
Cesium formate brine
Cesium formate brine Cesium formate brine
Cesium formate brine John Downs
 
SPE 145562
SPE 145562SPE 145562
SPE 145562jdowns
 
Spe yp monthly session hydraulic fracturing technology - april 2021
Spe yp monthly session   hydraulic fracturing technology - april 2021Spe yp monthly session   hydraulic fracturing technology - april 2021
Spe yp monthly session hydraulic fracturing technology - april 2021mohamed atwa
 
10 year periodic testing of lpg spherical tank
10 year periodic testing of lpg spherical tank10 year periodic testing of lpg spherical tank
10 year periodic testing of lpg spherical tanklpgbnhgastank
 
Drill and complete wells faster with clear formate brines
Drill and complete wells faster with clear formate brines Drill and complete wells faster with clear formate brines
Drill and complete wells faster with clear formate brines John Downs
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama MerahHami Asma'i
 
Compositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell JohnsCompositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell JohnsSociety of Petroleum Engineers
 
Well completion workshop april-2018
Well completion workshop april-2018Well completion workshop april-2018
Well completion workshop april-2018mohamed atwa
 
Chemix scp brochure
Chemix scp brochureChemix scp brochure
Chemix scp brochureMike Murty
 
Verifying Performance and Capability of New Technology for Surface and Subsur...
Verifying Performance and Capability of New Technology for Surface and Subsur...Verifying Performance and Capability of New Technology for Surface and Subsur...
Verifying Performance and Capability of New Technology for Surface and Subsur...Society of Petroleum Engineers
 

What's hot (20)

Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
Sources recent publications conference proceedings_icap-isap_icap2006, 10th, ...
 
water saving closet
water saving closetwater saving closet
water saving closet
 
Well test analysis
Well test analysisWell test analysis
Well test analysis
 
Liquified natural gas (lng)
Liquified natural gas (lng)Liquified natural gas (lng)
Liquified natural gas (lng)
 
Chemical eor
Chemical eorChemical eor
Chemical eor
 
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
HPHT Casing and Tubing: Standards and Specifications – Presented by Stuart Co...
 
Well Test Design
Well Test DesignWell Test Design
Well Test Design
 
Spe 130376 Slides
Spe 130376 SlidesSpe 130376 Slides
Spe 130376 Slides
 
Cesium formate brine
Cesium formate brine Cesium formate brine
Cesium formate brine
 
Waterflood Design and Operational Best Practices
Waterflood Design and Operational Best PracticesWaterflood Design and Operational Best Practices
Waterflood Design and Operational Best Practices
 
SPE 145562
SPE 145562SPE 145562
SPE 145562
 
Spe yp monthly session hydraulic fracturing technology - april 2021
Spe yp monthly session   hydraulic fracturing technology - april 2021Spe yp monthly session   hydraulic fracturing technology - april 2021
Spe yp monthly session hydraulic fracturing technology - april 2021
 
10 year periodic testing of lpg spherical tank
10 year periodic testing of lpg spherical tank10 year periodic testing of lpg spherical tank
10 year periodic testing of lpg spherical tank
 
Drill and complete wells faster with clear formate brines
Drill and complete wells faster with clear formate brines Drill and complete wells faster with clear formate brines
Drill and complete wells faster with clear formate brines
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
 
Compositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell JohnsCompositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell Johns
 
Well completion workshop april-2018
Well completion workshop april-2018Well completion workshop april-2018
Well completion workshop april-2018
 
Chemix scp brochure
Chemix scp brochureChemix scp brochure
Chemix scp brochure
 
Verifying Performance and Capability of New Technology for Surface and Subsur...
Verifying Performance and Capability of New Technology for Surface and Subsur...Verifying Performance and Capability of New Technology for Surface and Subsur...
Verifying Performance and Capability of New Technology for Surface and Subsur...
 

Similar to Warren Safe T Plus Navy Ppg

Ficha técnica TEMP-COAT-101 (Ingés)
Ficha técnica TEMP-COAT-101 (Ingés)Ficha técnica TEMP-COAT-101 (Ingés)
Ficha técnica TEMP-COAT-101 (Ingés)ThCoat®
 
corrocoat newsletter web
corrocoat newsletter webcorrocoat newsletter web
corrocoat newsletter webbus dev
 
Marine applications
Marine applicationsMarine applications
Marine applicationsRobin Wright
 
Zero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsZero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsCraig Carter
 
Lining Track Records & Case Histories
Lining Track Records & Case HistoriesLining Track Records & Case Histories
Lining Track Records & Case HistoriesInternational Paint
 
Encap systems7192010 7 21-10
Encap systems7192010 7 21-10Encap systems7192010 7 21-10
Encap systems7192010 7 21-10rosychin
 
Encap systems7192010 7 20-10
Encap systems7192010 7 20-10Encap systems7192010 7 20-10
Encap systems7192010 7 20-10rosychin
 
Encap systems7192010 7 20-10
Encap systems7192010 7 20-10Encap systems7192010 7 20-10
Encap systems7192010 7 20-10rosychin
 
Bc_Aero_Fold_Out_2016_08
Bc_Aero_Fold_Out_2016_08Bc_Aero_Fold_Out_2016_08
Bc_Aero_Fold_Out_2016_08Sue Jones
 
Sentry dry chemical hand portable extinguishers data specification sheet
Sentry dry chemical hand portable extinguishers data specification sheetSentry dry chemical hand portable extinguishers data specification sheet
Sentry dry chemical hand portable extinguishers data specification sheetSOS Safety International Inc.
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsJean-Francois Saint-Marcoux
 
Requisitos me tq carga
Requisitos me tq cargaRequisitos me tq carga
Requisitos me tq cargaJose Reis
 
Quality Rotomoulded Tanks for 21st Century
Quality Rotomoulded Tanks for 21st CenturyQuality Rotomoulded Tanks for 21st Century
Quality Rotomoulded Tanks for 21st CenturyIan Hansen
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDFWorldofAllLyrics
 
Chem line case-study-kfpc-taiwan
Chem line case-study-kfpc-taiwanChem line case-study-kfpc-taiwan
Chem line case-study-kfpc-taiwanShun-Hsing Cheng
 
TOPPS Cairo May 17th 2016 v1.2
TOPPS Cairo May 17th 2016 v1.2TOPPS Cairo May 17th 2016 v1.2
TOPPS Cairo May 17th 2016 v1.2TAQAMISR
 
TOPPS Cairo May 17th 2016 v1.2
TOPPS Cairo May 17th 2016 v1.2TOPPS Cairo May 17th 2016 v1.2
TOPPS Cairo May 17th 2016 v1.2TAQAMISR
 
Awwa 102 painting sherwyn williams
Awwa 102 painting sherwyn williamsAwwa 102 painting sherwyn williams
Awwa 102 painting sherwyn williamsVaradaraj Ck
 

Similar to Warren Safe T Plus Navy Ppg (20)

Ficha técnica TEMP-COAT-101 (Ingés)
Ficha técnica TEMP-COAT-101 (Ingés)Ficha técnica TEMP-COAT-101 (Ingés)
Ficha técnica TEMP-COAT-101 (Ingés)
 
corrocoat newsletter web
corrocoat newsletter webcorrocoat newsletter web
corrocoat newsletter web
 
Marine applications
Marine applicationsMarine applications
Marine applications
 
Zero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsZero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on Ships
 
Lining Track Records & Case Histories
Lining Track Records & Case HistoriesLining Track Records & Case Histories
Lining Track Records & Case Histories
 
Encap systems7192010 7 21-10
Encap systems7192010 7 21-10Encap systems7192010 7 21-10
Encap systems7192010 7 21-10
 
Encap systems7192010 7 20-10
Encap systems7192010 7 20-10Encap systems7192010 7 20-10
Encap systems7192010 7 20-10
 
Encap systems7192010 7 20-10
Encap systems7192010 7 20-10Encap systems7192010 7 20-10
Encap systems7192010 7 20-10
 
Bc_Aero_Fold_Out_2016_08
Bc_Aero_Fold_Out_2016_08Bc_Aero_Fold_Out_2016_08
Bc_Aero_Fold_Out_2016_08
 
WP_Extreme_2016 (2)
WP_Extreme_2016 (2)WP_Extreme_2016 (2)
WP_Extreme_2016 (2)
 
Sentry dry chemical hand portable extinguishers data specification sheet
Sentry dry chemical hand portable extinguishers data specification sheetSentry dry chemical hand portable extinguishers data specification sheet
Sentry dry chemical hand portable extinguishers data specification sheet
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
Requisitos me tq carga
Requisitos me tq cargaRequisitos me tq carga
Requisitos me tq carga
 
Quality Rotomoulded Tanks for 21st Century
Quality Rotomoulded Tanks for 21st CenturyQuality Rotomoulded Tanks for 21st Century
Quality Rotomoulded Tanks for 21st Century
 
205
205205
205
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
Chem line case-study-kfpc-taiwan
Chem line case-study-kfpc-taiwanChem line case-study-kfpc-taiwan
Chem line case-study-kfpc-taiwan
 
TOPPS Cairo May 17th 2016 v1.2
TOPPS Cairo May 17th 2016 v1.2TOPPS Cairo May 17th 2016 v1.2
TOPPS Cairo May 17th 2016 v1.2
 
TOPPS Cairo May 17th 2016 v1.2
TOPPS Cairo May 17th 2016 v1.2TOPPS Cairo May 17th 2016 v1.2
TOPPS Cairo May 17th 2016 v1.2
 
Awwa 102 painting sherwyn williams
Awwa 102 painting sherwyn williamsAwwa 102 painting sherwyn williams
Awwa 102 painting sherwyn williams
 

Warren Safe T Plus Navy Ppg

  • 1. 08/25/10 PPG/Warren Safe-T Plus Single Coat Rapid Return to Service Epoxy
  • 2. Business Case for Single Coat PaintsReview U. S. Navy Goals Single Coat and Rapid Cure coatings for tank and void corrosion control Applicable to all tanks and voids within the U.S. Navy 15,000 tanks and voids (~129,000,000ft2) 1,612,000 gallons of coating required for preservation $250M per year to preserve tanks and voids in fleet using current materials and processes U. S. Navy Achievements Single Coat coatings now approved and specified for Class 5 (fuel), Class 7 (ballast) and Class 11 (boiler/reserve feedwater) Single Coat optional in Class 13 (CHT) Single Coat still needed in Class 9 (potable water)
  • 3. Business Case for Single Coat PaintsBackground Business case based on paint only. Service Life issues are not addressed, but would favor high-solids and single coat products. Solvent based paints (Amercoat 235 or MIL-DTL-24441) 5-7 years in ballast tanks 100% Solids paints (Amercoat 133) 15-20 years in ballast tanks 100% Solids, single-coat paints (Safe-T Plus) 15-20 years in ballast tanks
  • 4. Single Coat Production Requirements • Surface Preparation – Same industry standard as for legacy (24441) and high solids (23236) • SSPC SP-10 (Sa2-1/2) near white metal • Soluble salts <3μg/cm2 or conductivity <30μS-cm – Employs standard commercial process/equipment • Environmental Controls – Same industry standard as for legacy and high solids • Relative humidity <50% using commercial dehumidification • Application – Commercial standardized plural component equipment (COTS) • Same equipment as for high solids. • Equipment introduced to yards beginning in 1998 • Nearly all commercial applicators are certified
  • 5. The PPG Choices for Fuel, Ballast, Reserve Feed Water, CHT and Potable Water Tanks 216 hours to Completion 36 hours to Completion Traditional Cure UHS Coating, Ameron 133/333 MIL-PRF-23236, Type VII (Prime, Stripe, Topcoat) Rapid Cure PPG/Warren SAFE-T PLUS MIL-PRF-23236, Type VII Single Coat Rapid Cure Coating Rapid Cure PPG/Warren SAFE-T PLUS Single Coat Rapid Cure Coating *Times include Touch-up Application of Rapid Cure Coatings, 2 Full Coats & Stripe – 90 Hrs *
  • 6. Fleet Wide Cost Savings Using Single Coat, Rapid Cure Coatings Based on Remaining Composite Service Life* *Projections do not include: 1) Submarines due to complexity of maintenance requirements and cycles, however rapid Cure coating benefits as shown in this program are under investigation by SEA 07 and 92T 2) Auxiliary ships or MSC ships with varied contracts and schedules . REFERENCE- Office of Naval Research
  • 7. Looking Aft 15 Month Inspection (US Navy Ship Oakhill)
  • 8. “The PPG/Warren SAFE-T Plus coating system in this tank, SWB 3-121-1-W, was in excellent condition, with far less than 1/10 of 1% corrosion noted at 15 month inspection.” from Navy Inspection Report. US Navy Ship Oakhill
  • 9. New York Aqueduct – 2 Year Inspection
  • 10. 16 year Inspection New York Aqueduct, May 12th 2010 of Warren SAFE-T PLUS. Inspection performed by Parsons Brinckerhoff, New York Office. The Single Coat, 40 mil application was in perfect condition after 16 years of constant flow.
  • 11. QPL Certified US Navy MIL-PRF-23236, Type VII Classes 5/18, 7/18, 11/18, Grade C
  • 12. SAFE-T PLUS TYPICAL PROPERTIES Liquid Properties: Mix Ratio 2:1 by volume Viscosity (ASTM 3278 Method A) 5000-10,000 cps Volume Solids (ASTM D 2697) 98 ± 2%* Weight Solids (ASTM D1475) 98 ± 2%* Thixotropic Index 4.0-5.0 Specific Gravity: ~1.12 Flash Point (Closed Cup): >235°F Color: off white, buff, gray, OAP blue Gel time (200g @ 77°F) 27 min. Thin Film Set (@ 77°F) 2 hours Thin Film Set (@ 40°F) 8 hours Shelf Life 3 year (unopened, dry, cool) Storage Requirements 40 -100°F VOC (EPA Method 24) <0.54 lb./gal.; 64.7 g/L Coverage (@ 20 mils) 80 ft.2 Coverage (@ 30 mils) 60 ft.2 Physical Properties: Tensile Strength (ASTM D638-86) 7000 psi Glass Transition Temperature (ASTM D3418-82) 151°F (avg.) Tensile Elongation @ Break 4.8% Shore D Hardness > 80 Qualifications: MIL-PRF-23236, Type VII, Class 5/18, Grade C MIL-PRF-23236, Type VII, Class 7/18, Grade C MIL-PRF-23236, Type VII, Class 11/18, Grade C MIL-PRF-23236, Type VII, Class 13/18, Grade C, Pending MIL-PRF-23236, Type VII, Class 9/18, Grade C, NSF Testing in progress Dry Time