Your SlideShare is downloading. ×
WEB 2.0 - Procurement in 2011
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

WEB 2.0 - Procurement in 2011

364
views

Published on

Presentattion for BMOE April 2011

Presentattion for BMOE April 2011

Published in: Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
364
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
10
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • SIP trunk forURI to E.164 translationpresence statescontent sharing ?zBRaiffeisenOÖ
  • zBLenzing All new endpoints will be SIP in the future All UC Endpoints registered as SIP go to UCM architecture As video capabilities of UCM are evolved over time, video and Telepresence will have the option to be migrated to UCM. VCS can provide three core services in the future to unified solutions; a GK to connect and interop any H.323 and 3rd party video devices and provide 3rd party IP PBX trunking for video, an Expressway solution that will support all Cisco video and Telepresence endpoints with firewall traversal and B2B dialling, and an Advanced Conferencing Service providing Telepresence and video conferencing services for scheduled and ad-hoc calls. To support the ongoing acceleration of pervasive telepresence, new, advanced applications will continue to be developed on the VCS
  • Transcript

    • 1. COLLABORATION in REALTIMEWEB 2.0 & Best Practice in PROCUREMENT
      April 2011
      Michael Klemen
    • 2. UMDENKEN
    • 3. Person centric
      Event centric
      Plant Historian
      PLC
      HMI
      SCADA/DES
      Inspection/Equipment Testing
      Weigh Scales
      Device Integration
      RFID Sensors
      Plant DataCollection
      EnvironmentalBuilding Management
      EssentielleElementederKollaborationDie Welt in 2011…. istanders…
      virtualized
      Machine Builder real Time Access
      Wireless testing for 802 xxx
      Video-enabled support for repair shops
      Integrated Prototype parts tracking
      Physical Security, Surveillance & Alarm
      Real Estate Automation
      Energy Monitoring & Optimization
      Waste Tracking and Alarming
      IP to the Shopfloor
      ...
      SAP
      COMPANY Production Template Apps
      Instant Virtual Video Office Meetings
      Virtual Quality Worksspaces
      Tracking Vehicles, Parts, Tools, People
      Mobile Data, Voice & Video
      Virtual Training
      Virtual Video Production Line Meetings
      Performance Visualization in the Plant
      Data, Voice, Video
      Mobility
      IP-Services
      Security
      Transp & Routing
      Virtualization
      Physical Infrastruct.
    • 4. EssentielleElementederKollaboration
    • 5. In der neuen Normalität brauchen wir produktive, grenzenfreie Unternehmen
    • 6. In der neuen Normalität brauchen wir rasche Innovation
    • 7. Flip can do it ….. Am 4.11. zwischen 08:08 to 09:04
    • 8. Creating impact with Video technology TheFLIP.com
      Which Business Process needs no explanation, no maintainance view, no graphical view.....
      If a picture tells 1000 words – how many do you get by video.....
    • 9. Video Showcase Kollaboration in ….
      Issue
      Connect with
      central support
      Engage
      Camera
      Alert
      Employee
      on-Site
      Onsight Expert
      and/or CUPC
      audio/video
      call
      Need to Find
      An Expert
      Internally
      Need to connect
      with Supplier
      Externally
      Share via
      Telepresence*
      and WebEx
      Publish on Portal
      Show & Share
      IM & Webex
      with Supplier
    • 10. Beispiel: Emission Alert
      Derzeit
      17 Steps = 7.8 hours
      10 min
      5 min
      20 min
      2. Database checked to profile potential problem
      1. Dashboard indentifies mixture issue. Reason for problem needs to be determined
      3.Scrubber identified as potential reason for problem
      SCADA monitoring identifies stack gas & temp issue
      15 min
      30 min
      15 min
      20 min
      5. Emission deviation tracking for reports initiated
      4. Maintenance dispatched
      7.Maintenance confirms scrubber
      6.Environmental alerted
      30 min
      20 min
      15 min
      20 min
      30 min
      8.Action conference call with Environmental, Maintenance, Plant Mgr
      9.Decision made to divert emissions and repair scrubber
      10.Maintenance travels to terminal to look up parts list.
      11.Maintenance calls Warehouse Mgr, determines part in stock.
      12.Parts dispatched
      90 min
      15 min
      15 min
      30 min
      90 min
      13.Emissions diverted
      14.Maintenance performs repair
      15.Scrubber back on line
      16.Data for EPA report sent
      17.Report created
    • 11. Beispiel Emission Alert
      IntelligenteKollaboration
      11 Steps = 3.65 hours
      Time Saved = 4.15 hours
      10 min
      5 min
      20 min
      2. Database checked to profile potential problem
      1. Dashboard indentifies mixture issue. Reason for problem needs to be determined
      3.Scrubber identified as potential reason for problem
      Solution components to comprehensive Intelligent Collaboration
      Cisco: VoIP, Presence, Skills Routing, Quad, WebEx, Tidal, Plant Network, Prosumer Video, Show & Share
      Example SAP: BPM, MII, Plant Maintenance, NetWeaver, Business Suite 7, Environmental Compliance
      SCADA monitoring identifies stack gas & temp issue
      2 min
      20 min
      4. Process initiates maintenance dispatch, data tracking, alerts environmental
      5.Maintenance confirms scrubber
      2 min
      20 min
      6.Process initiates collaboration event with Environmental, Maintenance, Plant Mgr, Warehouse Mgr
      90 min
      7.Decision made emissions diverted, stock checked, parts dispatched
      15 min
      15 min
      8.Emissions diverted
      9.Maintenance performs repair
      10.Scrubber back online
      20 min
      11.Data stored & report created
    • 12. Was heuteschonmöglichist…
      VCS
      CUCM
      SIP
      SIP
      SIP
    • 13. … und worauf wir hinarbeiten !
      CUCM
      Video Services
      B2B Konferenzen
      CUCM
      Multipoint Konferenzen
      SIP
      H.323Videosysteme
    • 14. Neue Cisco IP Phones, Video on-board
    • 15. Cisco Cius, das Business Tablet
    • 16. Cisco Jabber, das Collaboration Cockpit
      • Sprache, CTI, IM, Presence, Video, Voicemail, Directory
      • 17. Windows oder Mac OSX
      • 18. Eigener Presence Server oder der Dienst aus der Cloud
      Cisco Movi, das Video Cockpit
      • Spezieller Client für Video
      • 19. Windows oder Mac OSX
      • 20. Spezielle Kamera für HD Qualität bei „normalem“ PC
    • Cisco TelePresence Webex OneTouch
      • Scheduling – gemeinsamePlanungfürTP und Webex
      • 21. Teilnahme – einKlick und man istim Meeting
      • 22. Sprache – TPwähltsichautomatisch in die Webex Session
      • 23. Video – Multipoint Unit sendetkomprimiertes Video an webex
      • 24. Content – wird in beideRichtungenangezeigt
      • 25. AlleweiterenVorteilevon webexnutzen!
    • Operator looks up presence of remote or on-site technical expert on FactoryTalk portal or on Wi-Fi phone and starts video session
      Video Collaboration zwischen Engineering and Produktion
      Librestream Onsight Camera
      WebEx multi site Desktop Collaboration with Librestream Onsight Expert
      Remote engineer needs to bring in other team member/customer
      Views presence of other RA team member within client.
      Clicks on Webex icon inside OnSight Expert to share the video with more team members
      Librestream Onsight
      Expert (desktop client)
    • 26. BeschleunigteProduktEntwicklung und reduzierteReisekostendurchvirtuelleKollaborationsräume
      Video Collaboration Enabled Research and Product Development
      Webex sessions/digital media screens to bring up and share other information e.g., Varian IP database to check if IP related to idea being discussed exists
      Interactive whiteboards enable colleagues in multiple locations to view and draw/mark-up projected documents simultaneously.
      Whiteboard and TelePresence sessions controlled from IP telephone for one-push startup
    • 27. Video wird allgegenwärtig
      Enterprise Social Software
      IP Communications
      Mobile Applications
      Conferencing
      Telepresence / Videoconference
      Customer Care
      Messaging
    • 28. 21
    • 29. CISCO QUAD Release 2.0 - limited availability
      Overview
      Premises-based solution that enables teams & knowledge workers to quickly and securely create, share, and scale content & expertise within organizations.
      Benefits
      • Drive ProductivityConnecting people, communities & information to get work done faster
      • 30. Increase AgilityForm teams, find experts, collaborate instantly
      • 31. Improved ExperienceConsolidated view, fast & easy access to contextual and relevant expertise and information
    • CISCO QUADArchitecture Highlights
      Virtual Data Layer Abstraction to support distributed stores like Hadoop/Hbase
      Social Graph of people, communities and information
      Pervasive support for Video throughout the portal
      OpenSocial Container with full support for both gadgets and Portlets
      Semantic Web Enablement: Support for RDF Stores
      Dynamic User Interface with persistent UI Elements and dynamic updates without page reload via AJAX
      Fine grain policy control with CEPM Integration
      Pervasive support for Unified Communication throughout the portal
      CMIS Support for interoperation with Content Management Systems
      OnPremise, SaaS and Hybrid deployment models
    • 32. Virtual Collaboration Space (VCS) “Where problem solving and innovation accelerate”
      Benefits
      • Fosters interactive dialogue and creativity in a
      comfortable, collaborative environment
      • Ideal for joint content development and/or problem
      solving across multiple sites
      • Reduces travel while enabling broader participation
      in team meetings
      • HD video eases cultural barriers and greatly improves
      the quality of communications
    • 33. Kollaboration in Research und Entwicklung
      Provides manufacturing designers and engineers with real-time collaboration which accelerates time to market, improves the quality of collaboration, gains efficiency through reduced travel, all in a secure environment.
      Main Design Center TelePresense
      Supply Partner TelePresense
      DCV allows active CAD virtualization, collaboration on CAD model and live designer interaction, while full dataset remains secure
      Remote Design Center
      Data Center
    • 34. WebEx Meeting Center at Magna
      Better, faster and more productive collaboration worldwide
      Effective communication unlimited   used for internal and external meetings
      (vendor, supplier, partner)   Engineering and Design Meetings - Online Engagements     with suppliers, such as joint editing of design plans
      • World-wide rollout of audio and web conferencing for about 3,800 people
      • 35.   All Group Companies (Steyr, Cosma, Powertrain, …) benefit from the global framework agreement
      • 36. Highlights after 13 Months:
      • 37. about 3500 meetings per month
      • 38. about 600,000 minutes/month
      • 39. about 4,500 registered hosts / 900 active hosts
    • SUPPLY CHAIN Schlüsselindikatoren
      Reliability
      Forecast Accuracy
      Delivery Performance to Customer Request
      Fill Rates
      Perfect Order Fulfillment
      Responsiveness
      Order Fulfillment Lead Times
      Flexibility
      Supply Chain response time
      Production Flexibility
      Cost
      Inventory Carrying Costs
      Total SC Management Costs
      Value-Added Productivity
      Warranty/Returns Processing costs
      Profitability
      Inventory Turns
      Inventory Days of Supply
      Cash-to-Cash Cycle Time
      Sources: Supply-Chain Council, www.supplychainmetric.com, www.kpilibrary.com
    • 40. MESSKRITERIEN im Design der Supply Chain
      Procurement strategy
      Sourcing & category management
      Requisition to pay
      1
      2
      3
      Supplier relationship management
      Workforce and organization
      Technology
      4
      5
      6
    • 41. MESSKRITERIEN im Design der Supply Chain
      Procurement strategy
      1
    • 42. MESSKRITERIEN im Design der Supply Chain
      Sourcing & category management
      2
    • 43. MESSKRITERIEN im Design der Supply Chain
      Requisition to pay
      3
    • 44. MESSKRITERIEN im Design der Supply Chain
      Supplier relationship management
      4
    • 45. MESSKRITERIEN im Design der Supply Chain
      Workforce and organization
      5
    • 46. MESSKRITERIEN im Design der Supply Chain
      Technology
      6
    • 47. …it is a precise, actionable plan for changing the way companies do business with one resounding piece of advice: swim for open waters.
      WieblauistIhrOzean…
    • 48. WieblauistIhrOzean…
    • 49. ….Machen !
    • 50. …. Machen !
      Started 28 Mar 2011 ... The Domino Project is a new way to….
      do things…
      The job is not to catch up to the status quo,
      The job is to invent the status quo !
    • 51. Das DOMINO PROJECT
      The manifesto is about starting –
      not just “I´m starting to think about it” or “We are going to meet on this”
      No, starting.
      Going beyond the point of no return.
      Making something happen.
    • 52. Das DOMINO PROJECT
      POKE the BOX
      – read it AND hand it on to …. (your choice… and talk about it):
      Things work with curiosity
      The boundary is in the head not in the system.
      Bring value to business operations - they make things go – you need to engage and go beyond the point of no return.
      Make something happen.
    • 53. IntegrierteEchtzeitKollaborationistunumgänglich
      Project Management
      Product Visualization
      Product Metrics
      Real Time Global Collaboration
      Risk Management
      Process Visualization
      Earned Value Analysis
      Program Metrics
    • 54. Danke!
      Fragen und Anregungen?
      MICHAEL.KLEMEN@AON.AT
      MIKLEMEN@CISCO.COM