1st
MEETING CLASS
September 8th
,2012
Friska Miftahkur A.
Semolowaru Bahari XII avenue, number 46|  Post card 60111|Sub-d...
1st
MEETING CLASS
September 8th
,2012
Friska Miftahkur A.
Semolowaru Bahari XII avenue, number 46|  Post card 60111|Sub-d...
1st
MEETING CLASS
September 8th
,2012
Friska Miftahkur A.
Semolowaru Bahari XII avenue, number 46|  Post card 60111|Sub-d...
Upcoming SlideShare
Loading in …5
×

[RBI] course 1 framework

204 views
171 views

Published on

This is my note. all about my course.

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
204
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

[RBI] course 1 framework

  1. 1. 1st MEETING CLASS September 8th ,2012 Friska Miftahkur A. Semolowaru Bahari XII avenue, number 46|  Post card 60111|Sub-district of Sukolilo | District of Surabaya | Province of East Java | Indonesia |  Mobile number : +6285731959259 |  email address : miftahkur@yahoo.com, avijanto@gmail.com RISK BASED INSPECTION (ME 091232) Teach by : Ir. Dwi Priyanta Goal Setting : Making a spreadsheet modeling Text book : API 581 (2008) and PAS 55 Motto : Overlaping study… & be patient at last. Keywords : “The revolunary idea that defines the boundary between modern time and past time is MASTERY of RISK” Course Outline 1. Asset Integrity  Discuss about present a global description  The way for keeping asset integrity besides otherway as maintenance management 2. Consept of Risk  How risk might be happened, how to prevent it being happened, risk presentation 3. Consept of Risk Based Maintenance  How to prioritize maintenance based it risk.  Screening for top risk or High risk then desired how to maintenance. 4. Concluding Remarks  Highlight for Why the implementation of RBI failed. Review A. Definition Asset 1. Physical Assets : there is something What have a distinct value to the organization. 2. It’s all must already and functionable. B. PAS 55 for determined type of Assets, such as : (PAS 55.uk introduce for ISO :5500) 1. Total Bussines Vital Context : Bussines object, policies, regulation, performance 2. Human Asset Important Interface : Motivation, Communication, Rules And Responsible, Knowledge, Experience, Leadership And Teamwork. 3. Information Asset Importance Interface : Condition, Performance, Activities, Cost, Opportunities. 4. Intangible Asset Importance Interface : Reputation, Image, Morale, Constraints, Social Impact
  2. 2. 1st MEETING CLASS September 8th ,2012 Friska Miftahkur A. Semolowaru Bahari XII avenue, number 46|  Post card 60111|Sub-district of Sukolilo | District of Surabaya | Province of East Java | Indonesia |  Mobile number : +6285731959259 |  email address : miftahkur@yahoo.com, avijanto@gmail.com 5. Financial Asset Importance Interface : Life Cost, Capital Investment Criteria, Operating Cost, Cycle Value Of Asset Performance. C. Asset Disintegrated If coresspodence between assets being disintegrated, it will broke a system then caused disproduction. PS : Life Extention Program Asset Integrity Management  Asset Integrity : the ability of an asset to perform its required function effectively and efficiently whilst protecting Healt, Safety and the Environment  Asset Integrity Management : Management Activities to ensure that the people, Systems, Process and Resources that deliver integrity are in people, in use and will performance required over the whole lifecycle of the asset. D. Maturity Level 1. Level 1 (Basic) Focused to Management Asset  How to do Regular Inspection, Maintenance, Monitoring, safe Operation  Operational and Process support  Documentation, dat management, CMMS (Computerized Maintenance Management System) 2. Level 2 (Moderate) Focused on Asset Integrity Assurance Process  Asset Integrity Assessment for Basic Maintenance, ordinary maintenance.  Risk Based Inspection  Inspection (Advance Technology)  For Analyze at Integrity must be overall, than randomly must be determined that base or range. 3. Level 3 (Advance) Focused on Asset Optimization ( Next if describe of discontinued focus and not for rotatin machinery)  Remaining Life Assessment  Asset Life Extentions  Bussiness and Financial Modelling 4. That Destination that will request is :  Optimized Inspection and Maintenance Strategies  Extended Intervals between planned outages  Reduction inforced outages  Increased plant Availability  Extend Plant life
  3. 3. 1st MEETING CLASS September 8th ,2012 Friska Miftahkur A. Semolowaru Bahari XII avenue, number 46|  Post card 60111|Sub-district of Sukolilo | District of Surabaya | Province of East Java | Indonesia |  Mobile number : +6285731959259 |  email address : miftahkur@yahoo.com, avijanto@gmail.com E. Consept of Risk  Describe for futuristic time, How to measured risk then solve it,.. F. James Reason’s Describe of Swiss Cheese of Accident Causation Read : http://www.evidenceintopractice.scot.nhs.uk/patient-safety/what-is-patient-safety-aspx TOTAL BUSINESS PHYSICAL ASSET HUMAN ASSETS INFORMATION ASSETS INTANGIBLE ASSETS HAKI (Hak Kekayaan Intelektual), ex : Kepercayaan PublikFINANCIAL ASSETS Source Of Risk Cause Of Risk Risk Consequenc e +

×