Concept Design- Gavin Orton, MADE City Builder Academy 2013

620 views
497 views

Published on

Presentation given by Gavin Orton of BPN Architects at MADE's July 2013 City Builder Academy. This presentation follows the design process for a recent project completed by BPN Architects. Also included are the career routes and education requirements for becoming a qualified architect

Published in: Education, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
620
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
13
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Concept Design- Gavin Orton, MADE City Builder Academy 2013

  1. 1. BPN ARCHITECTS GAVIN ORTON
  2. 2. DARTMOUTH PARK PAVILION PROJECT OVERVIEW 1. Brief development 2. Concept Design 3. Developed Design 4. Technical Design 5. Construction 6. Post-construction
  3. 3. 1. BRIEF DEVELOPMENT
  4. 4. The local community including residents, schools, groups and organisations
  5. 5. 2. CONCEPT DESIGN
  6. 6. “Pythagoras of Samos was the first to fashion the letter Y into a pattern of human life. The straight portion at the bottom signifies the first, uncertain age, which at that point has been given over neither vices nor virtues. The bifurcation at the top, however, begins at adolescence. The path to the right is difficult, but it tends toward a blessed life. The path to the left is easier, but leads to ruin and destruction.” Isidore of Serville (c.560-636 CE)
  7. 7. The Choice of Hercules “…on the verge of manhood, he is contemplating his future when two women appear to him. One, Vice, eager and seductive, shows him a path which seems to offer easy progress to a life of indolent pleasure. The other, tall and beautiful and identified as Virtue, warns Hercules that what is truly good can only be obtained through hard effort; and only then can Hercules gain supreme glory.”
  8. 8. the programme
  9. 9. the woodland walk
  10. 10. the woodland walk
  11. 11. the woodland walk
  12. 12. the tree house
  13. 13. the tree house
  14. 14. 3. DETAILED DESIGN
  15. 15. 4. TECHNICAL DESIGN
  16. 16. 04 161.200 S07 toilets refer to drawing 1770.2001 for details 160.200 t folddown babychange wash basin SD Disabled W.C. (left hand arrangement) / Baby Change Male W.C. SD SD light well over communal wash area HD t t t Female W.C. 100 2000 100 925 1690 100 778 1000 100 100 900 100 bins / storage / plant events room refer to drawing 1770.2038 for details concealeddropdownprojectionscreen disabled W.C. (right hand arrangement N13/311) store store boiler vending machine vending machine power & mainsdrinking watersupply required forvending machines roller shutter electrical equipment store LANDING 160.200 159.500 ramp 1 : 20 500mm rise 159.520 S06 office refer to drawing 1770.2036 for details snack bar refer to drawing 1770.2035 for details wall mountedtv S05 foyer additional storage above vending machines void area under ramp ramp 1 : 20 500mm rise ramp 1 : 15 330mm rise ramp 1 : 15 330mm rise 161.200 159.500 159.500 160.200 160.050 161.200 projector recessed within suspended ceiling wall mounted display cabinet timber bench Office a/c unitSnack Bar a/c unit Events room a/c unit basin N13/331a ENTRANCE LEVEL 159.500 'slotted'drainagechannelsinfloor.Armtecorsimilarapproved beam and block floor construction spaced to allow for drainage channel 'slotted'drainagechannelinfloor.Armoc HexDrainorsimilarapproved RWP AAV SVP SVP SVP RWP 1022.5 S04 159.500 HD staff room refer to drawing 1770.2037 for detailsstainlesssteel meshtocloseoff voidareaunder ramp D03 (FD30s) D04 D05 (FD30s) D06 D08 (FD60s) D09 D10 D11 D12 D13 D14 (FD30s) D15 D16 D17 D18 (FD30s) D19 W01 W03 W04 W05 W06 S01 S02S03 W02 Handrail centrally located on stair to divide width Cleaner's store store D07 RWP W01 w.c., shower and staff changing area t SVP RWP D01 (FD30s) D02 4no. lockers HD highlevelshelving powersocketsabovedeskheight power sockets above desk height plasterboard on timber battens with a skim coat and paint finish stackable chair store D20b D20a stackable chair store LANDING 159.710 ramp 1 : 20 210mm rise ramp 1 : 20 210mm rise LANDING 159.990 ramp 1 : 20 280mm rise 4 steps@170mm/rise LANDING 161.200 LANDING 161.530 LANDING 160.700 161.530 10 no. secure cycle spaces refer to bpn drawing 1770.2058 dashed line indicates external trunking above dashed line indicatesexternal trunking above 2485 2000 2000 2000 2000 2000 2500 1700 2000 2000 2100 21002000 2100100020002260 1000 2000 2000 1000 2000 2100 2100 2000 2000 2000 2000 2000 2000 2100 2100 2000 1300 2000 303 2000 1227.5 2485 3590 1585 1418 1115 1810 3497.5 5045 2300 1022.5 2915 1565 1585 2710 1902.5 4195 1810 2240 9091585 4000 10000 2000 5000 158520184715 49404397.51002.5 11151810134031601564.91022.5 9658 7179.5 17530352270 3610 3 2 1 A CB D 826160504290 10340 1782 18102 10.00° A B A B 4 C C Facing brickwork F10/110, F10/110a Blockwork F10/355 Softwood vertical timber board (100mm) lining with paint finish K21/160 FP FP FP FB FP FP FB Fire point stand with 2.5kg carbon dioxide & 9 litre water and fire proceedure signage over Fire blanket fitted to wall and fire proceedure signage over bryantpriestnewman ©. Do not scale off drawing. Check all dimensions on site and advise any discrepancies before commencing work. All figured dimensions are millimetres unless otherwise stated. Location plans subject to © Crown Copyright. dr = drawn by, ch = checked by b r y a n t p r i e s t n e w m a n l t d a r c h i t e c t s 3 m a r y s t r e e t b i r m i n g h a m B 3 1 U D t : 0 1 2 1 2 3 3 1 8 1 8 f : 0 1 2 1 2 3 3 1 1 1 8 w w w . b r y a n t p r i e s t n e w m a n . c o m m a i l @ b r y a n t p r i e s t n e w m a n . c o m 1:50 @A1 1:100@A3 C10 drawing revision scale date revisions drawn by checked by Dartmouth Park Community Pavilion - West Bromwich Ground Floor Plan 1770.1001 10.09 TD LP C1 - Construction issue - 110118 (dr TD/ch RS) C2 - Revisions as indicated - 110204 (dr GO/ch RS) C3 - Revisions as indicated + timber cladding profiles indicated - 110304 (dr MC/ch RS) C4 - Revisions as indicated - 110404 (dr MC/ch RS) C5 - Revisions as indicated - 110608 (dr MC/ch RS) C6 - Revisions as indicated - 110614 (dr MC/ch RS) C7 - Revisions as indicated - 110616 (dr MC/ch RS) C8 - Revisions as indicated - 110819 (dr MC/ch RS) C9 - Revisions as indicated - 110608 (dr MC/ch RS) C10 - FINAL CONSTRUCTION ISSUE - 111028 02 04 04 04 04 05 03 03 03 Identified construction hazard 01. Working within a park enviroment which will be partially open to the public. Risk Members of the public and particularly children moving in close proximity to site, and potentially attempting to enter site itself. Dangers associated with moving materials through populated park environment. Potential construction hazards identified by Architect 02. It is understood that the remains of a former park pavilion building may be located below ground level on the site. The full extent of this is unknown, There is a also a slight risk that there are old basements from the building and possibly services infastructure Guidance Risk assessment to be undertaken by contractor to establish safe strategy for securing site and transporting materials from the road to the site. Strategy to be developed and coordinated with wider park regeneration and SMBC Park's Manager. Due care and attention to be paid whilst initial excavation works are carried out. 03. Handling and fixing of steel structure to tower, large lintels and steel beams. Risk of steel falling. Risks associated with working at height. Safe working procedures, exclsuion zones and risk assessments to be in place 04. Handling and fixing of large timber elements to ramped walkway that can not be safely carried / fixed by one indivdual. Also fixing of oversized timber elements at height. Risk of timber falling, injuries due to carrying heavy items. Risk of falling from height. 05. Handling of large beam and block floor elements. Risk of large items falling and injuring construction workers. 06. Working in close proximity to existing trees. Restricted crane access/maneuverability due to proximity of trees, danger of collision with tree canopies. Adequate protection of tree canopies and work to be carried out in accordance with BS 5837Debris falling from trees onto site. 07. Handling and fixing of large timber cladding elements to tower at height Risk of construction workers and/or large timbers falliing . Risk assessments and method statement to the erectling of large timber section to ensure safe handling by operates within permissible manual handling limits Ensure operatve have adequate PPE and appropriate working methods to protect against falling / injury Risk assessments and method statement to the erectling of large timber section to ensure safe handling by operates within permissible manual handling limits. Timber to be designed to allow cranage where necessary REFER TO EXTERNAL WORKS DRAWING 1770.1000 FOR DETAILS OF TERRACE AREA REFER TO EXTERNAL WORKS DRAWING 1770.1000 FOR DETAILS OF ENTRANCE AREA N
  17. 17. bryantpriestnewman ©. Do not scale off drawing. Check all dimensions on site and advise any discrepancies before commencing work. All figured dimensions are millimetres unless otherwise stated. Location plans subject to © Crown Copyright. dr = drawn by, ch = checked by b r y a n t p r i e s t n e w m a n l t d a r c h i t e c t s 3 m a r y s t r e e t b i r m i n g h a m B 3 1 U D t : 0 1 2 1 2 3 3 1 8 1 8 f : 0 1 2 1 2 3 3 1 1 1 8 w w w . b r y a n t p r i e s t n e w m a n . c o m m a i l @ b r y a n t p r i e s t n e w m a n . c o m 1:50 @A1 1:100 @A3 C5 drawing revision scale date revisions drawn by checked by Dartmouth Park Community Pavilion - West Bromwich Section A-A 1770.1010 10.09 RS LP C1 - Construction issue - 110118 (dr TD / ch RS) C2 - General revisions throughout - 110304 (dr MC / ch RS) C3 - Revisions as indicated - 110314 (dr MC / ch RS) C4 - Revisions as indicated + detail removed from internal elevations to avoid confilcting information - 110408 (dr MC / ch RS) C5 - FINAL CONSTRUCTION ISSUE - 111028 1st FFL 162.580 (TOS 162.540) 2nd FFL 164.880 (TOS 164.840) 3rd FFL 167.180 (TOS 167.140) 4th FFL 169.480 (TOS 169.440) 159.500 entrance 30802300230023001800 160.200 entrance landing 161.200 events space 171.280 161.200 161.200 161.950 163.460 165.325 164.805 timber cladding not shown for clarity. For timber cladding setting out see BPN drawings 1770.2021-2027 events room for details see BPN drawing 1770.2038 3225 159.500 160.560 161.910 163.700 162.580 2625 2625 159.500 'woodland walk' for cladding details see BPN drawing 1770.2020 snack bar for details see BPN drawing 1770.2035 office for details see BPN drawing 1770.2036 'woodland walk' 160.1375 15012510012013 Aluminium coping 150mm minimum upstand above sedum to the underside of the aluminium coping insulated cavity closer to the top of all cavity walls 12.5 mm plasterboard / acoustic plasterboard with taped and filled joints on metal frame system to create a 120mm service void for small power and small bore piped services and to enable linear light fittings to be recessed - refer to ceiling plan for detail of plaster finishes concrete plank roof plaster, skim coat and paint finish to walls window frames - refer to separate window schedule for details door, frame and architraves Concrete plank roof Cavity trays preformed cavity tray to the perimeter of the roof terrace - see adjacent specification 300 cavity insulation to overlap roof insulation by a minimum 300mm to minimise cold bridging 300 Metal deck to terrace - fixing details to be confirmed ground bearing slab to structural engineers details Hyload Original damp proof course at finished floor level and a minimum 150mm above adjoining ground level - DPC to inner leaf to be lapped and continuously sealed to below slab DPM concrete cavity fill up to ground level and with 150mm of slab level 150 25mm thick perimeter insulation to the edge of the slab to minimise cold bridging softwood vertical boarding with a painted finish on 25mm timber horizontal battens at max 400mm centres fixed to inner leaf of blockwork Metal deck to roof terrace - fixing details to be confirmed 102 100 102 toilets refer to drawing 1770.2001 for details 160.200 t folddown babychange wash basin SD Cleaner's store Disabled W.C. (left hand arrangement) / Baby Change Male W.C. SD SD light well over communal wash area HD t t t Female W.C. 100 100 100 100 100 100 basin bins / storage / plant events room refer to drawing 1770.2038 for details concealeddropdownprojectionscreen disabled W.C. (right hand arrangement N13/311 ) store store boiler store large vending machine 700x920mm large vending machine 700x920mm power & mainsdrinking watersupply required forvending machinesroller shutter electrical equipment store LANDING 160.200 159.500 ramp 1 : 20 500mm rise 159.520 S06 office refer to drawing 1770.2036 for details snack barrefer to drawing 1770.2035 for details S05 foyer timber bench void area under ramp ramp 1 : 20 500mm rise ramp 1 : 15 330mm rise ramp 1 : 15 330mm rise 161.200 159.500 159.500 160.200 160.050 159.990 161.200 161.200 6 steps@167mm/rise stackable chair store projector recessed within suspended ceiling S07 timber bench timber bench Office a/c unitSnack Bar a/c unit Events room a/c unit ENTRANCE LEVEL 159.500 'slotted'drainagechannelsinfloor.Armtecorsimilarapproved 'slotted'drainagechannelinfloor.Armtecorsimilarapproved RWP AAV SVP SVP SVP RWP RWP S04 159.500 raised section of timber bench to form back rest HD w.c., shower and staff changing area staff roomrefer to drawing 1770.2037 for details t SVP RWP stainlesssteel meshtocloseoff voidareaunder ramp D01 D02 D03 D04 D05 D06 D07 (FD30s) D08 D09 D10 D11 D12 D13 D14 (FD30s) D15 (FD30s) D16 D17 D18 D19 D20 W01 W03 W04 W05 W06 S01 S02S03 W02 4no. lockers LANDING 159.710 ramp 1 : 20 210mm rise ramp 1 : 20 210mm rise LANDING 159.990 ramp 1 : 20 280mm rise 4 steps@170mm/rise LANDING 161.200 LANDING 161.530 LANDING 160.700 161.530 2485 2000 9658 7179.5 A B A BE E C C D D Section A-A Preformed weep holes Beak weep by Cavity Trays of Yeovil, Somerset, BA22 8HU. (01935 474769). Build into perp joints over lintels, trays and DPCs at 450mm centres. Installation/site work - Position in perp on DPC, in accordance with manufacturers instructions. Spacing at 450mm centres in accordance with NHBC andBRE recommendations. Cavity Trays Type P cavitray from Cavity Trays of Yeovil, Somerset. BA228HU (01935) 474769. Lay preformed Type P parapet cavitray lengths and angles within appropriate mortar bed as work proceeds. Glove lap and seal adjoining lengths. Incorporate roof lead flashing to detail. Observe accompanying fitting instructions at all times. Apron flashings Ubiflex non-lead flashing by Ubbink (UK) Ltd. Borough Road, Brackley, Northants NN13 7TB Tel: 0845 456 3499 When installing with DPC / Cavity Tray Ubiflex should be installed at the same time, the Ubiflex should be fitted to a depth of not less than 50mm with the edge turned back into a single welt to anchor it into the mortar. Ubiflex should then be held in place with Ubiflex fixing clips, spaced not more than 450mm apart and then the joint filled with Ubiflex Gap-Seal Ubiflex should cover the upstand by at least 75mm and be sealed to it with a continuous bead of High-Tack sealant. The height of the upstand should be at least 150mm. Overlap joints of 150mm are required in all flashings and must be sealed with Ubiflex High-Tack.
  18. 18. steel angle with pre-drilled holes (85mm centres) fixed back to UB to S.E. specification steel angle with pre-drilled holes (85mm centres) fixed back to UB to S.E. specification position of metal floor planks where appropriate Steelwork to S.E. details Oak cladding piece coach bolted back to steel angles Oak cladding piece coach bolted back to steel angles SECTION 1 steel angle with pre-drilled holes (85mm centres) fixed back to UB to S.E. specification steel angle with pre-drilled holes (85mm centres) fixed back to UB to S.E. specification position of metal floor planks where appropriate Steelwork to S.E. details Oak cladding piece coach bolted back to steel angles Oak cladding piece coach bolted back to steel angles SECTION 2 162.580 First floor terrace 164.880 Second floor 167.180 Third floor 169.480 Fourth floor thick line denoting parapet / roof level of brick accomodation blocks below Detail 2 Detail 1 thick line denoting parapet / roof level of brick accomodation blocks below 14270 6250 87522903065 8260 1655229022901990 Feature graphics stained onto timber S12 brick pavers Timber deck laid onto brick plinth 159.500 terrace ramped d o w n to meet path terrace level with grass 159.500 160.315 159.650 159.800 159.950 160.150 Timber decked seating area timber decked terrace Brick pavers to match foyer toilets 160.200 folddown babychange w a s h basin S D Cleaner's s t o r eD i s a b l e d W.C. (left hand arrangement) / Baby C h a n g e Male W. C. S D S D roof light o v e r c o m m u n a l wash area HD bin & storage a b o v e t t t Female W. C. 1 0 0 2 0 0 0 1 0 0 9 2 5 1 6 9 0 1 0 0 7 7 8 1 0 0 0 100 1 0 0 1300 1 0 0 b a s i n bins / storage / plant events room concealeddropdownprojectionscreen timber bench seating around perimeter disabled W. C. (right hand arrangement) s t o r e s t o r e boiler s t o r e l a r g e vending machine7 0 0 x 9 2 0 m m l a r g e vending machine7 0 0 x 9 2 0 m m p o w e r & mainsdrinking watersupply required forv e n d i n g machines r o l l e r shutter electrical e q u i p m e n t store LANDING 160.200 159.500 ramp 1 : 20 500mm rise 159.520 pivoted oak door t o match timber s c r e e n o a k door to match timber screen office snack bar highlevel shelving barcounter bin / cleaning storage highlevel counter withshelving wall/cupboard doors withmagnetic white board finish wall mountedtv d i s h w a s h e r wallmountedinsectkiller hand- w a s h storage/ coatsetc storage CCTVmonitors powersockets above tableheight s a f e with shelvesa b o v e galvanised steel s e c u r i t y s c r e e n s t a b l e door galvanised steel s e c u r i t y s c r e e n foyer b e n c h & c o a t h o o k s b a s i n a n d m i r r o r tea point full h e i g h t l o c k e r full h e i g h t l o c k e r full h e i g h t l o c k e r 2 x half h e i g h t lockers fridge storage storage b i n s / cleaning c o a t h o o k s f o r wet clothes / boots w . c. and staff changing area staff room b e n c h additional storage above vending machines timber bench / display unit v o i d area under r a m p ramp 1 : 20 500mm rise ramp 1 : 1 5 330mm rise ramp 1 : 1 5 330mm rise 161.200 159.500 159.500 159.500 160.200 160.050 159.990 timberbenchseatingaroundperimeter 161.200 161.200 6 steps @ 167mm/rise s t a c k a b l e chair store edgeofboxedoutbeamoverhead projector recessed within suspended ceiling l o w e r timber bench / step + 5 0 0 m m + 2 5 0 m m steel security gate fridge hot drinks m a k e r chilled displaycabinet with storageb e l o w storage b e l o wcounter cash register a c c e s s micro -wave glazed display cabinetb u i l t into wall slidingwindow sliding window timber b e n c h timber b e n c h O f fi c e a/c unitS n a c k Bar a/c unit E v e n t s room a/c unit drainagechannelinfloorbelowpivoteddoor d r a i n a g e channel in floor b a s i n timber b e n c h timber b e n c h ENTRANCE LEVEL 159.500 LANDING 159.710 ramp 1 : 20 210mm rise ramp 1 : 20 210mm rise LANDING 159.990 ramp 1 : 20 280mm rise 4 steps @ 170mm/rise LANDING 161.200 LANDING 161.530 LANDING 160.700 161.530 bryantpriestnewman ©. Do not scale off drawing. Check all dimensions on site and advise any discrepancies before commencing work. All figured dimensions are millimetres unless otherwise stated. Location plans subject to © Crown Copyright. dr = drawn by, ch = checked by b r y a n t p r i e s t n e w m a n l t d a r c h i t e c t s 3 m a r y s t r e e t b i r m i n g h a m B 3 1 U D t : 0 1 2 1 2 3 3 1 8 1 8 f : 0 1 2 1 2 3 3 1 1 1 8 w w w . b r y a n t p r i e s t n e w m a n . c o m m a i l @ b r y a n t p r i e s t n e w m a n . c o m 1:25 @A1 1:50 @A3 C5 drawing revision scale date revisions drawn by checked by Dartmouth Park Community Pavilion - West Bromwich 1770.2025 07.10 TD LPWest Tower Elevation Cladding C1 - Construction issue - 110118 (dr TD / ch RS) C2 - Revisions as indicated + cladding quantities and spacing revised - 110304 (dr MC / ch RS) C3 - Revisions as indicated + painted feature graphics removed - 110613 (dr MC / ch RS) C4 - Revisions as indicated - 110617 (dr MC / ch RS) C5 - FINAL CONSTRUCTION ISSUE - 111028 Typical fixing detail 1 Scale: 1:10 West Elevation Tower Cladding Typical fixing detail 2 Scale: 1:10 'STACKED' CONDITION 'OVERLAP' CONDITION Notes: Refer to BPN drawing 1770.2020 for further details of timber screen KEY TO TIMBER CLADDING NOTE: Any treated surfaces of large section timbers exposed by unavoidable cross cutting should be liberally brushed with ENSELE end grain preservative solution. Oak cladding element. 100mm (D) x 75mm (W) x as drawn (H). Oak cladding element. 75mm (D) x 75mm (W) x as drawn (H). Oak cladding element. 50mm (D) x 75mm (W) x as drawn (H). ALL TIMBER CLADDING TO TOWER TO BE GREEN OAK WITH NO FIRE PROTECTION TREATMENT FINAL CONSTRUCTION ISSUE
  19. 19. Wall Finishes Exposed blockwork with masonry paint finish - paint colour tbc (F10/355) Exposed brickwork (F10/110) T&G, square edge, softwood lining with 'Arch Chemicals' - 'Dricon' fire retardency and eggshell paint finish - paint colour tbc Plasterboard, skim and paint - paint colour tbc Floor Finishes Brick pavers (F10/110a) Marmoleum (Product: Walton uni or cirrus range, 2m sheets with welded joints) 400 2500 boiler to mechanical engineers spec wall mounted fold down baby change unit brickwork beyond blockwork beyond Female W.C. Disabled W.C. Male W.C. Store exposed blockwork walls to be painted Gyproc Wallboard on MF system with a clear service void above. brickwork beyond brickwork beyondFemale W.C. Male W.C. Store 1960100 D08 D10 SD SD SD brickwork beyond brickwork beyond blockwork beyond Wash area recess in suspended ceiling with feature lighting (detail tbc) 800275 D10 D08 painted softwood lining painted softwood lining TP ARPTSDHD 2500 brickwork beyond blockwork beyond Disabled W.C. Gyproc Wallboard on MF system with a clear service void above painted softwood lining brickwork beyond blockwork beyond Male W.C. Wash area painted softwood lining TP AR PT SD HD blockwork beyond Female W.C. Disabled W.C. exposed blockwork walls to be painted D11D12D13 100mm marmoleum upstand 2400 service void HD HD blockwork beyond Male W.C. Wash area recess in suspended ceiling with feature lighting 2135 1100 800 2500 painted softwood lining Disabled W.C. exposed blockwork walls to be painted Gyproc Wallboard on MF system with 120mm clear void above to allow for services and light fittings. light well over communal wash area disabled W.C. (right hand arrangement N13/311) store boiler Office a/c unitSnack Bar a/c unit Events room a/c unit SVP RWP RWP D16 Cleaner's store Female W.C. toilets t folddown babychange wash basin SD Disabled W.C. (left hand arrangement) / Baby Change Male W.C. SD SD t t t 2000 100 925 1687 100 778100 889 100 D8 D9 D10 D11 D12 D13 410 488 HDHD 1000 2300 100 2077 128 900 1120 1695 705103036418201000 100753100753100753100 322 100753709 359 2200 925 1285 Boiler Room 1498 1285 2200 600x600 access hatch 600x600 access hatch 150 150 ==600 B A A B C C D D E E F F GG H H bryantpriestnewman ©. Do not scale off drawing. Check all dimensions on site and advise any discrepancies before commencing work. All figured dimensions are millimetres unless otherwise stated. Location plans subject to © Crown Copyright. dr = drawn by, ch = checked by b r y a n t p r i e s t n e w m a n l t d a r c h i t e c t s 3 m a r y s t r e e t b i r m i n g h a m B 3 1 U D t : 0 1 2 1 2 3 3 1 8 1 8 f : 0 1 2 1 2 3 3 1 1 1 8 w w w . b r y a n t p r i e s t n e w m a n . c o m m a i l @ b r y a n t p r i e s t n e w m a n . c o m 1:50 @A1 C6 drawing revision scale date revisions drawn by checked by Dartmouth Park Community Pavilion - West Bromwich Toilet Details - Plan / Elevation 1770.2001 07.04.10 MC LP C1 - Construction issue - 110118 (dr TD / ch RS) C2 - General revisions - 110404 (dr MC / ch LP) C3 - General revisions - 110613 (dr MC / ch LP) C4 - Dimensions added to toilet layout - 110803 (dr GO / ch LP) C5 - Access hatch shown on plan - 110819 (dr MC / ch LP) C6 - FINAL CONSTRUCTION ISSUE - 111028 Elevation A Elevation B Elevation C Elevation D Elevation E Elevation F Elevation G Elevation H Toilet roll dispenser: to Williams Ironmongery schedule Coat hook: to Williams Ironmongery schedule Room / Fitting Male WC Female WC WCs Washbasins Wall mounted urinal by Armitage Shanks from the Contour range or similar N13/315a Urinals N/A Wall mounted WC by Armitage Shanks from the Braemar range or similar. Colour: White N13/300b Taps Wall mounted WC by Armitage Shanks from the Braemar range or similar. Colour: White N13/300b N/A Accessories N/A N/A Wall mounted stainless steel wash trough. N13/346 Hand wash area N/AN/A Contour 21 Basin mixer by Armitage Shanks. Soap dispenser: to Williams Ironmongery schedule Semi recesssed Velocity high speed hot air hand dryer by Dolphin - satin stainless steel N13/472a N/A Toilet roll dispenser: to Williams Ironmongery schedule Coat hook: to Williams Ironmongery schedule Standard doc M pack N13/311 Disabled WC N/AStandard doc M pack N13/311 Standard doc M pack N13/311 Standard doc M pack N13/311 Baby changing unit N13/449a Armitage Shanks 310mm Alder sink N13/331a Cleaners Store N/AN/A N/A N/A IPS Armitage Venesta Tough Wall system with solid laminate access panels Armitage Venesta Tough Wall system with solid laminate access panels N/A N/A N/A light well over communal wash area disabled W.C. (right hand arrangement N13/311) store boiler Office a/c unitSnack Bar a/c unit Events room a/c unit SVP RWP RWP D16 Cleaner's store Female W.C. toilets t folddown babychange wash basin SD Disabled W.C. (left hand arrangement) / Baby Change Male W.C. SD SD t t t 2000 100 925 1687 100 778100 889 100 D8 D9 D10 D11 D12 D13 410 488 HDHD 1000 2300 100 2077 128 900 1120 1695 705103036418201000 100753100753100753100 322 100753709 359 2200 925 1285 Boiler Room 1498 1285 2200 600x600 access hatch 600x600 access hatch 150 150 ==600 1001010010 Timber lining details 1:5 MF suspended ceiling stud wall T&G square edge softwood lining with paint finish stud wall fixed through DPM 10mm shadow gap to top and bottom of lining 10mm shadow gap to top and bottom of lining
  20. 20. bryantpriestnewman ©. Do not scale off drawing. Check all dimensions on site and advise any discrepancies before commencing work. All figured dimensions are millimetres unless otherwise stated. Location plans subject to © Crown Copyright. dr = drawn by, ch = checked by C1 - Initial construction issue - 110805 C2 - Revisions as indicated - 111017 C3 - FINAL CONSTRUCTION ISSUE - 111028 b r y a n t p r i e s t n e w m a n l t d a r c h i t e c t s 3 m a r y s t r e e t b i r m i n g h a m B 3 1 U D t : 0 1 2 1 2 3 3 1 8 1 8 f : 0 1 2 1 2 3 3 1 1 1 8 w w w . b r y a n t p r i e s t n e w m a n . c o m m a i l @ b r y a n t p r i e s t n e w m a n . c o m DARTMOUTH PARK PAVILION | WEST BROMWICH 1:25 @ A3 1770.2058 06.2011 MC GOFOYER STAIT BALUSTRADE DETAIL C3 drawing revision scale date revisions drawn by checked by 1290 300 handrail to have 300mm minimum overun SHS post to SE specification Galvanised steel plate 18x150 oak patress following gradient of stair 75x75 green oak sections @ 140mm centres fixed to internal face of galvanised plate 10mm galvanised string at handrail level to SE specification Galvanised steel plate fixed concrete sub base (to SE details) before brick pavers are laid over 75x75mm timber sections Galvanised steel plate timber handrail fixed to 18x150mm oak patress Steel column Galvanised steel plate fixed concrete sub base (to SE details) before brick pavers are laid over 251150 75x75mm hollow steel section TYPICAL ELEVATION A TYPICAL ELEVATION B PLAN prim ary structure tim bercladding tim berhandrail 1150 950 EXPLODED AXONOMETRIC
  21. 21. 5. CONSTRUCTION
  22. 22. 6. POST-CONSTRUCTION
  23. 23. BPN ARCHITECTS GAVIN ORTON Questions?

×