The Magnolia Residences Condominium at New Manila Quezon City

540 views
400 views

Published on

For Robinsons Residences Project Details::
Call: Marievic Reyes
Cell #: (+63) 9057642628 / (+63) 9339590866
Email: mharvie1228@gmail.com
Website: http://mavicproperties.blogspot.com

Open and airy spaces that are evocative of the blissful and grand atmosphere of the past continue from the neighborhood of Magnolia Residences through its one-bedroom, two-bedroom, executive two-bedroom, and three-bedroom units.

The Magnolia Residences provides residents with amenities that are reminiscent of sunny days with the family around the BBQ pit or lounging beside the pool.

Tower A:
Multi-purpose Room
Gym
Locker Room
Shower Room
Children's playroom
Game Room
Library
Zen Garden

Tower B:
Function Room
Jogging Path
Swimming Pool
Children's Pool
Barbeque Pit
Gazebos
Sun Deck Function Area
Rock Garden
Open Lawn

Tower C:
Function Room
Multi-purpose Room
Badminton Court
Table Tennis Room
Fitness Station
Wading Pool / Jacuzzi
Tree House
Children's Outdoor Playground

Available Unit:

Tower A
1BR (36sqm - 47.98sqm) P 3M - 4.8M
2BR (58.52sqm - 59.10sqm) P 5.2M - 5.7M
EXECUTIVE 2BR (77.25sqm - 79.20sqm) P 6.5M - 7.8M

Tower B
1BR (36sqm - 38.10sqm) P 2.9M - 3.4M
2BR (57.15sqm - 71.10sqm) P 4.6M - 6.1M
EXECUTIVE 2BR (72.90sqm - 90.15sqm) P 6.1M - 8.4M
3BR (108.10sqm - 114.60sqm) P9.7M - 10.3M

Tower C
1BR (36sqm - 63sqm) P 4.1M - 4.5M
2BR (57.15sqm - 92.05sqm) P 6.6M - 8.1M
EXECUTIVE 2BR (72sqm - 101.16sqm) P 8.8M - 10.8M

Building Facilities and Features Include:

Three (3) elevators (2 passenger elevators and 1 service elevator)
Main entrance lobby at the Upper Mezzanine Floor and elevator lobby at all floors
CCTV monitoring of selected common areas
Automatic smoke detectors and fire alarm with sprinkler system at all common areas
Annunciator panel with emergency speaker at all floors
Standby power generator for common areas and selected outlets in the residential unit
Strategically located Fire Exits
4 Levels of Parking

Unit Features:
Entrance panel door with viewer
Intercom per unit connected to the Security/Reception counter
Provisions for:
Individual electric and water meter
Cable TV line
Telephone line
Electrical Power provision for owner-supplied window-type air conditioners
Electrical Load Provision of 40 amperes for Electric Range
Electrical Load Provision of 20 amperes for Refrigerator
Ventilation for kitchen and toilets
Provision for multipoint water heater line (excluding water heater) for Toilet
Automatic smoke detectors and fire alarm with sprinkler system in all units
Utility Room with toilet for selected 2BR and 3BR units
Balconies at selected 2BR and 3BR units

For more info and site viewing:
Account Manager - Mavic Reyes
Tel. #: 09272733488 / 09339590866
Email: mharvie1228@gmail.com

Published in: Real Estate
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
540
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
1
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide
  • Welcome to the Technical Briefing for Tower A of The Magnolia Residences.
  • New perspective
  • New building perspective
  • Colored keyplan
  • Colored keyplan
  • Colored keyplan
  • Colored keyplan
  • Colored keyplan
  • Colored keyplan
  • Zone 2 colored plan
  • Colored unitized
  • Colored keyplan
  • Zone 2 colored plan
  • Colored keyplan
  • Colored keyplan
  • Colored keyplan
  • Colored keyplan
  • The Magnolia Residences Condominium at New Manila Quezon City

    1. 1. ROBINSONS LAND CORPORATION Property Developer of Choice
    2. 2. 4 Residential Towers (2) 38-Storeys (2) 36-Storeys 419 Units for Tower B 386 Units for Tower A Flat Design Concept
    3. 3. Make Room for New Memories Game Room Multi-Purpose Room
    4. 4. Make Room for New Memories Jogging Path Lap Pool Zen Garden Sun Deck Barbeque Pit
    5. 5. Make Room for New Memories Children’s Pool Children’s Outdoor Play Area Library Tree House Children’s Indoor Play Area
    6. 6. Make Room for New Memories Badminton Court Fitness Center
    7. 7. List of Amenities • • • • • • • TOWER B Function Room Lap Pool Children’s Pool Jogging Path Barbeque Pit Gazebos Sun Deck Function Area • • • • • • • • TOWER A Multi-purpose Room Gym Locker Room Shower Room Game Room Children’s Playroom Library Zen Garden
    8. 8. List of Amenities FUTURE TOWERS • Badminton Court • Wading Pool with Jacuzzi • Tree House • Fitness Deck • Multi-purpose Room
    9. 9. Unit Mix (Tower B) Unit Type Average Area (sqm.) 1-BR 36.00 to 38.10 2-BR 57.15 to 71.10 Executive 2-BR 72.90 to 90.15 3-BR 108.10 to 114.60 All details appearing herein are subject to change without prior notice.
    10. 10. Floor Assignment Zone 3 PH Floors (38th to 39th Floors) Zone 2 Typical Floors (34th to 37th Floors) Podium Deck and Zone 1 Typical Floors (3rd to 33rd Floors – No 13th Floor) Podium Parking - Basement 1, Upper and Lower Ground and 2nd Floor All details appearing herein are subject to change without prior notice.
    11. 11. Typical Floor Plan – Zone 1 2-BR 1-BR EXECUTIVE 2-BR All details appearing herein are subject to change without prior notice. Furniture and appliances shown herein are for illustrative purposes only and are not part of the deliverables.
    12. 12. One Bedroom Unit 36.00 to 38.10 sqm. All details appearing herein are subject to change without prior notice. Furniture and appliances shown herein are for illustrative purposes only and are not part of the deliverables.
    13. 13. Two Bedroom Unit 57.15 to 71.10 sqm. All details appearing herein are subject to change without prior notice. Furniture and appliances shown herein are for illustrative purposes only and are not part of the deliverables.
    14. 14. Executive Two Bedroom Unit 72.90 to 90.15 sqm. All details appearing herein are subject to change without prior notice. Furniture and appliances shown herein are for illustrative purposes only and are not part of the deliverables.
    15. 15. Typical Floor Plan – Zone 2 EXECUTIVE 2-BR All details appearing herein are subject to change without prior notice. Furniture and appliances shown herein are for illustrative purposes only and are not part of the deliverables.
    16. 16. Typical Floor Plan – Zone 3 PH EXECUTIVE 2-BR 3-BR All details appearing herein are subject to change without prior notice. Furniture and appliances shown herein are for illustrative purposes only and are not part of the deliverables.
    17. 17. Three Bedroom Unit 108.10 & 114.60 sqm. All details appearing herein are subject to change without prior notice. Furniture and appliances shown herein are for illustrative purposes only and are not part of the deliverables.
    18. 18. TOWER B PENTHOUSE UNIT 74.70 Executive 2-BR 82.95 C D Executive 2-BR B C AREA (SQM) A B A UNIT TYPE Executive 2-BR 90.15 D 3-BR 108.10 E 3-BR 114.60 F 4-BR 151.50 F E
    19. 19. Residential Features • Entrance panel door with viewer • Intercom per unit connected to the Security/Reception counter • Automatic smoke detectors and fire alarm with sprinkler system in all units • Utility Room with toilet for selected 2BR and 3BR units • Balconies at selected 2BR and 3BR units All details appearing herein are subject to change without prior notice.
    20. 20. Residential Features • Provisions for: –Individual electric and water meter –Cable TV line –Telephone line –Electrical Power provision for owner-supplied window-type air conditioners –Electrical Load Provision of 50 amperes for Electric Range –Electrical Load Provision of 30 amperes for Refrigerator –Ventilation for kitchen and toilets –Multipoint water heater line (excluding water heater) for Toilet All details appearing herein are subject to change without prior notice.
    21. 21. Building Facilities • • • • • • • • Three (3) elevators (2 passenger elevators and 1 service elevator) Entrance Lobby with reception / security counter CCTV monitoring of selected common areas Automatic smoke detectors and fire alarm with sprinkler system at all common areas Annunciator panel with emergency speaker at all floors Standby power generator for common areas and selected outlets in the residential unit Fire Exits 4 Levels of Parking All details appearing herein are subject to change without prior notice.
    22. 22. Unit Deliverables AREA FLOOR WALL CEILING BEDROOM LIVING/DINING/ KITCHEN TOILET AND BATH Laminated Wood Homogeneous Tiles Ceramic Tiles Plastered Painted Finish Plastered Painted Finish Ceramic Tiles Painted Plain Cement Finish Painted Plain Cement Painted Gypsum Board Finish • Bedroom Closets • Granite Kitchen Countertop OTHER • Utility Room with Toilet for Selected 2BR and 3BR Units DELIVERABLES • Aluminum Framed Glass Windows • Steel railings at Balconies of Selected 2BR and 3BR units All details appearing herein are subject to change without prior notice.
    23. 23. Development Timetable Expected Delivery Expected Delivery Construction Construction Pre-Selling Pre-Selling June June 2014 2014 2011-2014 2011-2014 2009 2009 All details appearing herein are subject to change without prior notice.
    24. 24. Unit Mix (Tower A) Unit Type Average Area (sqm.) 1-BR 36.00 to 47.98 2-BR 58.50 to 59.10 Executive 2-BR 77.25 to 79.20
    25. 25. Floor Assignment PH Floors (36th to 37th Floors) Zone 2 Typical Floors (21st to 35th Floors) Podium Deck and Zone 1 Typical Floors (3rd to 20th Floors – No 13th Floor) Second Floor Residential Units UG Main Lobby and Residential Units LG Amenities and Residential Units Basement 1 Lobby/Commercial Units
    26. 26. Basement ZEN GARDEN MULTIPURPOSE ROOM LOBBY DROP - OFF
    27. 27. Lower Ground Floor 1-BR POCKET GARDEN LIBRARY GYM LOCKER AND SHOWER ROOM CHILDREN’S PLAYROOM AND GAME ROOM
    28. 28. Upper Ground Floor 1-BR MAIN LOBBY
    29. 29. Second Floor 1-BR
    30. 30. Third Floor 1-BR LOBBY
    31. 31. Typical Floor Plan – Zone 1 EXECUTIVE 2-BR 1-BR
    32. 32. Typical Floor Plan – Zone 2 EXECUTIVE 2-BR 1-BR 2-BR
    33. 33. One Bedroom Unit •36.00 to 47.98 sqm.
    34. 34. Two Bedroom Unit •58.50 to 59.10 sqm.
    35. 35. Executive Two Bedroom Unit •77.25 to 79.20 sqm.
    36. 36. Prescribed Combinations – Zone 1 3BR 3BR
    37. 37. Prescribed Combinations – Zone 2 4BR 3BR
    38. 38. Building Facilities • Three (3) elevators (2 passenger elevators and 1 service elevator) • Main Entrance Lobby with reception/security counter at Upper Ground Floor Level • Entrance Lobby with reception at Basement Level • CCTV monitoring of selected common areas • Automatic smoke detectors and fire alarm with sprinkler system at all common areas • Annunciator panel with emergency speaker at all floors • Standby power generator for common areas and selected outlets in the residential unit • Fire Exits • 4 Levels of Parking located in Tower B
    39. 39. Residential Features • Entrance panel door with viewer • Intercom per unit connected to the Security/Reception counter • Provisions for: – Individual electric and water meter – Cable TV line – Telephone line – Electrical Power provision for owner-supplied window-type air conditioners – Electrical Load Provision of 40 amp for Electric Range – Electrical Load Provision of 20 amp for Refrigerator – Ventilation for kitchen and toilets – Provision for multipoint water heater line (excluding water heater) for Toilet – Automatic smoke detectors and fire alarm with sprinkler system in all units – Utility Room with toilet for selected 1BR, 2BR and Executive 2BR units – Balconies at selected 1BR, 2BR and Executive 2BR units
    40. 40. Unit Deliverables AREA FLOOR WALL CEILING BEDROOM LIVING/DINING/ KITCHEN TOILET AND BATH Laminated Wood Homogeneous Tiles Ceramic Tiles Plastered Painted Finish Plastered Painted Finish Ceramic Tiles Painted Plain Cement Finish Painted Plain Cement Painted Gypsum Board Finish • Bedroom Closets • Granite Kitchen Countertop OTHER • Utility Room with Toilet for Selected 1BR, 2BR and Executive 2BR units DELIVERABLES • Aluminum Framed Glass Windows • Steel railings at Balconies of Selected 1BR, 2BR and Executive 2BR units
    41. 41. Development Timetable Expected Delivery Expected Delivery Construction Construction Pre-Selling Pre-Selling September September 2015 2015 2011-2015 2011-2015 2010 2010
    42. 42. Parking and Lobby Location TOWER B MAIN LOBBY Drop Off TOWER A Designated Parking for Tower A Tower B (B, LG, UG, 2/F)
    43. 43. Parking and Lobby Location Drop Off TOWER B TOWER A LOBBY Drop Off Designated Parking for Tower A Tower B (B, LG, UG, 2/F)
    44. 44. Upper Ground Level IN FROM N. DOMINGO DROP - OFF TOWER B TOWER A MAIN LOBBY OUT
    45. 45. Basement Level FROM INTERNAL ROAD TOWER B TOWER A BASEMENT LOBBY IN DROP - OFF IN OUT
    46. 46. Competitive Project Comparison nte mo el o B ation y G St ett RT B L The Pine Crest Mezza Residences J. Ru Gilmore Tower TS iz L R ore ilm G LR ion tat TS n tatio Avida Towers Princeton Residences SM Centerpoint Little Baguio Andrea North
    47. 47. Magnolia Town Square Mall • Construction Timetable – Start: 2nd Quarter of 2010 – Completion: 1st Quarter of 2012 • Other Details: – Address: Along Aurora Blvd corner Hemady St. – 3 retail floors – 2 parking basements All details appearing herein are subject to change without prior notice.
    48. 48. ARCHITECT’S PERSPECTIVE All details appearing herein are subject to change without prior notice.
    49. 49. ARCHITECT’S PERSPECTIVE All details appearing herein are subject to change without prior notice.
    50. 50. ARCHITECT’S PERSPECTIVE All details appearing herein are subject to change without prior notice.

    ×