NEW GENERATION IN PRE-HEATING TECHNOLOGY
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

NEW GENERATION IN PRE-HEATING TECHNOLOGY

  • 531 views
Published

System combines the advantages of 100% scrap preheating and continuous scrap feeding through its chambers, without the need of EAF roof opening. EPC prevents totaly, any dust emission and heat loss …

System combines the advantages of 100% scrap preheating and continuous scrap feeding through its chambers, without the need of EAF roof opening. EPC prevents totaly, any dust emission and heat loss during furnace charging stage, as it is the case normally for other operations. The EPC-EAF is a new generation, economical and environmentaly friendly Electric Arc Furnace. Considerable reduction in electric energy consumption, increased productivity, meeting strict environmental regulations, less dust load within the melt shop, flicker reduction& harmonic disturbance reduction are some of the important features of the new and superior EPC system.

Published in Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
531
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
25
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. KRTec E N V I R O N M E N TA L   P R E H E AT I N G & CONTINUOUS CHARGING SYSTEM (EPC)
  • 2. KR Tec C O M PA N Y   P R E S E N TAT I O N CVS TURKEY CVS EUROPE CVS MIDDLE EAST CVS CIS Italy‐Udine Egypt‐Cario Ukraine‐Donetsk FROM CONCEPT TO COMMISSIONING Design Manufacturing Erection Training Consultancy Innovation Process DevelopmentCVS POLAND CVS IRAN CVS INDIA CVS S.KOREA CVS SINGAPORE CVS USA CVS GREECE Warsaw Tahran Pune Seoul Singapore New York Athens info@cvs.com.tr                          www.cvs.com.tr
  • 3. KR Tec C O M PA N Y   P R E S E N TAT I O N  CVS provides plants & equipment for minimills, also in “turn‐key” solution.  CVS covers the complete design and manufacturing activities for green‐field projects as green field well as revamping/upgrading of existing plants and equipment.  CVS manufactures spare parts & components for Meltshops & Rolling Mills.  CVS provides technical assistance and consulting service to steel production.
  • 4. KR Tec C O M PA N Y   P R E S E N TAT I O N  CVS headquarter is placed in the industrial region of Gebze, just east of Istanbul, close to many major ports  Our modern facilities consists of more than 50,000sqm 50 000sqm of closed area and a land of additional approx. 50,000sqm  CVS workforce is formed by over than 750 specialized workers and engineers with a modern machinery park to undertake even the most challenging projects. g gp j  Over than 270 engineers and administrative employees are involved in the design and management of the projects.
  • 5. KR Tec EPC SYSTEMCVS MAKINA has a cooperation with KR Tec company which has developed a NewGeneration concept in Arc Furnace Steelmaking, ENVIRONMENTAL PREHEATING &CONTINUOUS CHARGING SYSTEM (EPC).Idea behind the challenge is to recover the heat lost to FTP system by the application ofScrap Preheating.The EPC System combines the advantages of thepreheating efficiency of the chamber and thecontinuous scrap feeding feeding.The EPC System is a new generation of economicalarc furnace furnace.EPC system overcomes all the missing items of theexisting Preheating system.
  • 6. KR Tec EPC SYSTEMOne of the issues of the EPC System is to charge the scrap independent of the electric arc furnacetaken into consideration the environmental aspects.The EPC System is installed beside the EAF and the preheated scrap can be charged continuously bythe telescopic feeder system in the melting chamber during Power On.Even during charging of the scrap basket into the EPC System, the system is always airtight and asmall amount of dust can only escape. Furthermore, the design has been considerably simplified toincrease the reliability and the profitability of the investment, reducing the ROI by less than 12months.
  • 7. KR Tec A D VA N TA G E SENERGY SAVINGENERGY SAVINGThe EPC reduces the electric energy consumption by approx. 80‐100 kWh/t compared to the conventional EAF. INDEPENDENT SCRAP CHARGING g g p p p y pCharging of the scrap basket is done with power‐on and independently from the furnace operation. This improves the operation and reduce the Power off time HIGHER PRODUCTIVITYDue to shorter power‐on and power‐off times. The productivity of the furnace can be increased bymin. 20 % compared to the conventional EAF.HIGHER RETURN ON INVESTMENTTheTh EPC S t System f t features llower conversion cost d t th preheating effect. F th i t due to the h ti ff t Furthermore hi h higherproductivity because of less power‐on and power‐off are assured.
  • 8. KR Tec R E S P E C T   T O   N AT U R EMINIMUM DUST EMMISIONDuring charging procedure the system/pre‐heating chamber is always in airtight situation which reflects a minimum of pollution in the meltshop.LOW FTP CAPACITY REQUIREMENTFume Treatment System capacity is reduced thank to the completely closed operation and flat bath condition.LOW DOWNTIMES & MAINTENANCENo critical mechanical parts such as fingers, conveyors, water cooling which cause unforeseen stoppages and maintenance. t d i tADAPTABLE TO CONVENTIONAL METHODOperation can be changed immediately to Conventional method by opening of the off gas ‐ bypass Operation can be changed immediately to Conventional method by opening of the off gas bypassflap.LESS FLICKERLESS FLICKERRelated to the flat bath operation, preheated scrap and the constant energy input, a reduced flicker and less noise generation will be achieved.
  • 9. KR Tec EPC SYSTEM BENEFITS REGARDING ENVIRONMENT  Charging with closed system h h l d  Minimum fume during scrap charging  Cleaner working area  30% less off gas 30% less off gas  30 % less dust at the filter  Less noise  (melting of preheated scrap)  Respect of most environmental standards Respect of most environmental standards
  • 10. KR Tec EPC SYSTEM FEATURES Flat bath operation Controlled scrap quantity input through telescopic feeder system Charging during power on Preheating temperature controlled by PLC Minimized off gas volume related to airtight system
  • 11. KR Tec EPC SYSTEMThe scrap basket will be charged into a drawer of the EPC system which is in waiting position.While this position the front wall of the drawer is closing the preheating chamber and themelting process in the EAF and preheating doesn`t have to be interrupted.After filling of the drawer by the scrap basket a slide gate on top of the EPC System will be closed.Than the drawer will be forwarded by hydraulic cylinders to the preheating chamber and thescrap falls smoothly inside the pre‐heating chamber where it will be preheated.If the drawer is in front position, the back wall of it, is closing to the pre‐heating chamber.A special design of the off gas duct together with a water cooled regulation flap allows to controlthe preheating effect in the pre‐heating chamber.
  • 12. CHARGING HOPPERKR Tec I N   P R E H E AT I N G   P O S I T I O N
  • 13. KR Tec MAIN COMPONENTS CLOSING SLIDE CHARGING B Y PA S S S Y S T E M G AT E OFF GAS FUNNELOFF GASR E G U L AT I O NFLAP CHARGING HOPPER TELESCOPIC SCRAP FEEDER SYSTEM EPC - SYSTEM T R AV E L L I N G FRAME
  • 14. KR Tec MAIN COMPONENTS
  • 15. KR Tec MAIN COMPONENTS
  • 16. KR Tec EPC CHARGING HOPPER IN CHARGING POSITION PREHEATING POSITION
  • 17. KR Tec EPC TELESCOPIC FEEDER IN STA RT P O S I T I O N FRONT POSITION
  • 18. KR Tec PROCESS STEPS OF EPC Refining phase of EAF ‐Preheating of 1st bucket of next heat in pre‐heating chamber ‐Charging of next bucket into charging hopper
  • 19. KR Tec PROCESS STEPS OF EPC Charging of Preheating Chamber ‐Moving of charging hopper into pre‐heating chamber ‐Preheating of 2nd  bucket of next heat in pre‐heating chamber ‐Off gas flap of by pass system closed
  • 20. KR Tec PROCESS STEPS OF EPC Preheating inside EPC ‐Start feeding of preheated scrap after tapping ‐Pre‐heating chamber half empty hopper can move backward to waiting  position
  • 21. KR Tec PROCESS STEPS OF EPC Preheating inside EPC ‐Scrap bucket in waiting position ‐Continuous feeding of scrap during power on ‐Control of preheating scrap temperature with by‐pass regulation flap
  • 22. KR Tec PROCESS STEPS OF EPC Charging of Upper Hopper EPC ‐Start feeding of preheated scrap ‐Opening of sliding gate on top ‐Charging of next bucket into charging hopper
  • 23. KR Tec PROCESS STEPS OF EPC Parking Position of EPC ‐EPC system is moving backward on wheel mechanism underneath only for maintenance purpose
  • 24. O P E R AT I O N A L   C Y C L E          KR Tec DIAGRAM WITH EPC E A F C A PA C I T Y 100 TON T R A N S F O R M E R C A PA C I T Y 1 0 0 M VA700600 LIQUID STEEL500 SCRAP WEIGHT400 IN FIRST CHAMBER300 SCRAP TEMP IN FIRST CHAMBER200 SCRAP WEIGHT IN SECOND100 CHAMBER - 0 5 10 15 20 25 30 37 42 47 52
  • 25. LIQUID STEEL LEVELKR Tec DURING CYCLE WITH EPC 140 EAF 120 C A PA C I T Y 100 TON 100 TRANSFORME R C A PA C I T Y 80 LIQUID STEEL 60 SCRAP WEIGHT IN FIRST CHAMBER 40 SCRAP WEIGHT IN SECOND REPARATI EPARATION 20 APPING CHAMBER 1 HEAT CYCLE PR PRE TA - 0 5 10 15 20 25 30 37 42 47 52
  • 26. C O M PA R I S O N   O FKR Tec PRODUCTIVITY PRODUCTION DIFFERENCE EPC - EAF CONVENTIONAL EAFTra n s f o r m e r M VA 100 100Ta p - w e i g h t t 100 100Net working hours h/y 7.200 7.200Power-on Time min 32 36Power-off time min 6 11Ta p - t o - Ta p - t i m e min 38 47Production/hour t/h 157,89 127,66Production/year t/y 1.136.842 919.149Difference t/y 217.693 20 % PRODUCTIVITY INCREASE WITH EPC SYSTEM (100 TON – 100 MVA FURNACE)
  • 27. C O M PA R I S O N   O FKR Tec O P E R AT I O N E L   C O S T O P E R AT I O N A L C O S T D I F F E R E N C E CONVENTIONAL Unit price EPC- EAF EAF Consumptio Consumptio Unit EUR n EUR/t n EUR/t Electrical energy KWh/t 0,06 300,0 18,0 380,0 22,8 Oxygen Nm³/t 0,20 38,0 7,6 38,0 7,6 Electrodes kg/t 4,00 1,3 5,2 1,6 6,4 Fuel Nm³/t 0,20 3,0 0,6 6,0 1,2 Charged carbon kg/t 0,20 - - 7,0 1,4 Injected carbon kg/t 0,20 15,0 3,0 8,0 1,6 Scrap % 0,30 0,89 337,1 0,89 337,1 Dust removal kg/t 0,20 12,0 2,4 18,0 3,6 Lime kg/t 0,10 38,0 3,8 38,0 3,8 T O TA L 377,7 385,5 Savings EUR/t 7,8 8 €/T SAVING IN OPERATIONAL COST WITH EPC SYSTEM (100 TON – 100 MVA FURNACE)
  • 28. C O M PA R I S O N   O FKR Tec CONVERSION COSTS EPC - EAF CONVENTIONAL EAFAnnual Production t/y 1.136.842 919.149Operational Cost EUR/t 378 385Sales Price EUR/t 420 420 C A L C U L AT I O NAnnual OperationalCost EUR/y -429.360.993 -354.312.293 Annual Fixed Cost EUR/y -30.000.000 -30.000.000 To t a l C o s t f o rProduction EUR/y -459.360.993 -384.312.293Sales Revenue EUR/y 477.473.684 386.042.553Annual Profit EUR/y 1 8 . 11 2 . 6 9 1 1.730.261Saving with EPC EUR/y 16.382.430 AROUND 16 MILLION EUR ANNUAL SAVING  WITH EPC SYSTEM WITH EPC SYSTEM (100 TON – 100 MVA FURNACE)
  • 29. KR Tec C O M PA R I S O N   O F   R I O R O I C O M PA R I S O N 30 25 20 15 ROI FOR Million Euro 10 EPC-EAF EPC - EAF 5 CONV EAF - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 -5 ROI FOR CONV- EAF -10 -15 Time (month)
  • 30. EPC SYSTEMKR Tec POWER FLUCTIONS VOLTAGE, CURRENT AND POWER FLUCTUATIONS; BEFORE AND AFTER SCRAP PREHEATING
  • 31. KR Tec R E F E R E N C E S   ‐ M E LT S H O P S Capacity Year of start‐ Year of startCustomer Country Location Product Production units (tpy) upABINSK ELECTROMET. PLANT Russia Abinsk 1.300.000 Billets Complete Meltshop 2012ENERGOMASSPETSTAL Ukrain Kramatorsk 600.000 Ingot Complete Meltshop 2011TAYBAH STEEL CO. Egypt Al Mansura 450.000 Billets Complete Meltshop 2011ZELJEZARA NIKSIC AD. Montenegro Niksic 500.000 Billets EAF, FTP, WTP, AUX 2010TOSCELIK A.S. Turkey Iskenderun 1.400.000 Billets&Slab Complete Meltshop 2009KHAZAR BILLET CO. Iran Rasht 800.000 Billets EAF, LF, FTP, AUX 2008CONSOLITED JORDANIAN STEEL CO. Jordan Amman 200.000 Billets Complete Meltshop 2007UNITED IRON & STEEL MGF. CO. Jordan Amman 250.000 Billets EAF, LF, CCM, FTP 2007NURSAN METALURJI A.S.NURSAN METALURJI A S Turkey Iskenderun 700.000 700 000 Billets Complete Meltshop Complete Meltshop 2006CER CELIK A.S. Turkey Izmir 500.000 Billets EAF, LF, FTP, AUX 2006
  • 32. KR Tec REFERENCES ‐ EAF Tap Capacity Shell dia. Transformer Year of Customer Country Location (tons) (mm) (MVA) start‐upABINSK ELECTROMET. PLANT Russia Abinsk 130 7.200 130 2012ENERGOMASSPETSTAL Ukrain Kramatorsk 70 5.300 52 2011TAYBAH STEEL CO. Egypt Al Mansura 60 5.300 52 2011ZELJEZARA NIKSIC AD.ZELJEZARA NIKSIC AD Montenegro Niksic 65 5.300 5 300 52 2010DHT METAL  Azerbaıjan Baku 30 3.900 25 2009UNITED IRON & STEEL MFG CO. Jordan Amman 50 5.000 45 2009TOSCELIK A.S. Turkey Iskenderun 155 7.300 130 2009KHAZAR BILLET CO.KHAZAR BILLET CO Iran Rasht 100 6.100 6 100 78 2008NURSAN METALURJI A.S. Turkey Iskenderun 130 7.200 135 2008SOCIETE UNIVERS ACIER (SET 2) Morocco Casablanca 50 4.800 50 2008SOCIETE UNIVERS ACIER (SET 1) Morocco Casablanca 50 4.800 50 2008DETAL LTD.DETAL LTD. Azerbaijan Baku 85 6.000 80 2008YESILYURT DEMIR CELIK A.S. Turkey Samsun 90 6.100 100 2008COJSCO Jordan Amman 35 4.500 45 2007IZMIR DEMIR CELIK A.S. Turkey Izmir 130 6.500 120 2007BAKU POLAT DOKME LTD.BAKU POLAT DOKME LTD. Azerbaijan Baku 25 3.900 20 2007AL HADDAD STEEL CO. Palestine Hibron 12 3.200 5 2007CER CELIK A.S. Turkey Izmir 45 5.000 45 2007NURSAN METALURJI A.S. Turkey Iskenderun 75 5.500 100 2006YESILYURT DEMIR CELIK A.S.YESILYURT DEMIR CELIK A.S. Turkey Samsun 60 5.300 50 2006EKINCILER A.S. Turkey Iskenderun 90 6.100 85 2005KAPTAN DEMIR CELIK A.S. Turkey Istanbul 120 6.300 120 2005JORDAN IRON & STEEL CO. Jordan Amman 13,5 3.100 7 2005
  • 33. KR Tec R E F E R E N C E S   ‐ S E C O N D .   M E T. Capacity Transformer Year of Customer Country Location (tons) (MVA) start up start‐upABINSK ELECTROMET. PLANT Russia Abinsk 130 24 2012WONKANG METAL CO. S.Korea Seoul 16 VD/VOD 2011CEMTAS Turkey Bursa 30 5 2011ORUMIEH STEELORUMIEH STEEL Iran I Orumieh O i h 25 5 2011ENERGOMASSPETSAL Ukrain Kramatorsk 140 24 2011TAYBAH STEEL CO. Egypt Al Mansura 60 10 2011KUMAS MANYEZIT (SET 2) Turkey Kutahya Producing Fused Mgo 2010KARDEMIR A.S. Turkey Karabuk 120 22 2009TOSCELIK A.S. Turkey Iskenderun 155 24 2009KUMAS MANYEZIT (SET 1) Turkey Kutahya Producing Fused Mgo 2008DETAL LTDDETAL LTD. Azerbaijan Baku 85 16 2008KHAZAR BILLET CO. Iran Rasht 100 20 2008YESILYURT DEMIR CELIK A.S. Turkey Samsun 90 16 2007COJSCO Jordan Amman 35 8 2007UNITED IRON & STEEL MGF CO. Jordan Amman 50 12 2007COCSCO Jordan Zarqa 35 8 2007JORDAN IRON & STEEL CO. Jordan Amman 15 5 2006COJSCO Jordan Amman 45 8 2006CER METAL A.S. Turkey Izmir 45 12 2006NURSAN METALURJI A.S. Turkey Iskenderun 100 18 2005KROMAN CELIK A.S. Turkey Kocaeli 100 18 1998
  • 34. KR Tec REFERENCES ‐ CCM Sections Casting Nr. of  Nr of Year of  Year ofCustomer Country Location Product Radius Strands start‐up (mm)ABINSK ELECTROMET. PLANT Russia Abinsk 9 m 6 Square billets 130 ‐ 200 2011ARCELOR MITTAL TEMIRTAU Kazakhstan Temirtau 8 m 6 Square billets 100 ‐ 200 2011TAYBAH STEEL CO. Egypt Al Mansura 6 m 4 Square billets 100 ‐ 160 2011ZELJEZARA NIKSIC AD. Montenegro Niksic 5 m 4 Square billets 100 ‐ 140 2010TOSCELIK A.S. Turkey Iskenderun 9 m 6 Square billets 130 ‐ 200 2009KHAZAR BILLET CO. Iran Rasht 6 m 6 Square billets 100 ‐ 160 2008 Square & round YESILYURT DEMIR CELIK A.S. Turkey Samsun 8 m 6 100 ‐ 200 2007 billetsCOJSCO Jordan d Amman 6 m 3 Square billets b ll 100 ‐ 160 2006CER METAL A.S. Turkey Izmir 5 m 4 Square billets 140 2006CER METAL A.S.CER METAL A S Turkey Izmir 5 m 5m 3 Square billets Square billets 200 2006NURSAN METALURJI A.S. Turkey Iskenderun 5 m 6 Square billets 100 ‐ 150 2005
  • 35. KR Tec REFERENCES ‐ FTP Plant Capacity Year of Customer Country Location Technology (m3/h) start‐upABINSK ELECTROMET. PLANT Russia Abinsk 2.300.000 Pulse‐jet FF 2012JSC DNEPROSPETSSTAL Ukraine Zaporozhye 1.200.000 Pulse‐jet FF 2011ENERGOMASSPETSTAL Ukraine Kramatorsk 1.200.000 1 200 000 Pulse‐jet FF Pulse jet FF 2011TAYBAH STEEL CO. Egypt Al Mansura 600.000 Pulse‐jet FF 2011ZELJEZARA NIKSIC AD. Montenegro Niksic 1.200.000 Pulse‐jet FF 2010DHT METAL  Azerbaijan j Baku 650.000 Pulse‐jet FF j 2009BILECIK DEMIR CELIK Turkey Bilecik 500.000 Pulse‐jet FF 2009TOSCELIK A.S. Turkey Iskenderun 2.300.000 Pulse‐jet FF 2009KARDEMIR A.S. Turkey Karabük 220.000 Pulse‐jet FF 2009SOCIETE UNIVERS ACIER Morocco Casablanca 2.350.000 Pulse‐jet FF 2009ALEZZ STEEL AL DEKHILIA (Set 2) Egypt Alexandria 1.400.000 Reverse‐air FF 2009ALEZZ STEEL AL DEKHILIA (Set 1) Egypt Alexandria 1.400.000 Reverse‐air FF 2009COJSCO Jordan Amman 600.000 Pulse‐jet FF 2006YESILYURT DEMIR CELIK A.S. Turkey Samsun 2.000.000 Pulse‐jet FF 2006CER CELIK ENDUSTRISI A.S. Turkey Izmir 1.200.000 Pulse‐jet FF 2006NURSAN METALURJI A.S. Turkey Iskenderun 1.000.000 Pulse‐jet FF 2005CER METAL A.S. Turkey Izmir 1.500.000 Pulse‐jet FF 2005
  • 36. KR Tec REFERENCES ‐ MHSCustomer Country Location ProductsABINSK ELECTROMET. PLANT Russia Abinsk MHS for EAF,Scrap bucket, LFCMC SISAK Crotia Sisak MHS for EAF,Scrap bucket, LFKARDEMIR A.S. Turkey Karabuk MHS for LFTOSCELIK A.S. Turkey Iskenderun MHS for EAF,Scrap bucket, LFTAYBAH STEEL CO. Egypt Al Mansura MHS for EAF, LFCOJSCO Jordan Amman MHS for EAF,Scrap bucket, LFKROMAN  Turkey Kocaeli MHS for LF
  • 37. KR Tec REFERENCES ‐ OFF GASCustomerC Country C Location i Products dISDEMIR Turkey Iskenderun Skirt & Moveable Hood & Fixed HoodTHYSSEN‐KRUPP AST Italy Terni WC hood for AODARCELOR MITTAL ANNABA Algeria g Annaba SMS 1 ‐ Moveable Hood & Fixed HoodARCELOR MITTAL ANNABA Algeria Annaba SMS 2‐ Skirt & Movable Hood & Fixed HoodSALZGITTER FLACHSTAHL Germany Dusseldorf Off Gas Stack Cover
  • 38. KR Tec R E F E R E N C E S   ‐ S PA R E   PA R T SCustomer Country Customer Country Customer CountryACCIAIERIE VALBRUNA Italy EKINCILER DEMIR CELIK Turkey MITTAL SKOPJE MITTAL SKOPJE MacedoniaAL RAJHI Saudi Arabia ELECTROSTAL Ukraine MOBARAKEH STEEL IranAL TUWAIRQI Saudi Arabia ELWOOD STEEL Belgium NATIONAL STEEL Saudi ArabiaALL EZZ GROUP Egypt ENGINEERING STEEL  Belgium NOVOROS METALL LTD. RussiaALSTOM POWER Italy BELGIUM NURSAN METALURJI AS NURSAN METALURJI AS TurkeyAMK ALCHEVSK Ukraine ERVIN AMASTEEL Belgium QATAR STEEL QatarARCELOR MITTAL RUHRORT Germany ETEAM Italy REVYAKINO RussiaARCELOR MITTAL TEMIRTAU Kazakhstan FERRIERE NORD ItalyARCELORMITTAL  SALZGITTER FLACHSTAHL Germany France FOLDER DenmarkDUNKERQUE SHARQ SOHAR Oman GERLAFINGEN SwitzerlandARCELORMITTAL HAMBURG Germany SIDENOR SA Greece GORKY STEEL RussiaARCELORMITTAL SKOPJE Macedonia SIDERURGICA BALBOA Spain G‐STEEL ThailandARCOSTEEL Egypt SIVAS DEMIR CELIK Turkey HALYVOURGIA THESSALIAS SA HALYVOURGIA THESSALIAS SA GreeceBAKU STEEL Azerbaijan SOHAR STEEL Oman HALYVOURGIKI GreeceBENTELER Germany SONASID Morocco INDUSTRIAS NACIONALES Dominican Rep. Bosnia SOVEL GreeceBH STEEL IZMIR DEMIR CELIK Turkey Herzegovina SUEZ STEEL gyp EgyptCARINOX Belgium JORDAN IRON & STEEL CO. JORDAN IRON & STEEL CO Jordan J d SWISS STEEL SuisseCEMTAS Turkey KAPTAN DEMIR CELIK Turkey THAME STEEL United KingdomCER METAL AS Turkey KARABUK DEMIR CELIK Turkey TIMKEN USACHARTER STEEL USA KOMOTEK Bulgaria TOSYALI HOLDING TOSYALI HOLDING TurkeyCMC SISAK Croatia KREMIKOVSKI Bulgaria UNITED IRON & STEEL MGF. CO. JordanCOJSCO Jordan KURUM STEEL Albania YESILYURT TurkeyCORUS Holland MAKEEVKA STEEL WORKS Ukraine ZELJEZARA NIKSIC AD MontenegroDUFERCO Belgium MED STEEL  Syria
  • 39. Yo u r   O n e ‐ S t o p Solution Provider forMeltshops & Rolling Mills Ecological Solutions for Electric Steel Making KR Tec