Allan H Rasmussen
TORM’s share price development over the past three years…
2
Copyright © 2013 Dagbladet Børsen A/S
The restructuring agreement with banks and T/C-in partners concludes
TORM’s comprehensive finance solution
3
Deferral of debts
Extension of maturities until 31 December
2016
New capital
USD 100m in working capital over two
years
Newbuilding program
Elimination of newbuilding program
completed
Internal cost and cash initiatives
Implementation of cost and cash initiatives with a cumulative effect of at least USD100m
over three years
Realigning time charter portfolio
T/C-rates adjusted to market level
or contracts terminated
Compre-
hensive
finance
solution
for TORM
 
 

“Karo ya Maro”
4Mahatma Gandhi
5
FBB
VSAT
Diagram of the future technology onboard
6
Bandwidth and Coverage Summary - today
7
And tomorrow…
8
Background
• TORM was first mover implementing Internet on board vessels
• Lack of demand and competition on the market
• Limited technical solutions available (high cost due to low demand)
• Main purpose: Seafarer welfare
• Initiative sponsored by TORM foundation
• Buying and owning the equipment
• Large size antennas
• No strategy as such was stipulated
• A long term binding contract with penalty was entered
• No SLA (Service Level Agreement)
9
10
Project outline
Potential suppliers & evaluation criterion
11
A B C D
Future proof
technology
NO YES NO NO
Datapackage 500 MB Unlimited 500 MB 500 MB
Service level 98 % 99,5 % 98 % 98 %
Total cost Second best Leading Not competitive Not competitive
References 1. Tanker Pacific 1. Nordic Tankers
2. Mærsk
1.American Seafood
Company
2. Wilhelmsen
1. BP Shipping
2. BW Maritime
3. Farstad
Comparison of key figures
12
A B
Guaranteed uptime 98% 99,5%
Monthly fee C-band rebuild & FBB USD X USD Y
Monthly fee Ku-band & FBB USD XX USD YY
Monthly data package 500 MB per month Unlimited
Installation costs USD XXX USD YYY
Contract exit cost 0 USD ZZZ
Cost Comparison
13
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
Apr/12
Jun/12
Aug/12
Oct/12
Dec/12
Feb/13
Apr/13
Jun/13
Aug/13
Oct/13
Dec/13
Feb/14
Apr/14
Jun/14
Aug/14
Oct/14
Dec/14
Feb/15
Apr/15
Jun/15
Aug/15
Oct/15
Dec/15
Feb/16
Apr/16
USD
Vessel Communication – Business Case
SingTel current
SingTel new
Inmarsat
Present & Future Solution
14
Present Future
Strategy Supplier driven, based on
supply
TORM driven, based on
demand
Technology VSAT: C-Band V-SAT: KU-band
Redundancy 15 vessels with FBB All vessels with FBB
Bandwidth 256 kbps shared by up to 10
vsls
128 kbps dedicated per vsl
E&E FB -77, SAT-B, SAT-C SAT-C (cost saving)
Installation In dry docking (DD) only Estimate: 1 day no DD
SLA N/A – TORM is responsible Supplier is responsible
Guaranteed
uptime
N/A 99,5%
Investment cost All equipment purchased and
owned – USD 150.000 pr vsl
3 year leasing contract
Installation + monthly fee
Requirement specification
Req Nr. Requirement
Priori
ty
Supplier name: (To be filled in)
Co
de
Comments
1.0 Technical Requirements
1.1 Primary modeof communication:VSAT - Ku Band w/Auto Beam switching (Completesystem
including AboveDeck & below Deck units)
ER 1 XpressLink is a managed service for a full redundant network in which the monthly
service fee covers not only the hardware, but also all the data airtime. The service
provides not only Ku band auto beam switching but also fail over functionality to the
FleetBroadband standard IP service. The airtime for this is included in the service.
1.2 Ku band antenna upgradeableto Ka band ER 1 XpressLink includes a free upgrade path to the Global Xpress service (KA Band) when
available in 2014. XpressLink provides a future proof communication set up.
1.3 Backup modeof communication:FBB 250 - Completesystem including AboveDeck & below
Deck units
ER 1 Weoffer Thrane & Thrane Sailor 500. Hardware is included in the service.
1.4 FBB 250 - Cordless phones with 3 handsets and G3 Fax machine CR 1 Weoffer FBB 500 from Trane & Trane
1.5 VOIP adaptors for usewith standard analoguephones (including cordless) CR 1 Included are 4 voice lines with handsets
1.6 Freevoice calls to Torm Global offices from ship and vice-versa CR 2 This part have to go in to project with our R&D
1.7 Corporatecommunicationavailability (Voice& email) 24x7x365 CR 1 Can Torm explain this better?
1.8 Bandwidth:min 512 / 512KBPS CR 1 Each vessel will be between 128kbps and 512kbps
1.9 ContentionRatio: max 1:6 CR 1Each vessel will be between 128kbpsand 512kbps
1.10 Committed IP Rate: Min 24 KBPS CR 1CIR: 128kbps
1.11 VoiceQuality per channel: Min 12 KBPS CR 1
1.12 Number of PCs connected to communicationsystem:Min 8 CR 1Wedo deliver two networks for thevessel and crew
1.13 Number of Telephones connected to communicationsystem: Min 2 (Corporate& Crew) CR
14 voicelines open and crew lines
1.14 Minimum expected data download per ship per week: 600MB CR
1
Unlimited usageof data see in our quotationParagraph 3.7 Fair usepolicy content
filtering
1.15 Expected Monthly data download per ship: 8 GB ER
1
Unlimited usageof data see in our quotationParagraph 3.7 Fair usepolicy content
filtering
1.16 All equipment mustbeMarineapproved CR 1TheFBB and VSAT antenna is approved
1.17 Multi Device connection box for automatic changeover from VSAT to FBB to G3 (to Satcom
C), based on least cost routing & availability
CR
2
Fail over functionality to FleetBroadbandstandard IP servicebased on availability of the
KU band service. FleetBroadband standard IP services included.
1.18 Advanced spam and virus filters onboard & ashore - ESET Nod32 (alt: SOPHOS) CR
2
AmosConnect onboard Antivirus is based on thePortIT Antivirus servicewhich is ESET
NOD32. Thelicense fee is US$ 30 per vessels per month and covers all thePCs.
At theAmosConnect Email servicehub sideall incoming and outgoing messages are
scanned for viruses. Next to this thereis a spam filter in place.
1.19 Firewalls onboard & ashore(firewall onboard must bepart of the'Multi Device Connection
Box' manageable by TORM)
CR
2
There are various solutionspossibleto meet theexact requirements of Torm. Further
discussionsshould providea better understanding of therequirements and how tomeet
them in thebest cost effectiveway.
1.20 Bandwidth Management Onboard incl IP traffic measurement/logging CR
1You can check bandwidth and uptimeat MySEVSAT.com
1.21 Traffic Management (Priority settings) Onboard CR 1Thevessel network has priority options
1.22 Content Filtering Onboard CR
1
There are various solutionspossibleto meet theexact requirements of Torm. Further
discussionsshould providea better understanding of therequirements and how tomeet
them in thebest cost effectiveway.
1.23 Data download accelerator / manager Onboard CR 1Included in theiDirect platform
1.24 Equipment complies with latest performancestandards, specified by ITU, at thetimeof
each installation
CR
1
1.25 Interference filters : example bandpass filters for radars, other comm. & Nav equipment CR
1Needs approval from our project department
1.26 HardwareReliability specification (MTBF) for key componentslikeBUC, ACU, Modems, etc CR
1
XpressLink is a full redundant networkbased on VSAT and FleetBroadband. Any failover
for data in any direction is included in theservice fee.
1.27 Remotesupport(Maintenanceaccess via L-band FBB) CR 1
1.28 Pre-install survey, support, drawings, document CR 1
2 Internet access - guaranteed & verified for al least following sites
2.1 UKHO, Maris or similar electronic chart / publication data provider for updates & permits CR
1
2.2 DNV Navigator CR 1
2.3 eNOAD CR
1
TheAmosConnect Email servicelicense includes as well a US Coastguard Enoad
application.
2.4 Port Information CR 1
2.5 Weather data CR 1
2.6 Torm India & Torm CPH server access CR 1
3 Communication Requirement - Crew
3.1 Voicecall using chat cards CR 1
3.2 Web Mail - Gmail, Yahoo, Facebook CR 1
3.3 Chat - Low bandwidth sites CR 1
3.4 SMS - Ship to shoremobilephones& viceversa CR 1
3.5 Low bandwidthinternet browsing for news, sports, banking etc. CR 1
4 Communication Requirement - Corporate
4.1 Email with attachment - Send & receive emails with attachments CR 1
4.2 Email client + communicator softwaremust bepart of package CR 1TheEmail service offered is AmosConnect
4.3 Data box with push-technologyfor large sizefiles (part of themulti devicebox) CR
2
There are various solutionspossibleto meet theexact requirements of Torm. Further
discussionsshould providea better understanding of therequirements and how tomeet
them in thebest cost effectiveway.
4.4 Voicecall - Quality minimum 12 KBPS per voicechannel CR 1
4.5 Fax - send & receive via 3G telephony CR 1Group 3 fax is fully supported.
4.6 Databaseexchange, PMS, Purchase, crewing, vetting, etc CR 1
4.7 Remoteaccess to shipboard computers & systems;filetransfer CR 1
4.8 Vessels E-mail addresses to be'Alias of TORM Domain' for eg. TormVsl.Com or
Tormship.com
ER
1On theEmail service AmosConnect this is supported.
5 Service Level Agreement (SLA)
5.1 Provision of adequatestock holding to ensureorders can bemet in timely order. Supplier
must hold stockof completeaboveand below deck HW.
ER 1
5.2 Provision of adequatespares mustbeheld to mesureimmediateavailability for field service
attendanceat key geographic locations: Singapore, Fuijarah, Rotterdam, Gibraltar, New
York, Amsterdam, Gibraltar, Houston, Antwerp.
R 2 Rotterdam, Alesund, Reykjavik, Singapore, Houston, Dubai. Other harbors will be added
to this service map later this year, including Hong Kong.
5.3 Preinstallation report written and delivered 5 days from sitesurvey form being submitted. ER
1
5.4 Equipment availablefully tested and configured for customer specific requirement as
detailed in thepreinstallaion form and ready to ship 15 days prior to delivery.
ER
1
5.5 Issuing of telephonenumbers/IP addressesesand tracking details of equipment toTORM
within 48 hoursof dispatch
ER
1
5.6 Minimum commitentof 3 vessel installationsper monthon agreed location. ER
1
5.7 Calls answered by support desk within40 seconds R 1
5.8 In event of fault not being rectified by Support Desk, subsequentresponseby NOC or
systemsengineer to provideremotetechnical support tothevessel within 1 hour.
ER
1
5.9 Calls reamianing open progress chased within 48 hours. R 1
5.10 All calls closed within 7 days. ER 2
5.11 In event TORM decides that remotesupport cannotfix problem and that a replacement part
can be sent withoutengineer (eg. Moden or voice handset whereequipment can easily be
replaced without engineer being needed) thedispatch mustbemadethenext working day.
ER
1
5.12 Mobilisation of nearest serviceengineer or In-Country Agent as applicablewithin 36 hours. R
1
5.13 Acknowledgementof complaint within 24hours from timeof receipt. ER
1
5.14 Formal responseto complaintwith recommendations for resolutionwithin48 days. R
1
5.15 Completeclosureof complaint within 7 days. ER 1
5.16 Network availablity 99% basedon FBB and VSAT combined solutionexcept Polar regents. ER
1
6 Payment/Invoicing
6.1 Payment terms:45 days net from receipt of correct invoicefrom theSupplier CR 1
6.2 TheSupplier is responsiblefor ensuring pricetransparency at all times and document that
all prices are net and according to agreement.
ER 1
6.3 Copies of invoices and credit notes can bedownloaded on theinternet withno additional
costs for theCustomer.
R 1
6.4 Onemonthly invoiceper month per vessel in PDF (electronic format)
ER 21 Invoicefor Vsat / Xpresslink setup, 1 invoicevarious services, 1 for Fleetbroadband
7 Implementation
7.1 TheSupplier is in coordination with TORM responsiblefor preparing an implementation
plan ensuring that theimplementation of equipmenton board runssmoothly.
ER 1
15
Req Nr. Requirement
Priority
Supplier name: (To be filled in)
Code
Comments
1.0 Technical Requirements
1.1 Primary mode of communication: VSAT - Ku Band
w/Auto Beam switching (Complete system including
Above Deck & below Deck units)
ER 1 XpressLink is a managed service for a full redundant
network in which the monthly service fee covers not
only the hardware, but also all the data airtime. The
service provides not only Ku band auto beam
switching but also fail over functionality to the
FleetBroadband standard IP service. The airtime for
this is included in the service.
1.2 Ku band antenna upgradeable to Ka band ER 1 XpressLink includes a free upgrade path to the
Global Xpress service (KA Band) when available in
2014. XpressLink provides a future proof
communication set up.
1.3 Backup mode of communication: FBB 250 - Complete
system including Above Deck & below Deck units
ER 1 We offer Thrane & Thrane Sailor 500. Hardware is
included in the service.
1.4 FBB 250 - Cordless phones with 3 handsets and G3 Fax
machine
CR 1 We offer FBB 500 from Trane & Trane
1.5 VOIP adaptors for use with standard analogue phones
(including cordless)
CR 1 Included are 4 voice lines with handsets
1.6 Free voice calls to Torm Global offices from ship and
vice-versa
CR 2 This part have to go in to project with our R&D
Requirement specification
Area. 1 Description: Question
Supplier name: (to be filled)
Supplier reply in short:
Q.1.1 Customer service Please outline the full process for an in-service
VSAT Ku-band installation on board a TORM
tanker, including how this interfaces with the
LAN network. Please include any drawings
where appropriate.
Installation will take about 1 day, depending on the
preperations from the vessel side. Most commonly is that the
vessel will run the cabels, place the foundation and antenna
on place. The ShipEquip technician will terminate the cabels
and commissioning the system. The SE router and will be
connected to the LAN network onboard.
Q.1.2 Customer service Please provide details of your after sales and
support network, including proposed KPIs for
monitoring the contract performance.
The preformance such as uptime and usage reports can be
measured realtime on MySEVSAT.com Please also see the SLA
doc.
Q.1.3 Customer service The following tasks should be considered in
respect of the installations:
- fabrication of the pedestal /mast for the
antenna
- installation of the pedestal/mast in place
(possibly strengthening of the deck below)
- mounting radom
- cabling
- commissioning
- configuration with TORM IT systems
Supplier should list Supplier and TORM
responsibilities for each point above.
Methodology for carrying out specific tasks
should also be included in your response.
The following tasks should be considered in respect of the
installations:
- fabrication of the pedestal /mast for the antenna Not
Inmarsat scope of work, we will recommend pedestal height
and location.
- installation of the pedestal/mast in place (possibly
strengthening of the deck below) Not Inmarsat scope of work,
we can give some advises based on previous installations on
similar vessels.
- mounting radome Normally performed by vessel crew, a
crane normally required
- cabling Cables according to attached pdf 4009-SG5U-881to
be pre-installed by vessel crew to save time during
commissioning. Inmarsat technician will terminate all cable
ends and connect to Vsat equipment.
- commissioning To be performed by Inmarsat technician,
normally 1-2 days required if pre-installation work checklist is
completed before attendance of technician. Crew training will
be performed.
- configuration with TORM IT systems Inmarsat
support/operation/R&D will assist with setup.
16
Roles and responsibilities during implementation
- And what about insurance?
17
Other areas to consider for similar setup…
Cooperation between TORM and DTU Mechanical Engineering
• Ph.d. Researcher Jakob Axel Bejbro Andersen
• Two students doing their master project in TORM Technical Division
– Lars Jørgensen & Christian Johannesen
• Focusing on PSS, identifying and listing areas of interest
• Full analysis and tender process -> implementation for at least one area
Examples of possible PSS areas identified:
• Hull and propeller cleaning
• Navigational equipment
• Life saving appliances
• Propulsion and power production - reliability and TCO
• Measurement equipment
• Energy optimization devices
18
From Wikipedia, the free encyclopedia:
A partnership is an
arrangement where
parties agree to
cooperate to advance
their mutual interests
19
20
21

More Related Content

Viewers also liked

Proactive service solutions in the commercial vehicle industry - Les Bishop, ...
Proactive service solutions in the commercial vehicle industry - Les Bishop, ...Proactive service solutions in the commercial vehicle industry - Les Bishop, ...
Proactive service solutions in the commercial vehicle industry - Les Bishop, ...Tim McAloone
 
Innovating within the value chain: Supplying components to an existing PSS - ...
Innovating within the value chain: Supplying components to an existing PSS - ...Innovating within the value chain: Supplying components to an existing PSS - ...
Innovating within the value chain: Supplying components to an existing PSS - ...Tim McAloone
 
From can-kickers to total solution provider - Ole Würtz, Senior Training Cons...
From can-kickers to total solution provider - Ole Würtz, Senior Training Cons...From can-kickers to total solution provider - Ole Würtz, Senior Training Cons...
From can-kickers to total solution provider - Ole Würtz, Senior Training Cons...Tim McAloone
 
World-Class Servitisation: Methods, Cases and Partnerships
World-Class Servitisation: Methods, Cases and PartnershipsWorld-Class Servitisation: Methods, Cases and Partnerships
World-Class Servitisation: Methods, Cases and PartnershipsTim McAloone
 
09 partnerships - thow2
09   partnerships - thow209   partnerships - thow2
09 partnerships - thow2Tim McAloone
 
08 organisation - napi
08   organisation - napi08   organisation - napi
08 organisation - napiTim McAloone
 
PSS Networks and Partnerships
PSS Networks and PartnershipsPSS Networks and Partnerships
PSS Networks and PartnershipsTim McAloone
 
12 business models - jaban
12   business models - jaban12   business models - jaban
12 business models - jabanTim McAloone
 
14 so what now - tmca
14   so what now - tmca14   so what now - tmca
14 so what now - tmcaTim McAloone
 
Domestic animal ipad apps
Domestic animal ipad appsDomestic animal ipad apps
Domestic animal ipad appsNeharica Walter
 
10 wilhelmsen - ec
10   wilhelmsen - ec10   wilhelmsen - ec
10 wilhelmsen - ecTim McAloone
 
Gauging your Readiness for PSS
Gauging your Readiness for PSSGauging your Readiness for PSS
Gauging your Readiness for PSSTim McAloone
 

Viewers also liked (15)

Proactive service solutions in the commercial vehicle industry - Les Bishop, ...
Proactive service solutions in the commercial vehicle industry - Les Bishop, ...Proactive service solutions in the commercial vehicle industry - Les Bishop, ...
Proactive service solutions in the commercial vehicle industry - Les Bishop, ...
 
Innovating within the value chain: Supplying components to an existing PSS - ...
Innovating within the value chain: Supplying components to an existing PSS - ...Innovating within the value chain: Supplying components to an existing PSS - ...
Innovating within the value chain: Supplying components to an existing PSS - ...
 
From can-kickers to total solution provider - Ole Würtz, Senior Training Cons...
From can-kickers to total solution provider - Ole Würtz, Senior Training Cons...From can-kickers to total solution provider - Ole Würtz, Senior Training Cons...
From can-kickers to total solution provider - Ole Würtz, Senior Training Cons...
 
World-Class Servitisation: Methods, Cases and Partnerships
World-Class Servitisation: Methods, Cases and PartnershipsWorld-Class Servitisation: Methods, Cases and Partnerships
World-Class Servitisation: Methods, Cases and Partnerships
 
09 partnerships - thow2
09   partnerships - thow209   partnerships - thow2
09 partnerships - thow2
 
Silk Fabric
Silk FabricSilk Fabric
Silk Fabric
 
Mobile Agent (AI)
Mobile Agent (AI)Mobile Agent (AI)
Mobile Agent (AI)
 
08 organisation - napi
08   organisation - napi08   organisation - napi
08 organisation - napi
 
PSS Networks and Partnerships
PSS Networks and PartnershipsPSS Networks and Partnerships
PSS Networks and Partnerships
 
12 business models - jaban
12   business models - jaban12   business models - jaban
12 business models - jaban
 
14 so what now - tmca
14   so what now - tmca14   so what now - tmca
14 so what now - tmca
 
Domestic animal ipad apps
Domestic animal ipad appsDomestic animal ipad apps
Domestic animal ipad apps
 
10 wilhelmsen - ec
10   wilhelmsen - ec10   wilhelmsen - ec
10 wilhelmsen - ec
 
AWPA presentation on Workforce Development at the 7th Annual Australasian Tal...
AWPA presentation on Workforce Development at the 7th Annual Australasian Tal...AWPA presentation on Workforce Development at the 7th Annual Australasian Tal...
AWPA presentation on Workforce Development at the 7th Annual Australasian Tal...
 
Gauging your Readiness for PSS
Gauging your Readiness for PSSGauging your Readiness for PSS
Gauging your Readiness for PSS
 

Similar to The voice of the customer: TORM's experiences and needs within PSS - Allan H. Rasmussen, VP Fleet & Newbuilding Support for TORM A/S

Get More Out Of Your Broadband Connection - Digital Ship Singapore September ...
Get More Out Of Your Broadband Connection - Digital Ship Singapore September ...Get More Out Of Your Broadband Connection - Digital Ship Singapore September ...
Get More Out Of Your Broadband Connection - Digital Ship Singapore September ...michielmeijer58
 
Fyp Presentation
Fyp PresentationFyp Presentation
Fyp PresentationArsalan Mir
 
Latency Considerations in LTE: Implications to Security Gateway
Latency Considerations in LTE:  Implications to Security GatewayLatency Considerations in LTE:  Implications to Security Gateway
Latency Considerations in LTE: Implications to Security GatewayTerry Young
 
Factors affecting 2g data speed
Factors affecting 2g data speedFactors affecting 2g data speed
Factors affecting 2g data speedAlfred Ongere
 
MANET, Unicast Routing Protocol, Multicast Routing Protocol.
MANET, Unicast Routing Protocol, Multicast Routing Protocol.MANET, Unicast Routing Protocol, Multicast Routing Protocol.
MANET, Unicast Routing Protocol, Multicast Routing Protocol.Editor IJMTER
 
AIRCOM LTE Webinar 5 - LTE Capacity
AIRCOM LTE Webinar 5 - LTE CapacityAIRCOM LTE Webinar 5 - LTE Capacity
AIRCOM LTE Webinar 5 - LTE CapacityAIRCOM International
 
Assessing Network Readiness
Assessing Network ReadinessAssessing Network Readiness
Assessing Network ReadinessrAVe [PUBS]
 
ASSIGNMENT MOBILE COMMUNICATION.pptx
ASSIGNMENT MOBILE COMMUNICATION.pptxASSIGNMENT MOBILE COMMUNICATION.pptx
ASSIGNMENT MOBILE COMMUNICATION.pptxFiredBoy
 
2002023
20020232002023
2002023pglehn
 
TSN Timing QoS Mechanisms: What Did We Learn over the Past 10 Years?
TSN Timing QoS Mechanisms: What Did We Learn over the Past 10 Years?TSN Timing QoS Mechanisms: What Did We Learn over the Past 10 Years?
TSN Timing QoS Mechanisms: What Did We Learn over the Past 10 Years?RealTime-at-Work (RTaW)
 
Ccna day5-140715152501-phpapp01
Ccna day5-140715152501-phpapp01Ccna day5-140715152501-phpapp01
Ccna day5-140715152501-phpapp01Sachin Morya
 

Similar to The voice of the customer: TORM's experiences and needs within PSS - Allan H. Rasmussen, VP Fleet & Newbuilding Support for TORM A/S (20)

Get More Out Of Your Broadband Connection - Digital Ship Singapore September ...
Get More Out Of Your Broadband Connection - Digital Ship Singapore September ...Get More Out Of Your Broadband Connection - Digital Ship Singapore September ...
Get More Out Of Your Broadband Connection - Digital Ship Singapore September ...
 
Fyp Presentation
Fyp PresentationFyp Presentation
Fyp Presentation
 
Umts services
Umts servicesUmts services
Umts services
 
Latency Considerations in LTE: Implications to Security Gateway
Latency Considerations in LTE:  Implications to Security GatewayLatency Considerations in LTE:  Implications to Security Gateway
Latency Considerations in LTE: Implications to Security Gateway
 
Latency considerations in_lte
Latency considerations in_lteLatency considerations in_lte
Latency considerations in_lte
 
C C N A Day5
C C N A  Day5C C N A  Day5
C C N A Day5
 
Factors affecting 2g data speed
Factors affecting 2g data speedFactors affecting 2g data speed
Factors affecting 2g data speed
 
MANET, Unicast Routing Protocol, Multicast Routing Protocol.
MANET, Unicast Routing Protocol, Multicast Routing Protocol.MANET, Unicast Routing Protocol, Multicast Routing Protocol.
MANET, Unicast Routing Protocol, Multicast Routing Protocol.
 
AIRCOM LTE Webinar 5 - LTE Capacity
AIRCOM LTE Webinar 5 - LTE CapacityAIRCOM LTE Webinar 5 - LTE Capacity
AIRCOM LTE Webinar 5 - LTE Capacity
 
Oil & Gas - Solution Overview
Oil & Gas - Solution OverviewOil & Gas - Solution Overview
Oil & Gas - Solution Overview
 
Assessing Network Readiness
Assessing Network ReadinessAssessing Network Readiness
Assessing Network Readiness
 
ASSIGNMENT MOBILE COMMUNICATION.pptx
ASSIGNMENT MOBILE COMMUNICATION.pptxASSIGNMENT MOBILE COMMUNICATION.pptx
ASSIGNMENT MOBILE COMMUNICATION.pptx
 
1 owa010010 wcdma ran overview issue 1.15
1 owa010010 wcdma ran overview issue 1.151 owa010010 wcdma ran overview issue 1.15
1 owa010010 wcdma ran overview issue 1.15
 
DSRC
DSRCDSRC
DSRC
 
2002023
20020232002023
2002023
 
TSN Timing QoS Mechanisms: What Did We Learn over the Past 10 Years?
TSN Timing QoS Mechanisms: What Did We Learn over the Past 10 Years?TSN Timing QoS Mechanisms: What Did We Learn over the Past 10 Years?
TSN Timing QoS Mechanisms: What Did We Learn over the Past 10 Years?
 
Ccna day5
Ccna day5Ccna day5
Ccna day5
 
Ccna day5
Ccna day5Ccna day5
Ccna day5
 
Ccna day5-140715152501-phpapp01
Ccna day5-140715152501-phpapp01Ccna day5-140715152501-phpapp01
Ccna day5-140715152501-phpapp01
 
Ccna day5
Ccna day5Ccna day5
Ccna day5
 

More from Tim McAloone

11 alfa laval-aalborg_proteus_1
11   alfa laval-aalborg_proteus_111   alfa laval-aalborg_proteus_1
11 alfa laval-aalborg_proteus_1Tim McAloone
 
08 organisation - napi
08   organisation - napi08   organisation - napi
08 organisation - napiTim McAloone
 
06 readiness for pss - hsuan
06   readiness for pss - hsuan06   readiness for pss - hsuan
06 readiness for pss - hsuanTim McAloone
 
04 pss concept development
04   pss concept development04   pss concept development
04 pss concept developmentTim McAloone
 
04 pss concept development
04   pss concept development04   pss concept development
04 pss concept developmentTim McAloone
 
DTU’s maritime centre
DTU’s maritime centreDTU’s maritime centre
DTU’s maritime centreTim McAloone
 

More from Tim McAloone (7)

11 alfa laval-aalborg_proteus_1
11   alfa laval-aalborg_proteus_111   alfa laval-aalborg_proteus_1
11 alfa laval-aalborg_proteus_1
 
08 organisation - napi
08   organisation - napi08   organisation - napi
08 organisation - napi
 
06 readiness for pss - hsuan
06   readiness for pss - hsuan06   readiness for pss - hsuan
06 readiness for pss - hsuan
 
04 pss concept development
04   pss concept development04   pss concept development
04 pss concept development
 
04 pss concept development
04   pss concept development04   pss concept development
04 pss concept development
 
Bill totalcare
Bill totalcareBill totalcare
Bill totalcare
 
DTU’s maritime centre
DTU’s maritime centreDTU’s maritime centre
DTU’s maritime centre
 

Recently uploaded

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 

Recently uploaded (20)

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 

The voice of the customer: TORM's experiences and needs within PSS - Allan H. Rasmussen, VP Fleet & Newbuilding Support for TORM A/S

  • 1. 1 PSS on vessel communication equipment 19/3-2013 Allan H Rasmussen
  • 2. TORM’s share price development over the past three years… 2 Copyright © 2013 Dagbladet Børsen A/S
  • 3. The restructuring agreement with banks and T/C-in partners concludes TORM’s comprehensive finance solution 3 Deferral of debts Extension of maturities until 31 December 2016 New capital USD 100m in working capital over two years Newbuilding program Elimination of newbuilding program completed Internal cost and cash initiatives Implementation of cost and cash initiatives with a cumulative effect of at least USD100m over three years Realigning time charter portfolio T/C-rates adjusted to market level or contracts terminated Compre- hensive finance solution for TORM     
  • 6. Diagram of the future technology onboard 6
  • 7. Bandwidth and Coverage Summary - today 7
  • 9. Background • TORM was first mover implementing Internet on board vessels • Lack of demand and competition on the market • Limited technical solutions available (high cost due to low demand) • Main purpose: Seafarer welfare • Initiative sponsored by TORM foundation • Buying and owning the equipment • Large size antennas • No strategy as such was stipulated • A long term binding contract with penalty was entered • No SLA (Service Level Agreement) 9
  • 11. Potential suppliers & evaluation criterion 11 A B C D Future proof technology NO YES NO NO Datapackage 500 MB Unlimited 500 MB 500 MB Service level 98 % 99,5 % 98 % 98 % Total cost Second best Leading Not competitive Not competitive References 1. Tanker Pacific 1. Nordic Tankers 2. Mærsk 1.American Seafood Company 2. Wilhelmsen 1. BP Shipping 2. BW Maritime 3. Farstad
  • 12. Comparison of key figures 12 A B Guaranteed uptime 98% 99,5% Monthly fee C-band rebuild & FBB USD X USD Y Monthly fee Ku-band & FBB USD XX USD YY Monthly data package 500 MB per month Unlimited Installation costs USD XXX USD YYY Contract exit cost 0 USD ZZZ
  • 14. Present & Future Solution 14 Present Future Strategy Supplier driven, based on supply TORM driven, based on demand Technology VSAT: C-Band V-SAT: KU-band Redundancy 15 vessels with FBB All vessels with FBB Bandwidth 256 kbps shared by up to 10 vsls 128 kbps dedicated per vsl E&E FB -77, SAT-B, SAT-C SAT-C (cost saving) Installation In dry docking (DD) only Estimate: 1 day no DD SLA N/A – TORM is responsible Supplier is responsible Guaranteed uptime N/A 99,5% Investment cost All equipment purchased and owned – USD 150.000 pr vsl 3 year leasing contract Installation + monthly fee
  • 15. Requirement specification Req Nr. Requirement Priori ty Supplier name: (To be filled in) Co de Comments 1.0 Technical Requirements 1.1 Primary modeof communication:VSAT - Ku Band w/Auto Beam switching (Completesystem including AboveDeck & below Deck units) ER 1 XpressLink is a managed service for a full redundant network in which the monthly service fee covers not only the hardware, but also all the data airtime. The service provides not only Ku band auto beam switching but also fail over functionality to the FleetBroadband standard IP service. The airtime for this is included in the service. 1.2 Ku band antenna upgradeableto Ka band ER 1 XpressLink includes a free upgrade path to the Global Xpress service (KA Band) when available in 2014. XpressLink provides a future proof communication set up. 1.3 Backup modeof communication:FBB 250 - Completesystem including AboveDeck & below Deck units ER 1 Weoffer Thrane & Thrane Sailor 500. Hardware is included in the service. 1.4 FBB 250 - Cordless phones with 3 handsets and G3 Fax machine CR 1 Weoffer FBB 500 from Trane & Trane 1.5 VOIP adaptors for usewith standard analoguephones (including cordless) CR 1 Included are 4 voice lines with handsets 1.6 Freevoice calls to Torm Global offices from ship and vice-versa CR 2 This part have to go in to project with our R&D 1.7 Corporatecommunicationavailability (Voice& email) 24x7x365 CR 1 Can Torm explain this better? 1.8 Bandwidth:min 512 / 512KBPS CR 1 Each vessel will be between 128kbps and 512kbps 1.9 ContentionRatio: max 1:6 CR 1Each vessel will be between 128kbpsand 512kbps 1.10 Committed IP Rate: Min 24 KBPS CR 1CIR: 128kbps 1.11 VoiceQuality per channel: Min 12 KBPS CR 1 1.12 Number of PCs connected to communicationsystem:Min 8 CR 1Wedo deliver two networks for thevessel and crew 1.13 Number of Telephones connected to communicationsystem: Min 2 (Corporate& Crew) CR 14 voicelines open and crew lines 1.14 Minimum expected data download per ship per week: 600MB CR 1 Unlimited usageof data see in our quotationParagraph 3.7 Fair usepolicy content filtering 1.15 Expected Monthly data download per ship: 8 GB ER 1 Unlimited usageof data see in our quotationParagraph 3.7 Fair usepolicy content filtering 1.16 All equipment mustbeMarineapproved CR 1TheFBB and VSAT antenna is approved 1.17 Multi Device connection box for automatic changeover from VSAT to FBB to G3 (to Satcom C), based on least cost routing & availability CR 2 Fail over functionality to FleetBroadbandstandard IP servicebased on availability of the KU band service. FleetBroadband standard IP services included. 1.18 Advanced spam and virus filters onboard & ashore - ESET Nod32 (alt: SOPHOS) CR 2 AmosConnect onboard Antivirus is based on thePortIT Antivirus servicewhich is ESET NOD32. Thelicense fee is US$ 30 per vessels per month and covers all thePCs. At theAmosConnect Email servicehub sideall incoming and outgoing messages are scanned for viruses. Next to this thereis a spam filter in place. 1.19 Firewalls onboard & ashore(firewall onboard must bepart of the'Multi Device Connection Box' manageable by TORM) CR 2 There are various solutionspossibleto meet theexact requirements of Torm. Further discussionsshould providea better understanding of therequirements and how tomeet them in thebest cost effectiveway. 1.20 Bandwidth Management Onboard incl IP traffic measurement/logging CR 1You can check bandwidth and uptimeat MySEVSAT.com 1.21 Traffic Management (Priority settings) Onboard CR 1Thevessel network has priority options 1.22 Content Filtering Onboard CR 1 There are various solutionspossibleto meet theexact requirements of Torm. Further discussionsshould providea better understanding of therequirements and how tomeet them in thebest cost effectiveway. 1.23 Data download accelerator / manager Onboard CR 1Included in theiDirect platform 1.24 Equipment complies with latest performancestandards, specified by ITU, at thetimeof each installation CR 1 1.25 Interference filters : example bandpass filters for radars, other comm. & Nav equipment CR 1Needs approval from our project department 1.26 HardwareReliability specification (MTBF) for key componentslikeBUC, ACU, Modems, etc CR 1 XpressLink is a full redundant networkbased on VSAT and FleetBroadband. Any failover for data in any direction is included in theservice fee. 1.27 Remotesupport(Maintenanceaccess via L-band FBB) CR 1 1.28 Pre-install survey, support, drawings, document CR 1 2 Internet access - guaranteed & verified for al least following sites 2.1 UKHO, Maris or similar electronic chart / publication data provider for updates & permits CR 1 2.2 DNV Navigator CR 1 2.3 eNOAD CR 1 TheAmosConnect Email servicelicense includes as well a US Coastguard Enoad application. 2.4 Port Information CR 1 2.5 Weather data CR 1 2.6 Torm India & Torm CPH server access CR 1 3 Communication Requirement - Crew 3.1 Voicecall using chat cards CR 1 3.2 Web Mail - Gmail, Yahoo, Facebook CR 1 3.3 Chat - Low bandwidth sites CR 1 3.4 SMS - Ship to shoremobilephones& viceversa CR 1 3.5 Low bandwidthinternet browsing for news, sports, banking etc. CR 1 4 Communication Requirement - Corporate 4.1 Email with attachment - Send & receive emails with attachments CR 1 4.2 Email client + communicator softwaremust bepart of package CR 1TheEmail service offered is AmosConnect 4.3 Data box with push-technologyfor large sizefiles (part of themulti devicebox) CR 2 There are various solutionspossibleto meet theexact requirements of Torm. Further discussionsshould providea better understanding of therequirements and how tomeet them in thebest cost effectiveway. 4.4 Voicecall - Quality minimum 12 KBPS per voicechannel CR 1 4.5 Fax - send & receive via 3G telephony CR 1Group 3 fax is fully supported. 4.6 Databaseexchange, PMS, Purchase, crewing, vetting, etc CR 1 4.7 Remoteaccess to shipboard computers & systems;filetransfer CR 1 4.8 Vessels E-mail addresses to be'Alias of TORM Domain' for eg. TormVsl.Com or Tormship.com ER 1On theEmail service AmosConnect this is supported. 5 Service Level Agreement (SLA) 5.1 Provision of adequatestock holding to ensureorders can bemet in timely order. Supplier must hold stockof completeaboveand below deck HW. ER 1 5.2 Provision of adequatespares mustbeheld to mesureimmediateavailability for field service attendanceat key geographic locations: Singapore, Fuijarah, Rotterdam, Gibraltar, New York, Amsterdam, Gibraltar, Houston, Antwerp. R 2 Rotterdam, Alesund, Reykjavik, Singapore, Houston, Dubai. Other harbors will be added to this service map later this year, including Hong Kong. 5.3 Preinstallation report written and delivered 5 days from sitesurvey form being submitted. ER 1 5.4 Equipment availablefully tested and configured for customer specific requirement as detailed in thepreinstallaion form and ready to ship 15 days prior to delivery. ER 1 5.5 Issuing of telephonenumbers/IP addressesesand tracking details of equipment toTORM within 48 hoursof dispatch ER 1 5.6 Minimum commitentof 3 vessel installationsper monthon agreed location. ER 1 5.7 Calls answered by support desk within40 seconds R 1 5.8 In event of fault not being rectified by Support Desk, subsequentresponseby NOC or systemsengineer to provideremotetechnical support tothevessel within 1 hour. ER 1 5.9 Calls reamianing open progress chased within 48 hours. R 1 5.10 All calls closed within 7 days. ER 2 5.11 In event TORM decides that remotesupport cannotfix problem and that a replacement part can be sent withoutengineer (eg. Moden or voice handset whereequipment can easily be replaced without engineer being needed) thedispatch mustbemadethenext working day. ER 1 5.12 Mobilisation of nearest serviceengineer or In-Country Agent as applicablewithin 36 hours. R 1 5.13 Acknowledgementof complaint within 24hours from timeof receipt. ER 1 5.14 Formal responseto complaintwith recommendations for resolutionwithin48 days. R 1 5.15 Completeclosureof complaint within 7 days. ER 1 5.16 Network availablity 99% basedon FBB and VSAT combined solutionexcept Polar regents. ER 1 6 Payment/Invoicing 6.1 Payment terms:45 days net from receipt of correct invoicefrom theSupplier CR 1 6.2 TheSupplier is responsiblefor ensuring pricetransparency at all times and document that all prices are net and according to agreement. ER 1 6.3 Copies of invoices and credit notes can bedownloaded on theinternet withno additional costs for theCustomer. R 1 6.4 Onemonthly invoiceper month per vessel in PDF (electronic format) ER 21 Invoicefor Vsat / Xpresslink setup, 1 invoicevarious services, 1 for Fleetbroadband 7 Implementation 7.1 TheSupplier is in coordination with TORM responsiblefor preparing an implementation plan ensuring that theimplementation of equipmenton board runssmoothly. ER 1 15 Req Nr. Requirement Priority Supplier name: (To be filled in) Code Comments 1.0 Technical Requirements 1.1 Primary mode of communication: VSAT - Ku Band w/Auto Beam switching (Complete system including Above Deck & below Deck units) ER 1 XpressLink is a managed service for a full redundant network in which the monthly service fee covers not only the hardware, but also all the data airtime. The service provides not only Ku band auto beam switching but also fail over functionality to the FleetBroadband standard IP service. The airtime for this is included in the service. 1.2 Ku band antenna upgradeable to Ka band ER 1 XpressLink includes a free upgrade path to the Global Xpress service (KA Band) when available in 2014. XpressLink provides a future proof communication set up. 1.3 Backup mode of communication: FBB 250 - Complete system including Above Deck & below Deck units ER 1 We offer Thrane & Thrane Sailor 500. Hardware is included in the service. 1.4 FBB 250 - Cordless phones with 3 handsets and G3 Fax machine CR 1 We offer FBB 500 from Trane & Trane 1.5 VOIP adaptors for use with standard analogue phones (including cordless) CR 1 Included are 4 voice lines with handsets 1.6 Free voice calls to Torm Global offices from ship and vice-versa CR 2 This part have to go in to project with our R&D
  • 16. Requirement specification Area. 1 Description: Question Supplier name: (to be filled) Supplier reply in short: Q.1.1 Customer service Please outline the full process for an in-service VSAT Ku-band installation on board a TORM tanker, including how this interfaces with the LAN network. Please include any drawings where appropriate. Installation will take about 1 day, depending on the preperations from the vessel side. Most commonly is that the vessel will run the cabels, place the foundation and antenna on place. The ShipEquip technician will terminate the cabels and commissioning the system. The SE router and will be connected to the LAN network onboard. Q.1.2 Customer service Please provide details of your after sales and support network, including proposed KPIs for monitoring the contract performance. The preformance such as uptime and usage reports can be measured realtime on MySEVSAT.com Please also see the SLA doc. Q.1.3 Customer service The following tasks should be considered in respect of the installations: - fabrication of the pedestal /mast for the antenna - installation of the pedestal/mast in place (possibly strengthening of the deck below) - mounting radom - cabling - commissioning - configuration with TORM IT systems Supplier should list Supplier and TORM responsibilities for each point above. Methodology for carrying out specific tasks should also be included in your response. The following tasks should be considered in respect of the installations: - fabrication of the pedestal /mast for the antenna Not Inmarsat scope of work, we will recommend pedestal height and location. - installation of the pedestal/mast in place (possibly strengthening of the deck below) Not Inmarsat scope of work, we can give some advises based on previous installations on similar vessels. - mounting radome Normally performed by vessel crew, a crane normally required - cabling Cables according to attached pdf 4009-SG5U-881to be pre-installed by vessel crew to save time during commissioning. Inmarsat technician will terminate all cable ends and connect to Vsat equipment. - commissioning To be performed by Inmarsat technician, normally 1-2 days required if pre-installation work checklist is completed before attendance of technician. Crew training will be performed. - configuration with TORM IT systems Inmarsat support/operation/R&D will assist with setup. 16
  • 17. Roles and responsibilities during implementation - And what about insurance? 17
  • 18. Other areas to consider for similar setup… Cooperation between TORM and DTU Mechanical Engineering • Ph.d. Researcher Jakob Axel Bejbro Andersen • Two students doing their master project in TORM Technical Division – Lars Jørgensen & Christian Johannesen • Focusing on PSS, identifying and listing areas of interest • Full analysis and tender process -> implementation for at least one area Examples of possible PSS areas identified: • Hull and propeller cleaning • Navigational equipment • Life saving appliances • Propulsion and power production - reliability and TCO • Measurement equipment • Energy optimization devices 18
  • 19. From Wikipedia, the free encyclopedia: A partnership is an arrangement where parties agree to cooperate to advance their mutual interests 19
  • 20. 20
  • 21. 21