Improvement and Recovery of for Acoustic Quality Day - Sant Feliu [en]

400
-1

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
400
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Improvement and Recovery of for Acoustic Quality Day - Sant Feliu [en]

  1. 1. PLANS OF ACTION IN AGGLOMERATIONS•CONTACT WITH OTHER MUNICIPALITIES AND URBAN CONTINUITY•GROUP A HIGH LEVEL OF POPULATION•MUST WORK TOGETHER AND COORDINATED BY THE WORKING ANACTION PLAN FOR IMPROVING THE QUALITY AND RECOVERY OFACOUSTIC URBAN AGGLOMERATION
  2. 2. Urban agglomeration BAIX LLOBREGAT - 221 406inhabitants.inhabitants.Esplugues de Llobregat (46,586 hours)Cornella de Llobregat (85,180 hours)Sant Just Desvern (15,365 hours)Sant Joan Despi (31,647 hours)Sant Feliu de Llobregat (42,628 hours)
  3. 3. THE OPERATION OF THE ACTION PLAN AGGLOMERATION supra•TO PROMOTE AND COORDINATION OF THE TECHNICAL IMPROVEMENT OFACOUSTIC•ESTABLISHMENT OF AN INVENTORY OF ALL POSSIBLE ACTIONS.•INTERNAL WORK OF EACH MUNICIPALITY OF COMPILATION, ANALYSIS ANDPROPOSED MEASURES APPLIED IN YEAR AND FUTURE.•VARIOUS MUNICIPAL DEPARTMENTS ARE INVOLVED IN THE IMPROVEMENTAND RECOVERY ACOUSTICS. URBANISM AND PLANNING. MANAGING MOBILITY, TRANSPORT AND THE MUNICIPAL Fleet. MAINTENANCE AND IMPROVEMENT OF PUBLIC ROADS. CONTROL OF ECONOMIC ACTIVITIES. ROAD TRAFFIC CONTROL AND DISCIPLINE.
  4. 4. PROMOTED METHOD FOR IMPROVING THE TECHNICAL ACOUSTICS1.Description of the agglomeration1.1 Data from the crowd:1.2 Major sources of noise:2.The sound quality objectives established under the maps of noise capacityof each municipality.3. Summary of tasks mapped4. Evaluation of the estimated number of people exposed to noise4.1 Situations that should improve4.2 Situations that must be preserved5. Summary of the process of approval and value of allegations of strategic noise maps (MORE)6. Measures already implemented to reduce noise and projects in preparation
  5. 5. 7. The actions planned for the coming years7.1 Specific measures to protect the quiet areas7.2 Long-term Strategies8. Financial information and calendar SHARE OF MUNICIPAL PLANIFICABLES THE PROPOSED PLAN OF ACTION THE SERVICE AND LOW urban agglomeration •PLANS FOR URBAN TRAFFIC CALMING. •RENOVATIONS AND REFORMS ROAD. •PLANS SURFACE. •IMPROVEMENT PLANS URBAN DISTRICTS LINKED TO ACT. •MOBILITY PLANS OR BUSINESS OR TRAVEL CENTERS OF GENERATORS MOBILITY. •DEVELOPMENT PLANS OF THE BIKE.
  6. 6. MUNICIPAL ACTION SUMMARY 1 On the management of mobility: Encourage the use of public transport, bus, train, tram, metro. Promoting access to public transport to shopping areas, entertainment, markets and Christmas campaigns. Encourage walking and priority for pedestrians. Time Limitation of movement of heavy traffic. Promotion of car sharing. Promoting cycling for short journeys;SUMMARY OF MUNICIPAL ACTION 2:On the road.Installation of noise-absorbing asphalt.Create inverted priority streets.Increasing pedestrian areas, connecting the islands of pedestrianplazas and green spaces, creating itineraries and corridors of urbansustainable mobility.Applying zones 30, and zones 10.Increase km bike lanes;Installation steps - zebra or pedestrian systems and high speedreducers.
  7. 7. SUMMARY OF MUNICIPAL ACTION 3 Awareness-raising: Environmental education campaigns Audit in schools. Promote school activities on week-acoustic Environment Organizing activities on noise during the European Week of Sustainable Mobility and safety. Incentives Financial support to implement direct acoustic insulation in homes. Reduction of taxes for municipal road electric vehicles or very low emissions.SUMMARY OF MUNICIPAL ACTION 4Regulation and legislation:Updating the map of acoustic capacity.Implementation regulations on noise in the licensing of activities.Coordinating municipal inspection work on the acoustics.
  8. 8. SUMMARY OF MUNICIPAL ACTION 5 Strategic: About future actions of urban planning and infrastructure: Implementation of urban mobility plans. Monitoring and review of Environmental Impact Studies.Examples of activities and opportunities for improvement andrecovery of sound quality:•Accession municipal Covenant of Mayors for sustainable energy. SEAP.Sustainable Energy Action Plan. Boost for electric vehicles. Allowsfunding, European Investment Bank EIB•Opportunity to improve overall strategic urban Underground railway line and development criteria of calming traffic,noise mitigation and urban sponginess.•GESMOPOLI Project - Sustainable mobility management in industrialestates..
  9. 9. Underground railway line and development with traffic calmingcriteria, mitigation and urban sponginess.NEW OPPORTUNITY urban centralityRadical improvement of the noise situation
  10. 10. GESMOPOLI PROJECT - SUSTAINABLE MOBILTAT ININDUSTRIALCoordination and cooperation with:AdministrationBusiness associationsUnionsObjective-. improving mobility and transportation of people andgoods in industrial estates, with sustainability criteriaCommitment and funding of actions to perform.Compact for mobility of industrialOfficers monitoring the actions.Creating the position of Manager of Mobility of the polygon.

×