Digital Plymouth - Can We Host A Google Data Centre?

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    Digital Plymouth - Can We Host A Google Data Centre? - Presentation Transcript

    1. Mark Craddock – Managing Director Flexible Computing Ltd
    2.  Flexible Computing - Who Are We?  Digital Plymouth  Connected City  Facilities  Can Plymouth Host a Google Data Centre?
    3.  Dedicated IXP  Multiple Carriers ▪ TATA ▪ Apollo  Data Centre(s)  ISPs  ASPs  Co-Location  H20  Last Mile  FTTH
    4.  Fibre Ring  All City Business Parks ▪ Tamar Business Park ▪ Technology Park ▪ +South Hams Energy Park  Major Businesses / Education ▪ TwoFourTwo ▪ NHS ▪ City Council ▪ University  Local Development Framework ▪ Eastern Corridor  Redundancy
    5.  Apollo Transatlantic Cable  Bude Cable Station  Co-Location Facility  Carrier Agnostic  Dual Redundant Routes  Initial discussions to bring the ‘Apollo’ Brand to Plymouth
    6.  <5ms Latency to Docklands  Enables synchronous data replication  <34ms Latency to New York  Enables asynchronous data replication Plymouth London Bude Businesses Businesses Plymouth Cable Station London Surrey IXP POP PLINX L/S Apollo POP H2O - ISP London IXP Latency - <5 ms
    7.  TATA Transatlantic Cable  Highbridge Cable Station  Co-Location Facility  Carrier Agnostic  Dual Redundant Route, Poddington, Barnstable  Initial Discussions to provide 10Gb Connectivity to Plymouth
    8.  <5ms Latency to Docklands  Enable synchronous data replication  <34ms Latency to New York  Enables asynchronous data replication Plymouth London Highbridge Businesses Businesses Plymouth Cable Station London Surrey IXP POP PLINX L/S TATA POP H2O - ISP London IXP Latency - <5 ms
    9.  75% IXPs in Europe < 20Gbs  4 x Redundant 10Gb Links to Plymouth  Bude – Plymouth  Bude – Plymouth  Highbridge – Plymouth  Poddington – Plymouth
    10.  Apollo  Provides connection to Docklands  Peers with xx ISPs  Peers with Google  TATA  Provides connection to Surrey House  Peers with xx ISPs  Peers with Google
    11.  Peering  H2O  Cable & Wireless  BT  Virgin Media  Mount Wise  TwoFourTwo  Google?  Microsoft?  Amazon?
    12.  <5ms Docklands  Data Replication  Disaster Recovery Services  Hosting  Co-Location  Select Most Economical Services for Plymouth ▪ Select High Margin Services
    13.  Locations
    14.  How much does Google spend on data centres?  According to Google’s earnings reports, they spent $1.9 billion on data centres in 2006, and $2.4 billion in 2007.  Google unveiled four new data centre projects in 2007. Each has a cost estimate of $600 million, which will include everything from construction to equipment and computers.
    15.  All less than 1.3  Achieved by rigorous application of best practices:  Air-side economization  Water-side economization  Close coupled cooling  99.9% UPS efficiency  Distributed on-board UPS  Single voltage motherboard (12v)  Motherboard provides 5v to disk and all step downs needed by on board requirements  Installed a lead-acid distributed UPS to ride through power sags  Avoids double conversion of many central UPS  Only enough power in UPS to allow generators to start or to switch to other A/C supply  Best Google facility on quarterly basis: PUE => 1.19
    16.  How much energy do Google data centres use, exactly?  Google’s major data centres are supported by at least 50 megawatts of electric power, with some estimates ranging as high as 103 megawatts - which is what Harpers magazine guesses is the power load for Google’s data centre in The Dalles, Oregon. We suspect that estimate is slightly high, as it assumes 500 watts per square foot across the total footprint of the facility – which includes both technical and non-technical space.  By any measure, Google uses a boatload of power. The company has sought to avoid disclosing its power usage in its data centres. Prior to Google’s announcement of its Pryor, Oklahoma project, state legislators passed a law exempting municipal power companies from the requirement to report the amount of power used by their largest industrial customers.  There are other data centre complexes that use more power than Google’s facilities. Digital Realty Trust has a facility in Chicago that has a 100 megawatt power feed, and a data centre campus in Ashburn, Virginia that is wired for 225 megawatts.
    17. Requirement Can we meet it? Large volumes of cheap electricity. Plymouth has a new power station outputting 875MW Green energy. Focuses on renewable power sources. YES Proximity to rivers and lakes. They use a large amount of water for Plymouth is surrounded by water. cooling purposes. Other high tech facilities have direct pipelines into the local reservoir YES Large areas of land. Allows for more privacy and security. Plenty of land YES The distance to other Google data centres (for fast connections Plymouth will be connected directly into the transatlantic internet between data centres). connections with a <5ms latency to docklands YES Tax incentives. There is some funding available, but limited. NO

    + mcraddockmcraddock, 3 months ago

    custom

    195 views, 0 favs, 0 embeds more stats

    Digital Plymouth - Can we host a Google data centre more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 195
      • 195 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 0
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?