Marisse S. Tabor
Prc Lic. 0007266
Contact: 0919 692 3588
Email: mbrmls@gmail.com
SUMMERHILLS HOME DEVELOPMENT CORPORATION (SHDC)
Marisse S. Tabor
Prc Lic. 0007266
Contact: 0919 692 3588
Email: mbrmls@gma...
Marisse S. Tabor
Prc Lic. 0007266
Contact: 0919 692 3588
Email: mbrmls@gmail.com
Marisse S. Tabor
Prc Lic. 0007266
Contact: 0919 692 3588
Email: mbrmls@gmail.com
Click to edit the
outline text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline
Level
−Fifth
Outline
Ou...
CENTRO DE ORO
WHY GEN. TRIAS, CAVITE?
Economy
Industrialization has become the centerpiece of the municipality’s
development plans and p...
CENTRO DE ORO
HENERAL UNO
RIO DE ORO
Click to edit the
outline text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline
Level
−Fifth
Outline
Ou...
L/A = 57 sqm
F/A = 21.25 sqm
Provision for
Carport
Provision for
1 Bedroom
1 Toilet & Bath
Laundry Area
Emilio (duplex)
RE...
INTERIOR
TOILET & BATH
SUGGESTED EXPANSION
SUGGESTED EXPANSION
Plastered and Painted Finish (Interior and Exterior Walls)
Provision for Carport
FASCIA BOARD (Fiber Cement Board) Pre-pai...
Purlin
Rafter
ANTONIO (single attached)
LOT AREA = 72 sqm FLOOR AREA = 28.75 sqm
BROWN HILLS BLUE SKIES
GRAY STONE YELLOW SUN
Different colors as designated by SHDC
Entrance Gate with Guard House
Multipurpose Hall
Neighborhood Wet and Dry Market
Basketball Court
Community Chapel
Health ...
Click to edit the
outline text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline
Level
−Fifth
Outline
Ou...
L/A = 72 sqm
F/A = 34 sqm
Provision for
Carport
1Bedroom
Provision for
second Bedroom
1 Toilet & Bath
Laundry Area
Pauline
INTERIOR
INTERIOR
BEDROOM
TOILET AND BATH
L/A = 100 sqm
F/A = 50 sqm
Provision for carport
Loft
Provision for
2 Bedrooms at Loft
1 Toilet & Bath
Laundry Area
Celine
Click to edit the
outline text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline
Level
COLOR VARIATION
Click to edit the
outline text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline
Level
−Fifth
Outline
P3...
Click to edit the
outline text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline
Level
sample computatio...
L/A = 100 sqm
F/A = 50 sqm
Provision for carport
Loft
Provision for
2 Bedrooms at Loft
1 Toilet & Bath
Laundry Area
Celine
Click to edit the
outline text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline
Level
−Fifth
Outline
Ou...
• Simple Reservation Requirements:
• Xerox of company ID (front & back)
• Photocopy of government issued IDs
• Latest Pays...
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Summerhills Home Development Corporation by Sm Land
Upcoming SlideShare
Loading in...5
×

Summerhills Home Development Corporation by Sm Land

854

Published on

FOR INQUIRIES PLS. CONTACT:
Marisse S. Tabor
Prc. Lic. 0007266
Contact: 09196923588
Email: mbrmls@gmail.com
Website: http://shdcsmland.blogspot.com
http:///smdcresidences.moonfruit.com

Published in: Real Estate, Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
854
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
1
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Transcript of "Summerhills Home Development Corporation by Sm Land"

  1. 1. Marisse S. Tabor Prc Lic. 0007266 Contact: 0919 692 3588 Email: mbrmls@gmail.com
  2. 2. SUMMERHILLS HOME DEVELOPMENT CORPORATION (SHDC) Marisse S. Tabor Prc Lic. 0007266 Contact: 0919 692 3588 Email: mbrmls@gmail.com
  3. 3. Marisse S. Tabor Prc Lic. 0007266 Contact: 0919 692 3588 Email: mbrmls@gmail.com
  4. 4. Marisse S. Tabor Prc Lic. 0007266 Contact: 0919 692 3588 Email: mbrmls@gmail.com
  5. 5. Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level −Fifth Outline Our Location
  6. 6. CENTRO DE ORO
  7. 7. WHY GEN. TRIAS, CAVITE? Economy Industrialization has become the centerpiece of the municipality’s development plans and programs. Several major industrial estates, such as Gateway Business Park, a world class business community in Javalera and the New Cavite Industrial City (NCIC) in Manggahan, have chosen General Trias to be their home base. General Trias is considered one of the new frontiers of growth and development in the CALABARZON area Built up area With the continuous expansion of Metro Manila, the municipality is now included in Manila built up area which reaches Lipa City in its southernmost part.
  8. 8. CENTRO DE ORO HENERAL UNO RIO DE ORO
  9. 9. Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level −Fifth Outline Our Socialized Units
  10. 10. L/A = 57 sqm F/A = 21.25 sqm Provision for Carport Provision for 1 Bedroom 1 Toilet & Bath Laundry Area Emilio (duplex) RESERVATION FEE P2,500 ONLY! P2,857 / 12 MONTHS CASH OUTLAY As LOW as P3,018 mo. amortization
  11. 11. INTERIOR
  12. 12. TOILET & BATH
  13. 13. SUGGESTED EXPANSION
  14. 14. SUGGESTED EXPANSION
  15. 15. Plastered and Painted Finish (Interior and Exterior Walls) Provision for Carport FASCIA BOARD (Fiber Cement Board) Pre-painted Ribspan Roofing Steel Hollow Core Door (all steel jamb) Steel Casement Windows
  16. 16. Purlin Rafter
  17. 17. ANTONIO (single attached) LOT AREA = 72 sqm FLOOR AREA = 28.75 sqm
  18. 18. BROWN HILLS BLUE SKIES GRAY STONE YELLOW SUN Different colors as designated by SHDC
  19. 19. Entrance Gate with Guard House Multipurpose Hall Neighborhood Wet and Dry Market Basketball Court Community Chapel Health Center Day Care Center Features and Amenities
  20. 20. Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level −Fifth Outline Our Affordable Units
  21. 21. L/A = 72 sqm F/A = 34 sqm Provision for Carport 1Bedroom Provision for second Bedroom 1 Toilet & Bath Laundry Area Pauline
  22. 22. INTERIOR
  23. 23. INTERIOR
  24. 24. BEDROOM
  25. 25. TOILET AND BATH
  26. 26. L/A = 100 sqm F/A = 50 sqm Provision for carport Loft Provision for 2 Bedrooms at Loft 1 Toilet & Bath Laundry Area Celine
  27. 27. Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level COLOR VARIATION
  28. 28. Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level −Fifth Outline P3,300 / sqm OPTION 1 CASH PAYMENT (WITHIN 30 DAYS) OPTION 1 CASH PAYMENT (WITHIN 30 DAYS) OPTION 2 DEFERRED CASH (24 MONTHS) 0% OPTION 3 20% DOWNPAYMENT SPOT 20% DP (30 DAYS) LESS RF OF P10,000 12 MONTHS/24 MONTHS @ 0% INTEREST 80% BALANCE 5 YRS @ 12% INTEREST RATE 10 YRS @ 14% INTEREST RATE Lots forSale RESERVATION FEE = P10,000
  29. 29. Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level sample computation for LOTS only TCP P330,00 0 20% DP 66,000 LESS RESERVATION FEE 10,000 NET DOWNPAYMENT 56,000 12 MOS. TO PAY (0% INTEREST) 4,666.66 24 MOS. TO PAY (0% INTEREST) 2,333.33 80% BALANCE 264,000 MA (5 YRS) 12% 5,872.53 MA (10 YRS) 14% 4,099.53 100 SQM
  30. 30. L/A = 100 sqm F/A = 50 sqm Provision for carport Loft Provision for 2 Bedrooms at Loft 1 Toilet & Bath Laundry Area Celine
  31. 31. Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level −Fifth Outline Our Simple Ways to own these units!
  32. 32. • Simple Reservation Requirements: • Xerox of company ID (front & back) • Photocopy of government issued IDs • Latest Payslip • ESAV

×