Mrr september 2013

256
-1

Published on

Manila Rivercity Residences Sta ana Manila near Makati
Available in 1br,2br and studio unit
Affordable and Accessible ready for Occupancy Available
for more details
contact Ela Balidoy

Published in: Real Estate, Travel, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
256
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Mrr september 2013

  1. 1. A CDC Holdings Inc. development Live, Love where the River flows… Manila Rivercity Residences
  2. 2. Value Proposition What : A riverside condo development that combines the best of history, accessibility and lifestyle. Where : Sta. Ana Manila Who : For modestly earning urban individuals or young families. Why : Looking for an elevated lifestyle that caters to urbanized tastes and sensibilities while being conveniently situated near major business districts and other places of interest.
  3. 3. Why Manila Rivercity Residences? • CDC Holdings Inc. has a proven track record when it comes to timely delivery. • Lower in density than most projects • Offers 2BR units for families. For a 2BR at 44.35 sqm the unit can accommodate a household of four to five members vs. other competitors who are offering 37 sqm average for a 2BR unit. • Lower price range compared with direct competitors that also offers the same amenities in terms of per square meter price. • The property is in an ideal location, conveniently situated within minutes of Makati, Mandaluyong and Manila.
  4. 4. Location : De las Alas St., Sta. Ana Manila Land Area : 14,000 sqm Type of Development : Medium-Rise Residential Development : 9 medium-rise buildings ranging from 9 to 20 floors Unit Types : studio, 1BR, 2BR and bi level units Price Range : 1.1M to 3.6M Project Overview
  5. 5. Location • The project is located at De las Alas St., Sta. Ana Manila • The main entrance gate is along De las Alas St. • The property is approximately 10 minutes away from Makati CBD • The property can be accessed through many different points, e.g. from Makati via JP Rizal or from the Quirino Highway.
  6. 6. The following destinations are accessible from Manila Rivercity Residences: Resorts World Circuit Makati Makati CBD Robinsons Manila Rockwell Ortigas CBD
  7. 7. Distances from Major Establishments Educational Institutions Approximate Time Difference from Site OB Montessori Manila 3 mins. Don Bosco Makati 15 mins. Assumption San Lorenzo (Makati) 17 mins. St. Scholastica 20 min. Medical Centers Approximate Time Difference from Site Sta. Ana Medical Center 5 mins. St. Luke’s Hospital (The Fort) 20 mins. Makati Medical Center 15 mins.
  8. 8. Distances from Major Establishments Business Districts Approximate Time Difference from site Makati CBD 10 mins. Ortigas CBD 30 mins. Public Market Approximate Time Difference from site Sta. Ana Market 3 mins. Airports Approximate Time Difference from site NAIA 3 20 mins Domestic Airport 20 mins NAIA 1 25 mins NAIA 2 25 mins
  9. 9. Distances from Major Establishments Commercial Establishments Approximate Time Difference from site SM Makati 15 min Robinsons Manila 15 min Puregold Makati 5 min Savemore Sta. Ana 5 min Greenbelt Makati 15 min Megamall 30 min Market Market 25 min. Places of Worship Approximate Time Difference from Site Sta. Ana Church 5 min Victory Fort 25 min Sanctuario de San Antonio Forbes Park, Makati 20 min
  10. 10. Site Development Plan
  11. 11. Site Development
  12. 12. Amenities 2 Storey Grand Pavilion
  13. 13. MRR’S PAVILION INTERIOR SHOTS : Amenities
  14. 14. Water Features Amenities
  15. 15. Swimming Pool and Kiddie Pool Amenities
  16. 16. Children’s Play Area Amenities
  17. 17. Proposed environment friendly features: • Solar Panel • Rain water catch basin • Waste segregation • Landscaped Park • Pavilion • Water featured landscaping Site Features
  18. 18. Rhine and Amazon Tower
  19. 19. FUNCTION HALL With Toilet and Pantry Wi-Fi Ready Rhine and Amazon Tower
  20. 20. Kumagawa Tower
  21. 21. Yangtze Tower
  22. 22. Bi-Level Units at Yangtze Tower
  23. 23. • Elevator • 1.5 meter-wide corridors • Roof deck with landing area • Service stairs • Overhead tanks with water pump • Standby generator for common areas Building Features
  24. 24. Yangtze Building Lower Ground Floor Plan
  25. 25. Upper Ground Floor Plan Yangtze Building
  26. 26. RESIDENTIAL AREA A. Floor Finishes Living, Dining & Kitchen Vinyl Planks Bedrooms Vinyl Planks Toilet Unglazed ceramic tiles Utility Area Plain cement finish B. Wall Finishes No partition walls for bedroom/s Interior walls 1-coat paint on concrete walls Toilet 1-coat plain cement finish above tile Unit Finishes
  27. 27. C. Ceiling Finishes Living, Dining & Kitchen 1-coat paint on plain cement finish Bedrooms 1-coat paint on plain cement finish Toilet 1-coat paint on ficem board finish D. Kitchen Kitchen counter top with sink & faucet. Under counter cabinet door & overhead cabinet are not included. E. Door Entrance Bedroom door Solid finger jointed wood with sheet laminated and solid wood core door jambs plus casing F. Windows Aluminum windows Unit Finishes
  28. 28. Typical Unit Floor Plan Yangtze Building
  29. 29. Yangtze Building Typical Unit Floor Plan
  30. 30. Typical Unit Floor Plan Yangtze Building
  31. 31. Typical Unit Floor Plan Yangtze Building
  32. 32. Typical Unit Floor Plan Yangtze Building
  33. 33. Typical Unit Floor Plan Yangtze Building
  34. 34. Typical Unit Floor Plan Yangtze Building
  35. 35. Typical Unit Floor Plan Yangtze Building
  36. 36. Typical Unit Floor Plan Yangtze Building
  37. 37. Typical Unit Floor Plan Yangtze Building
  38. 38. Typical Unit Floor Plan Yangtze Building
  39. 39. • As low as PHP 1.1M for a studio unit • As low as PHP 4,400 per month • Flexible payment scheme (down payment – payable up to 24 months; balance – payable up to 30 years through Pag-IBIG) • Available financing through in-house, bank or Pag-IBIG Affordability
  40. 40. Construction Updates Rhine Tower As of September 2013
  41. 41. Construction Updates Rhine Tower As of September 2013
  42. 42. Construction Updates Rhine Tower As of September 2013
  43. 43. Construction Updates Amazon Tower As of September 2013
  44. 44. Construction Updates Kumagawa Tower As of September 2013
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×