Your SlideShare is downloading. ×
MANILA RIVERCITY RESIDENCES STA ANA MANILA
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

MANILA RIVERCITY RESIDENCES STA ANA MANILA

2,734
views

Published on

MANILA RIVERCITY LOCATED AT STA ANA MANILA …

MANILA RIVERCITY LOCATED AT STA ANA MANILA
NEAR CONCORDIA COLLEGE ,5MINUTES WALK TO CHURCH,SAVEMORE,BANK,MARKET SCHOOLS AND MORE,15MINUTES TO MAKATI BUSINESS DISTRICT
TOTAL PRICE
STUDIO 21.05SQM (1,178,800.00
1BEDROOM 28.10SQM (1,545,500.00
2BEDROOM 42SQM (2,439,250.00


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
2,734
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square meters with 62 percent of the area allotted for roads, landscaped areas and amenities such as playground, swimming pool , and water-featured landscapes. Comprised of 9 buildings ranging from 10 – 14 floors.
  • 2. LOCATION MAP
  • 3. • Along the historic and scenic banks of Pasig River in Sta. Ana, Manila • Surrounded by the nation’s busiest economic centers of Makati, San Juan, Mandaluyong and Manila • Close to school areas • Accessible to public transportation LOCATION
  • 4. SITE DEVELOPMENT
  • 5. SITE DEVELOPMENT PROPOSED SITE DEVELOPMENT @ REAR PORTION OF YANGTZE BUILDING FRONTING PASIG RIVER
  • 6. AMENITIES
  • 7. SITE FEATURES Proposed environment friendly features: • Solar Panel • Rain water catch basin • Waste segregation • Landscaped Park • Pavillion • Water featured landscaping
  • 8. YANGTZE BUILDING
  • 9. BUILDING FEATURES • Elevator • 1.5 meter-wide corridors • Roof deck with landing area • Service stairs • Overhead tanks with water pump • Standby generator for common areas
  • 10. TYPICAL FLOORPLAN YANGTZE BUILDING
  • 11. TYPICAL FLOORPLAN YANGTZE BUILDING
  • 12. TYPICAL FLOORPLAN YANGTZE BUILDING
  • 13. UNIT FINISHES • RESIDENTIAL AREA A. Floor Finishes Living, Dining & Kitchen Vinyl Planks Bedrooms Vinyl Planks Toilet Unglazed ceramic tiles Utility Area Plain cement finish B. Wall Finishes No partition walls for bedroom/s Interior walls 1-coat paint on concrete walls Toilet 1-coat plain cement finish above tile
  • 14. UNIT FINISHES C. Ceiling Finishes Living, Dining & Kitchen 1-coat paint on plain cement finish Bedrooms 1-coat paint on plain cement finish Toilet 1-coat paint on ficem board finish D. Kitchen Kitchen counter top with sink & faucet. Under counter cabinet door & overhead cabinet are not included. E. Door Entrance & Bedroom door Solid finger jointed wood with sheet laminated and solid wood core door jambs plus casing F. Windows Aluminum windows
  • 15. UNIT FINISHES G. Finishing Hardware Cylindrical lockset for main Privacy lockset for T & B door. H. Toilet & Kitchen Fixtures Water and Closet Lavatory Complete set of water closet and lavatory with fittings & accessories. Shower faucet Complete set of shower with faucet and fittings. I. Electricity Complete outlet and lighting devices with circuit breaker.
  • 16. UNIT FINISHES
  • 17. TYPICAL UNIT FLOOR PLAN
  • 18. TYPICAL UNIT FLOOR PLAN
  • 19. TYPICAL UNIT FLOOR PLAN
  • 20. TYPICAL UNIT FLOOR PLAN
  • 21. TYPICAL UNIT FLOOR PLAN
  • 22. AFFORDABILITY • As low as PHP 1.1M for a studio unit • As low as PHP6,000 per month • Flexible payment scheme (down payment – payable up to 24 months; balance – payable up to 30 years through Pag-IBIG) • Available financing through in-house, bank or Pag-IBIG
  • 23. CERTIFICATE & PERMIT
  • 24. ConstructionConstruction UpdatesUpdates
  • 25. RHINE’S ACCOMPLISHMENT PHOTOS: ON-GOING 19th Floor Slab Preparation TO DATE 9TH 8TH 2ND 7TH 3RD 4TH 6TH 5TH 14TH 15TH 12TH 11TH 10TH 16TH 17TH 18TH 19TH
  • 26. On-going 2nd Floor slab - 2nd section AMAZON’S ACCOMPLISHMENT PHOTOS: PREVIOUS TO DATE
  • 27. MRR PAVILLION
  • 28. G/F Clubhouse 2/F Multi-purpose Hall MRR’S PAVILION INTERIOR SHOTS : ADMIN AREA GRANITE COUNTERTOP T&B AREA FOYER AREA
  • 29. Swimming Pool ready for testing MRR’S SWIMMING POOL:
  • 30. SWIMMING POOL & AMENITY AREA:
  • 31. EUPHRATES LANDSCAPE AREA: Landscaping works Childrens’ Play area
  • 32. Over-all Project Site: NILE (OPERATIONAL) BLUE DANUBE ( OPERATIONAL ) DNIEPER (OPERATIONAL) COLORADO (OPERATIONAL) EUPHRATES (100% Completed for Unit Owner’s Acceptance) AMAZON (20 STOREY) KUMAGAW A (15 STOREY) RHINE (20STOREY) YANGTZE (15 STOREY)