Your SlideShare is downloading. ×
  • Like
SmartSlope Boschert Progress 10 10-2011
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

SmartSlope Boschert Progress 10 10-2011

  • 1,258 views
Published

A short slide show of job-site progress pictures from the Boschert Greenway Trail and the building of a new SmartSlope Living Retaining Wall. http://www.thelivingwallco.com

A short slide show of job-site progress pictures from the Boschert Greenway Trail and the building of a new SmartSlope Living Retaining Wall. http://www.thelivingwallco.com

Published in Education , Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
1,258
On SlideShare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Ideal Landscape Group Starts the SmartSlope Wall at Boschert Greenway Trail for Great Rivers Greenway.
    Check out our Website @ SmartSlope.com
  • 2. Wall area is excavated, footing is marked and then dug out – ready for base rock.
  • 3. Base rock is placed, leveled and compacted – ready for SmartSlope modules in the morning!
    Visit Our Website @ smartslope.com for more information