SmartSlope Boschert Progress 10 10-2011

1,382 views

Published on

A short slide show of job-site progress pictures from the Boschert Greenway Trail and the building of a new SmartSlope Living Retaining Wall. http://www.thelivingwallco.com

Published in: Education, Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,382
On SlideShare
0
From Embeds
0
Number of Embeds
846
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

SmartSlope Boschert Progress 10 10-2011

  1. 1. Ideal Landscape Group Starts the SmartSlope Wall at Boschert Greenway Trail for Great Rivers Greenway.<br />Check out our Website @ SmartSlope.com <br />
  2. 2. Wall area is excavated, footing is marked and then dug out – ready for base rock.<br />
  3. 3. Base rock is placed, leveled and compacted – ready for SmartSlope modules in the morning!<br />Visit Our Website @ smartslope.com for more information<br />

×