Linear Scheduling Method LSM
Definition
 A simple diagram to show location and
 time at which a certain crew will be
 working on a given operation.




                                         1
Characteristics
 Shows repetitive nature of the
  construction.
 Progression of work can be seen easily.
 Sequence of different work activities can be
  easily understood .
 Have fairly high level of detail.
 Can be developed and prepared in a
  shorter time period than other formats.

                                                 2
LSM Schedule


                           s
 4                       nd
                   e
                       F                       Slab
 3            v at                     nds   &
           ca                       PF
         Ex                    F&                         e
 2                                                    Fram
 1

     2        4   6       8 10 12 14 16 18 20 22 24




                                                              3
Advantages of LSM
In certain types of projects:
   Provides more information than a bar
    chart.
   Offers advantages over network diagram.




                                              4
Line of Balance Technique
   LSM has relationships to the line of
    balance (LOB) technique, developed by
    US. Navy in the early 1950s.
   First applied to industrial manufacturing
    and production control.




                                                5
Three diagrams are used in LOB:
 1. Production Diagram
    Shows the relationships of the assembly operations
    for a single unit. Similar to AOA, except that it shows
    only one unit of production.
 2. Objective Diagram
    Used to plot the planned or actual number of units
    produced vs. time. LSM diagram resembles this
    diagram.
 3. Progress Diagram
    Shows the number of units for which each of the
    sub-assembly operations has been completed.
                                                              6
Difference between Objective Diagram
and LSM :
 Objective Diagram is used to schedule or
  record the cumulative events of unit
  completion.
 LSM is used to plan or record progress
  on multiple activities that are moving
  continuously in sequence along the length
  of a single project.



                                              7
Implementation of LSM
   Can be used to continuous activities rather
    than discrete activities.
   Linear: Transportation projects; highway
    const., highway resurfacing and maintenance,
    airport runway const. and resurfacing, tunnels,
    mass transit systems, pipelines, railroads.
   High-rise building construction
   Repetitive building units

                                                      8
Elements of the LSM
 Axis Parameters
 Location
 Measure of progress.
 In high-rises and housing const., measures
  may be stories, floors, subdivisions,
  apartments, housing units
 In Transportation projects, distance (ft. or
  mile can be used, but division by stations
  (100ft.) is common) is general.

                                                 9
Time
   Hours, days, week, or month - depends on
    the total project time and level of detail
    desired in the schedule.
   Preferable to prepare the schedule based
    on working days and convert to calendar
    days only at the end.



                                               10
Activity Production Rates
 Obtained by the usual estimating
  methods as a function of the activity,
  equip. characteristics, labor, and job
  conditions.
 The initial rate should be associated with
  the min. direct cost of accomplishing the
  single activity.



                                               11
Activity Interruption and Restraint
      Prod. rate may vary with locations or
       time periods.
      Progress may be interrupted intentionally
       and restraints may occur between
       activities due to limited equip. or crews.




                                                    12
Buffers
   When const. activities progress
    continuously in a chain, some spacing
    between activities is required.
   This spacing serves as a buffer and may be
    required distance or time interval
    between activities.



                                             13
Activity Intervals
   Used to describe the period of time between the
    start and finish of an activity at a particular
    location.
   Intervals can be indicated by broad line, two
    narrow lines, etc.
   Monitoring Progress
   Working or calendar can be marked with a
    moving symbol or a line, tape, etc. vertically
    across the diagram.
   Progress on individual activities would be marked
    by location rather than time.
                                                        14
1. Project Time Optimization
   The total project time may be such that
    indirect costs and liquidated damages
    assessed are more costly than the
    expense of accelerating certain activities.
   Cost-duration analysis can be used to
    minimize the total cost, as follows :



                                                  15
a) Identify all activities that can be accelerated or
  decelerated.
b) Among the above, consider only those that are at a buffer
  limitation at both the start and the finish of the activity.
c) Of these, select the one activity with the lowest cost
  slope associated with acceleration (or deceleration).
d) Accelerate (or deceleration) the activity rate of
  production the maximum feasible amount.
e) Repeat the above steps successively until the optimum
  project cost and associated duration is obtained.


                                                                 16
2. Discrete Activities
 Discrete are best scheduled by other
 methods. Once the duration is determined
 by network analysis, it can be scheduled on
 the LSM diagram and coordinated with the
 linear activities.

3. Seasonal Adjustments
 When developing LSM, appropriate
 adjustments can be made for seasonal
 effect on construction progress.
                                               17
4. Project Progress and Resource
  Management
   Project progress is often estimated by the
    S-curve when bar chart development.
   In LSM, the determination of activity
    progress is facilitated and made more
    rigorous.



                                                 18
Four-unit Duplex I-J Fragnets
 2          7            8
 EXC FNDS   F&P FNDS     FRAME
 BLDG 1     & SLAB       BLDG 1
            BLDG 1

              2            7          8
              EXC FNDS     F&P FNDS   FRAME
              BLDG 2       & SLAB     BLDG 2
                           BLDG 2

                           2          7          8
                           EXC FNDS   F&P FNDS   FRAME
                           BLDG 3     & SLAB     BLDG 3
                                      BLDG 3

                                      2          7
                                      EXC FNDS   F&P FNDS
                                      BLDG 4     & SLAB
                                                 BLDG 4




                                                            19
Bar-chart vs Linear Scheduling




                                 20
5000




4000

                                       Time Buffer


3000




                        Space Buffer
2000




1000




       5           10            15    20            25   30       35




           Space buffer = how many meters separated (pick a day)

           Time buffer = how many days separated (pick a location)

                                                                        21
5000


                                  Client in
                                  town for
                                   4 days
4000




3000




2000




1000




       5   10       15       20               25   30   35




           Curtain = Showing important event



                                                             22
LSM Schedule


                                                              These lines are
  Duplex Number

                  4                                           actually different
                                                    ns
                                                 io
                  3
                                            d at
                                          un
                  2                     Fo
                                t   e
                  1       a  va
                         c
                      Ex
                             2          4      6         8 10 12 14 16 18
                                                          Days




                                                                                   23
LSM Schedule
 Duplex Number

                 4
                                                ns
                                           t io                          b
                 3
                                         da                         & Sla
                                        n                       s
                 2                   ou                    ation
                               e
                                   F
                                                    Fo und
                           t
                 1      va
                        a                F&P
                     Exc
                         2          4     6          8 10 12 14 16 18
                                                      Days




                                                                             24
2 NW

FORM 17/7               2 NE
REBAR 19/7
SETUP 25/7            FORM 19/7
                      REBAR 21/7
POUR 26/7             SETUP 27/7
                      POUR 28/7
             2 SW       2 SE

         FORM 25/7    FORM 21/7
         REBAR 27/7   REBAR 25/7
         SETUP 1/8    SETUP 31/7
          POUR 2/8     POUR 1/8


GRAPHIC PRODUCTION SCHEDULE
– ELEVATED FLOOR SLAB
                                   25
AHU COMPONENTS




                                     EXHAUST FAN


                                                     RETURN FAN


                                                                  SUPPLY FAN
                             AIR




                                                                                  PIPING
EQUIPMENT PLANNED PLANNED
                          HANDLING
 LOCATION START FINISHED
                            UNIT


                           AHU 101
  MER 1    8-Jun   7-Jul
                           AHU 102

                           AHU 201
  MER 3    6-Jun   4-Jul
                           AHU 202

                                                                               O I
                                                                               R C
 PRODUCTION SCHEDULING                                                         O ORDER
 – MATRIX SCHEDULE                                                             R RECEIVE
                                                                               I INSTALL
                                                                               C CHECK-OUT   26
AHEAD OF
                                      PLANNED
TOTAL
                                      SCHEDULE
EXCAVATION
(CU.METER)


      30000              AHEAD OF
                         PLANNED
                         PRODUCTION
      25000

      20000

      15000

      10000

       5000



                          MAY


              PRODUCTION SCHEDULING
              – VELOCITY DIAGRAM                 27

More Related Content

What's hot

Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSHafiz JUNAID
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingSHAZEBALIKHAN1
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateSHAZEBALIKHAN1
 
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptChapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptssuserb4074f
 
Line of Balance
Line of BalanceLine of Balance
Line of BalanceIJMER
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Fundamentals of scheduling
Fundamentals of schedulingFundamentals of scheduling
Fundamentals of schedulingjmd2011
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture) Muhammad Aljalali
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering fieldswetha110
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 

What's hot (20)

Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Bar chart
Bar chartBar chart
Bar chart
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
Lean Construction Management
Lean Construction Management Lean Construction Management
Lean Construction Management
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
All About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel TemplateAll About Construction Labour Planning- Excel Template
All About Construction Labour Planning- Excel Template
 
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.pptChapter 3 Construction Planning and Scheduling lect. 3.ppt
Chapter 3 Construction Planning and Scheduling lect. 3.ppt
 
Line of Balance
Line of BalanceLine of Balance
Line of Balance
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Fundamentals of scheduling
Fundamentals of schedulingFundamentals of scheduling
Fundamentals of scheduling
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering field
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 

Similar to Linear scheduling LSM

Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project managementRahul Dubey
 
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-FlopIRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-FlopIRJET Journal
 
IRJET- High Speed Multi-Rate Approach based Adaptive Filter using Multiplier-...
IRJET- High Speed Multi-Rate Approach based Adaptive Filter using Multiplier-...IRJET- High Speed Multi-Rate Approach based Adaptive Filter using Multiplier-...
IRJET- High Speed Multi-Rate Approach based Adaptive Filter using Multiplier-...IRJET Journal
 
Planning & Scheduling - Training
Planning & Scheduling - TrainingPlanning & Scheduling - Training
Planning & Scheduling - TrainingMohammed Feroze
 
As-built Programmes - Part 2
As-built Programmes - Part 2As-built Programmes - Part 2
As-built Programmes - Part 2David Greig
 
Utilizing Linear Planning and Scheduling for Project Control and Claims Avoid...
Utilizing Linear Planning and Scheduling for Project Control and Claims Avoid...Utilizing Linear Planning and Scheduling for Project Control and Claims Avoid...
Utilizing Linear Planning and Scheduling for Project Control and Claims Avoid...Lorne Duncan
 
Crash course on data streaming (with examples using Apache Flink)
Crash course on data streaming (with examples using Apache Flink)Crash course on data streaming (with examples using Apache Flink)
Crash course on data streaming (with examples using Apache Flink)Vincenzo Gulisano
 
Lec 09 network scheduling_techniques
Lec 09 network scheduling_techniquesLec 09 network scheduling_techniques
Lec 09 network scheduling_techniquesSAJID ALI RUK
 
IRJET- An Improved DCM-Based Tunable True Random Number Generator for Xilinx ...
IRJET- An Improved DCM-Based Tunable True Random Number Generator for Xilinx ...IRJET- An Improved DCM-Based Tunable True Random Number Generator for Xilinx ...
IRJET- An Improved DCM-Based Tunable True Random Number Generator for Xilinx ...IRJET Journal
 
Schedule_Module_V.10.ppt
Schedule_Module_V.10.pptSchedule_Module_V.10.ppt
Schedule_Module_V.10.pptssusere57332
 
IRJET- Implementation of Reversible Radix-2 FFT VLSI Architecture using P...
IRJET-  	  Implementation of Reversible Radix-2 FFT VLSI Architecture using P...IRJET-  	  Implementation of Reversible Radix-2 FFT VLSI Architecture using P...
IRJET- Implementation of Reversible Radix-2 FFT VLSI Architecture using P...IRJET Journal
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxTecnicoItca
 
Traffic Light Controller Using Fpga
Traffic Light Controller Using FpgaTraffic Light Controller Using Fpga
Traffic Light Controller Using FpgaIJERA Editor
 
Basics CPM&PERT.ppt
Basics CPM&PERT.pptBasics CPM&PERT.ppt
Basics CPM&PERT.pptssuserad50d3
 

Similar to Linear scheduling LSM (20)

Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
Cpmprt
CpmprtCpmprt
Cpmprt
 
Pert and CPM
Pert and CPMPert and CPM
Pert and CPM
 
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-FlopIRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
 
IRJET- High Speed Multi-Rate Approach based Adaptive Filter using Multiplier-...
IRJET- High Speed Multi-Rate Approach based Adaptive Filter using Multiplier-...IRJET- High Speed Multi-Rate Approach based Adaptive Filter using Multiplier-...
IRJET- High Speed Multi-Rate Approach based Adaptive Filter using Multiplier-...
 
Planning & Scheduling - Training
Planning & Scheduling - TrainingPlanning & Scheduling - Training
Planning & Scheduling - Training
 
Ch5 repetitive
Ch5 repetitiveCh5 repetitive
Ch5 repetitive
 
As-built Programmes - Part 2
As-built Programmes - Part 2As-built Programmes - Part 2
As-built Programmes - Part 2
 
Network analysis & cpm
Network analysis & cpmNetwork analysis & cpm
Network analysis & cpm
 
Paper
PaperPaper
Paper
 
Utilizing Linear Planning and Scheduling for Project Control and Claims Avoid...
Utilizing Linear Planning and Scheduling for Project Control and Claims Avoid...Utilizing Linear Planning and Scheduling for Project Control and Claims Avoid...
Utilizing Linear Planning and Scheduling for Project Control and Claims Avoid...
 
Crash course on data streaming (with examples using Apache Flink)
Crash course on data streaming (with examples using Apache Flink)Crash course on data streaming (with examples using Apache Flink)
Crash course on data streaming (with examples using Apache Flink)
 
Lec 09 network scheduling_techniques
Lec 09 network scheduling_techniquesLec 09 network scheduling_techniques
Lec 09 network scheduling_techniques
 
Lc3519051910
Lc3519051910Lc3519051910
Lc3519051910
 
IRJET- An Improved DCM-Based Tunable True Random Number Generator for Xilinx ...
IRJET- An Improved DCM-Based Tunable True Random Number Generator for Xilinx ...IRJET- An Improved DCM-Based Tunable True Random Number Generator for Xilinx ...
IRJET- An Improved DCM-Based Tunable True Random Number Generator for Xilinx ...
 
Schedule_Module_V.10.ppt
Schedule_Module_V.10.pptSchedule_Module_V.10.ppt
Schedule_Module_V.10.ppt
 
IRJET- Implementation of Reversible Radix-2 FFT VLSI Architecture using P...
IRJET-  	  Implementation of Reversible Radix-2 FFT VLSI Architecture using P...IRJET-  	  Implementation of Reversible Radix-2 FFT VLSI Architecture using P...
IRJET- Implementation of Reversible Radix-2 FFT VLSI Architecture using P...
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptx
 
Traffic Light Controller Using Fpga
Traffic Light Controller Using FpgaTraffic Light Controller Using Fpga
Traffic Light Controller Using Fpga
 
Basics CPM&PERT.ppt
Basics CPM&PERT.pptBasics CPM&PERT.ppt
Basics CPM&PERT.ppt
 

More from Shaiful Amri Mansur (7)

L4
L4L4
L4
 
L3
L3L3
L3
 
L2
L2L2
L2
 
Resource management
Resource managementResource management
Resource management
 
Precedence Diagramming Method PDM
Precedence Diagramming Method PDMPrecedence Diagramming Method PDM
Precedence Diagramming Method PDM
 
Cpm & network diagrams
Cpm & network diagramsCpm & network diagrams
Cpm & network diagrams
 
SAB4113 Intro to Planning & Scheduling
SAB4113 Intro to Planning & SchedulingSAB4113 Intro to Planning & Scheduling
SAB4113 Intro to Planning & Scheduling
 

Recently uploaded

Quality Assurance_GOOD LABORATORY PRACTICE
Quality Assurance_GOOD LABORATORY PRACTICEQuality Assurance_GOOD LABORATORY PRACTICE
Quality Assurance_GOOD LABORATORY PRACTICESayali Powar
 
How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17Celine George
 
KARNAADA.pptx made by - saransh dwivedi ( SD ) - SHALAKYA TANTRA - ENT - 4...
KARNAADA.pptx  made by -  saransh dwivedi ( SD ) -  SHALAKYA TANTRA - ENT - 4...KARNAADA.pptx  made by -  saransh dwivedi ( SD ) -  SHALAKYA TANTRA - ENT - 4...
KARNAADA.pptx made by - saransh dwivedi ( SD ) - SHALAKYA TANTRA - ENT - 4...M56BOOKSTORE PRODUCT/SERVICE
 
Over the counter (OTC)- Sale, rational use.pptx
Over the counter (OTC)- Sale, rational use.pptxOver the counter (OTC)- Sale, rational use.pptx
Over the counter (OTC)- Sale, rational use.pptxraviapr7
 
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...Dr. Asif Anas
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxheathfieldcps1
 
EBUS5423 Data Analytics and Reporting Bl
EBUS5423 Data Analytics and Reporting BlEBUS5423 Data Analytics and Reporting Bl
EBUS5423 Data Analytics and Reporting BlDr. Bruce A. Johnson
 
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...Nguyen Thanh Tu Collection
 
A gentle introduction to Artificial Intelligence
A gentle introduction to Artificial IntelligenceA gentle introduction to Artificial Intelligence
A gentle introduction to Artificial IntelligenceApostolos Syropoulos
 
How to Solve Singleton Error in the Odoo 17
How to Solve Singleton Error in the  Odoo 17How to Solve Singleton Error in the  Odoo 17
How to Solve Singleton Error in the Odoo 17Celine George
 
In - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxIn - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxAditiChauhan701637
 
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfP4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfYu Kanazawa / Osaka University
 
ARTICULAR DISC OF TEMPOROMANDIBULAR JOINT
ARTICULAR DISC OF TEMPOROMANDIBULAR JOINTARTICULAR DISC OF TEMPOROMANDIBULAR JOINT
ARTICULAR DISC OF TEMPOROMANDIBULAR JOINTDR. SNEHA NAIR
 
Diploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfDiploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfMohonDas
 
How to Send Emails From Odoo 17 Using Code
How to Send Emails From Odoo 17 Using CodeHow to Send Emails From Odoo 17 Using Code
How to Send Emails From Odoo 17 Using CodeCeline George
 
Protein Structure - threading Protein modelling pptx
Protein Structure - threading Protein modelling pptxProtein Structure - threading Protein modelling pptx
Protein Structure - threading Protein modelling pptxvidhisharma994099
 
Vani Magazine - Quarterly Magazine of Seshadripuram Educational Trust
Vani Magazine - Quarterly Magazine of Seshadripuram Educational TrustVani Magazine - Quarterly Magazine of Seshadripuram Educational Trust
Vani Magazine - Quarterly Magazine of Seshadripuram Educational TrustSavipriya Raghavendra
 
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptxSOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptxSyedNadeemGillANi
 
Department of Health Compounder Question ‍Solution 2022.pdf
Department of Health Compounder Question ‍Solution 2022.pdfDepartment of Health Compounder Question ‍Solution 2022.pdf
Department of Health Compounder Question ‍Solution 2022.pdfMohonDas
 

Recently uploaded (20)

March 2024 Directors Meeting, Division of Student Affairs and Academic Support
March 2024 Directors Meeting, Division of Student Affairs and Academic SupportMarch 2024 Directors Meeting, Division of Student Affairs and Academic Support
March 2024 Directors Meeting, Division of Student Affairs and Academic Support
 
Quality Assurance_GOOD LABORATORY PRACTICE
Quality Assurance_GOOD LABORATORY PRACTICEQuality Assurance_GOOD LABORATORY PRACTICE
Quality Assurance_GOOD LABORATORY PRACTICE
 
How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17How to Add a New Field in Existing Kanban View in Odoo 17
How to Add a New Field in Existing Kanban View in Odoo 17
 
KARNAADA.pptx made by - saransh dwivedi ( SD ) - SHALAKYA TANTRA - ENT - 4...
KARNAADA.pptx  made by -  saransh dwivedi ( SD ) -  SHALAKYA TANTRA - ENT - 4...KARNAADA.pptx  made by -  saransh dwivedi ( SD ) -  SHALAKYA TANTRA - ENT - 4...
KARNAADA.pptx made by - saransh dwivedi ( SD ) - SHALAKYA TANTRA - ENT - 4...
 
Over the counter (OTC)- Sale, rational use.pptx
Over the counter (OTC)- Sale, rational use.pptxOver the counter (OTC)- Sale, rational use.pptx
Over the counter (OTC)- Sale, rational use.pptx
 
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
Unveiling the Intricacies of Leishmania donovani: Structure, Life Cycle, Path...
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptx
 
EBUS5423 Data Analytics and Reporting Bl
EBUS5423 Data Analytics and Reporting BlEBUS5423 Data Analytics and Reporting Bl
EBUS5423 Data Analytics and Reporting Bl
 
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
 
A gentle introduction to Artificial Intelligence
A gentle introduction to Artificial IntelligenceA gentle introduction to Artificial Intelligence
A gentle introduction to Artificial Intelligence
 
How to Solve Singleton Error in the Odoo 17
How to Solve Singleton Error in the  Odoo 17How to Solve Singleton Error in the  Odoo 17
How to Solve Singleton Error in the Odoo 17
 
In - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxIn - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptx
 
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdfP4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
P4C x ELT = P4ELT: Its Theoretical Background (Kanazawa, 2024 March).pdf
 
ARTICULAR DISC OF TEMPOROMANDIBULAR JOINT
ARTICULAR DISC OF TEMPOROMANDIBULAR JOINTARTICULAR DISC OF TEMPOROMANDIBULAR JOINT
ARTICULAR DISC OF TEMPOROMANDIBULAR JOINT
 
Diploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdfDiploma in Nursing Admission Test Question Solution 2023.pdf
Diploma in Nursing Admission Test Question Solution 2023.pdf
 
How to Send Emails From Odoo 17 Using Code
How to Send Emails From Odoo 17 Using CodeHow to Send Emails From Odoo 17 Using Code
How to Send Emails From Odoo 17 Using Code
 
Protein Structure - threading Protein modelling pptx
Protein Structure - threading Protein modelling pptxProtein Structure - threading Protein modelling pptx
Protein Structure - threading Protein modelling pptx
 
Vani Magazine - Quarterly Magazine of Seshadripuram Educational Trust
Vani Magazine - Quarterly Magazine of Seshadripuram Educational TrustVani Magazine - Quarterly Magazine of Seshadripuram Educational Trust
Vani Magazine - Quarterly Magazine of Seshadripuram Educational Trust
 
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptxSOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
 
Department of Health Compounder Question ‍Solution 2022.pdf
Department of Health Compounder Question ‍Solution 2022.pdfDepartment of Health Compounder Question ‍Solution 2022.pdf
Department of Health Compounder Question ‍Solution 2022.pdf
 

Linear scheduling LSM

  • 1. Linear Scheduling Method LSM Definition A simple diagram to show location and time at which a certain crew will be working on a given operation. 1
  • 2. Characteristics  Shows repetitive nature of the construction.  Progression of work can be seen easily.  Sequence of different work activities can be easily understood .  Have fairly high level of detail.  Can be developed and prepared in a shorter time period than other formats. 2
  • 3. LSM Schedule s 4 nd e F Slab 3 v at nds & ca PF Ex F& e 2 Fram 1 2 4 6 8 10 12 14 16 18 20 22 24 3
  • 4. Advantages of LSM In certain types of projects:  Provides more information than a bar chart.  Offers advantages over network diagram. 4
  • 5. Line of Balance Technique  LSM has relationships to the line of balance (LOB) technique, developed by US. Navy in the early 1950s.  First applied to industrial manufacturing and production control. 5
  • 6. Three diagrams are used in LOB: 1. Production Diagram Shows the relationships of the assembly operations for a single unit. Similar to AOA, except that it shows only one unit of production. 2. Objective Diagram Used to plot the planned or actual number of units produced vs. time. LSM diagram resembles this diagram. 3. Progress Diagram Shows the number of units for which each of the sub-assembly operations has been completed. 6
  • 7. Difference between Objective Diagram and LSM :  Objective Diagram is used to schedule or record the cumulative events of unit completion.  LSM is used to plan or record progress on multiple activities that are moving continuously in sequence along the length of a single project. 7
  • 8. Implementation of LSM  Can be used to continuous activities rather than discrete activities.  Linear: Transportation projects; highway const., highway resurfacing and maintenance, airport runway const. and resurfacing, tunnels, mass transit systems, pipelines, railroads.  High-rise building construction  Repetitive building units 8
  • 9. Elements of the LSM  Axis Parameters  Location  Measure of progress.  In high-rises and housing const., measures may be stories, floors, subdivisions, apartments, housing units  In Transportation projects, distance (ft. or mile can be used, but division by stations (100ft.) is common) is general. 9
  • 10. Time  Hours, days, week, or month - depends on the total project time and level of detail desired in the schedule.  Preferable to prepare the schedule based on working days and convert to calendar days only at the end. 10
  • 11. Activity Production Rates  Obtained by the usual estimating methods as a function of the activity, equip. characteristics, labor, and job conditions.  The initial rate should be associated with the min. direct cost of accomplishing the single activity. 11
  • 12. Activity Interruption and Restraint  Prod. rate may vary with locations or time periods.  Progress may be interrupted intentionally and restraints may occur between activities due to limited equip. or crews. 12
  • 13. Buffers  When const. activities progress continuously in a chain, some spacing between activities is required.  This spacing serves as a buffer and may be required distance or time interval between activities. 13
  • 14. Activity Intervals  Used to describe the period of time between the start and finish of an activity at a particular location.  Intervals can be indicated by broad line, two narrow lines, etc.  Monitoring Progress  Working or calendar can be marked with a moving symbol or a line, tape, etc. vertically across the diagram.  Progress on individual activities would be marked by location rather than time. 14
  • 15. 1. Project Time Optimization  The total project time may be such that indirect costs and liquidated damages assessed are more costly than the expense of accelerating certain activities.  Cost-duration analysis can be used to minimize the total cost, as follows : 15
  • 16. a) Identify all activities that can be accelerated or decelerated. b) Among the above, consider only those that are at a buffer limitation at both the start and the finish of the activity. c) Of these, select the one activity with the lowest cost slope associated with acceleration (or deceleration). d) Accelerate (or deceleration) the activity rate of production the maximum feasible amount. e) Repeat the above steps successively until the optimum project cost and associated duration is obtained. 16
  • 17. 2. Discrete Activities Discrete are best scheduled by other methods. Once the duration is determined by network analysis, it can be scheduled on the LSM diagram and coordinated with the linear activities. 3. Seasonal Adjustments When developing LSM, appropriate adjustments can be made for seasonal effect on construction progress. 17
  • 18. 4. Project Progress and Resource Management  Project progress is often estimated by the S-curve when bar chart development.  In LSM, the determination of activity progress is facilitated and made more rigorous. 18
  • 19. Four-unit Duplex I-J Fragnets 2 7 8 EXC FNDS F&P FNDS FRAME BLDG 1 & SLAB BLDG 1 BLDG 1 2 7 8 EXC FNDS F&P FNDS FRAME BLDG 2 & SLAB BLDG 2 BLDG 2 2 7 8 EXC FNDS F&P FNDS FRAME BLDG 3 & SLAB BLDG 3 BLDG 3 2 7 EXC FNDS F&P FNDS BLDG 4 & SLAB BLDG 4 19
  • 20. Bar-chart vs Linear Scheduling 20
  • 21. 5000 4000 Time Buffer 3000 Space Buffer 2000 1000 5 10 15 20 25 30 35 Space buffer = how many meters separated (pick a day) Time buffer = how many days separated (pick a location) 21
  • 22. 5000 Client in town for 4 days 4000 3000 2000 1000 5 10 15 20 25 30 35 Curtain = Showing important event 22
  • 23. LSM Schedule These lines are Duplex Number 4 actually different ns io 3 d at un 2 Fo t e 1 a va c Ex 2 4 6 8 10 12 14 16 18 Days 23
  • 24. LSM Schedule Duplex Number 4 ns t io b 3 da & Sla n s 2 ou ation e F Fo und t 1 va a F&P Exc 2 4 6 8 10 12 14 16 18 Days 24
  • 25. 2 NW FORM 17/7 2 NE REBAR 19/7 SETUP 25/7 FORM 19/7 REBAR 21/7 POUR 26/7 SETUP 27/7 POUR 28/7 2 SW 2 SE FORM 25/7 FORM 21/7 REBAR 27/7 REBAR 25/7 SETUP 1/8 SETUP 31/7 POUR 2/8 POUR 1/8 GRAPHIC PRODUCTION SCHEDULE – ELEVATED FLOOR SLAB 25
  • 26. AHU COMPONENTS EXHAUST FAN RETURN FAN SUPPLY FAN AIR PIPING EQUIPMENT PLANNED PLANNED HANDLING LOCATION START FINISHED UNIT AHU 101 MER 1 8-Jun 7-Jul AHU 102 AHU 201 MER 3 6-Jun 4-Jul AHU 202 O I R C PRODUCTION SCHEDULING O ORDER – MATRIX SCHEDULE R RECEIVE I INSTALL C CHECK-OUT 26
  • 27. AHEAD OF PLANNED TOTAL SCHEDULE EXCAVATION (CU.METER) 30000 AHEAD OF PLANNED PRODUCTION 25000 20000 15000 10000 5000 MAY PRODUCTION SCHEDULING – VELOCITY DIAGRAM 27