Published on

A case study on how Agile was used successfully within a PRINCE2 project for roll out of a finance solution. It shows the benefits of an Agile approach, and how it was managed within the PRINCE2 …

A case study on how Agile was used successfully within a PRINCE2 project for roll out of a finance solution. It shows the benefits of an Agile approach, and how it was managed within the PRINCE2 method. Presented as a case study at the Project Challenge masterclass, Antony della Porta is one of the most experienced consultants in Agile Project Management, and is an accredited PRINCE2 and Agile trainer.

For more information on the presentation or to use the materials please email learning@trainingbytesize.com

Published in: Education, Business, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
661
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
20
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Project Challenge 2013 Presentation by Antony Della Porta Lead Trainer Training Byte Size Ltd PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 2. Agile Project Management and PRINCE2® In Projects Agile Project Management and PRINCE2® In Projects Case Study on Using AgilePM in a PRINCE2 Project This presentation will be taking a look at a project where “Agile Project Management” and PRINCE2 methods of project delivery were successfully employed together. The project was for the delivery a new bandwidth usage protocol configuration onto a Bank’s National Network to enable Application bandwidth prioritization usage as the new applications, and hence teller system, was being moved to Java functionality.
  • 3. Presenter Antony C. Della Porta • Over 25 years experience of working in project delivery, rescue and consultancy roles • Major verticals such as Finance, Travel, Media and Pharmaceuticals. • Established trainer in delivering courses in Project Management methodologies, and courses relevant to the delivery and realisation of business strategy. • Started using PRINCE2®, in earnest, over 14 years ago, along with Agile Project management • Successfully managed and implemented a number of PRINCE2® -AgilePM projects • APMG accredited and member of Institute of Consultants PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 4. Training ByteSize Specialists in Project and Programme Management Training • Training Bytesize Ltd is the largest provider of multi-lingual online bespoke project management training courses in English, German, Polish, French, Spanish and Arabic. • APMG accredited Courses that offer a really interactive way to learn, using audio, animation, interactive exercises and exam simulators. • The team is one of the most experienced in the Project and Programme industry and have been responsible for developing courses used by over 5,000 companies worldwide • Specialists in developing e-learning for the fastest growing project management qualifications • International presence in the UK, Germany, Poland, Denmark, Australia, USA PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 5. Agile Project Management and PRINCE2® In Projects Introduction to Relationship between PRINCE2 and AgilePM methodologies • The following slide will show a graphic view of the correlation of processes in PRINCE2 and the Phases employed by Atern Agile Project Management • AgilePM established with PRINCE2 • Correlation of the Processes/Stages to Phases/Increments • Relationship of plans and lifecycles PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 6. Process Overview of PRINCE2 and AgilePM Key: AgilePM; PRINCE2® PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 7. The Project A Bank Network Upgrade • • • • • • • Part of bank teller system replacement programme to employ Java based applications Network to introduce QoS (Quality of Service) banding – Gold for high demand applications (40% b/w) – Silver for general demand applications (next 30%) – Bronze – backoffice applications (20% b/w) QoS was a new concept indicating that the required solution to Prioritize traffic would have to evolve Scope was two years old so requirements would have to be reviewed as well as equipment Proof of Concept (PoC)facilities no longer available from the incoming Telco (Optus)so alternative had to be sourced PoC was allocated one (1) month to complete defining, testing and piloting the Gold, Silver and, as Could, Bronze. Estimates for Effort would be broad as new functionality and no known active solution for this type of network PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 8. The Project Plan • Initial Project Start Up employing PRINCE2® as the primary methodology • Stage 1- (P2) Initiating a Project used to setup and review Project in detail • Stage 2 - (P2) Redefine current scope, Pre Project phase for Stage 3, Tenders for Integrators • Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st Pilot • Stage 4 – (APM-P2) Refine Technical solution (Pilot feedback), 1st Pilot - Engage Integrator • Stage 5 – (APM-P2) Refine Technical solution (Pilot feedback), 2nd Pilot - Plan National Roll-Out • Stage 6 – (P2) First group of Retail Banks for Live Upgrade • Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 9. SU and Stages 1-2 – PRINCE2 – High Level • Initial Project Start Up employing PRINCE2® as the primary methodology • Stage 1- (P2) Initiating a Project used to setup and review Project in detail • Stage 2 - (P2) Seek Integrators and Hardware requirements PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 10. SU and Stages 1-2 – PRINCE2 - Detail • Starting Up a Project: document and sign-off Project Brief and Approach - Use a hybrid of methodology using PRINCE2 and Agile • Initiating a Project: Usual IP activities and preparing Stage 2 , planning the project to engage both delivery approaches: Agile for the PoC and PRINCE2 for the main rollout and overall Organisation and governance mapping for Roles and Responsibilities • Stage 2 o Review current scope (2 years old at this point) o Define resource requirements (original Proof of Concept facilities no longer valid) o Define Approach for PoC delivery (AgilePM) for Stage 3 o Plan Stage 3 - AgilePM Feasibility/Foundations and then move into first Development Phase (Exploration and Engineering Timeboxes) PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 11. Stage 3 – AgilePM managed Increment (P2 stage) HighLevel • Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st and 2nd Pilots to check initial design PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 12. Stage 3 – AgilePM Development Phase • • • • Use Feasibility/Foundations to define and prioritize the requirements to be delivered over how many increments. Approach was to build the “Gold” application configuration requirements during the 1st increment and deploy into the 1st Pilot Feedback on the 1st Pilot (HeadOffice branch) was fed back to 2nd Timebox for further refinement 2nd Pilot used for checking Telco configurations and hence full “Gold” function PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 13. Stage 4 – Joint AgilePM and PRINCE2 • Agile: Refine Technical solution (Pilot feedback), 2nd Pilot • PRINCE2: Engage Integrator, Preparations for Hardware builds and configuration PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 14. Stage 4 - PRINCE2 managed stage – AgilePM Develop solution Agile: • Refine Technical solution for Gold using Pilot feedback (1st Pilot) • Commence development of configurations for Silver and Bronze • Deploy Silver and Bronze solutions and commence 2nd Pilot PRINCE2 • Engage Integrator • Start planning the roll-out stages 6 and 7 with Integrator • Define and order hardware requirements PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 15. Stage 5 - PRINCE2 managed stage – AgilePM - Develop solution • AgilePM - Refine Technical solution (Pilot feedback), 2nd Pilot • PRINCE2 - Plan National Roll-Out in detail PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 16. Stage 5 - PRINCE2 managed stage – AgilePM Develop solution AgilePM • Timeboxes under this Development Increment used to • Refine Silver and Bronze applications • Develop other requirements (including any dropped from earlier Timeboxes) • Complete Pilot stage and sign-off developed solution now ready for Deployment and hand back to PRINCE2 PRINCE2 • Finalize plans for 1st Stage roll-out in Stage 6 • Ensure resources in place and hardware (replacement network) preconfigured PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 17. Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out • Stage 6 – (P2) First group of Retail Banks for Live Upgrade • Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 18. Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out • Stage 6 - Upgrade the first 20 Branches spread nationally: 5 a night 4 nights • Stage 7 – On successful completion of Stage 6 and sign-off, follow rest of the Roll-out plan and upgrade the remaining 345 Nation-wide branches • Post Project – Agile to monitor the success of the Bandwidth Prioritization Stage 7 Stage 6 Controlling a Stage MP Work Packag e1 S t a g e B o u n d a r y Controlling a Stage MP C l o s i n g P r o j e c t Work Packag e1 Post Project PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 19. Summary of Presentation • PRINCE2 and Atern AgilePM can be used to deliver projects of varying delivery requirements and needs • Most projects are probably in reality managed this way • There are some direct correlations between the processes/phases of both methodologies • Not necessary to marry these up directly, more important to know and understand how each can be best employed for each project PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 20. Contact Details Antony della Porta - Training Byte Size Ltd Mobile: +44 7533 240 675 Office: +44 (0)1270 653111 Email: antony@trainingbytesize.com The Dowery, 22 Barker Street, Nantwich, Cheshire CW5 5TE PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 21. Any Questions on the implementation of Agile Project Management or how to use Agile PM in a PRINCE2 environment please contact us for further information +44 (0)1270 653111 learning@trainingbytesize.com PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.