Camac smart installation

237 views
211 views

Published on

scaffold hoist to save money on scaffold erection

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
237
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Camac smart installation

  1. 1. CAMAC SMART installation
  2. 2. We mustintroduce theCAMACSMART in thescaffold orplacing thescaffoldingaround theSMART .
  3. 3. Level the firstmast. It is veryimportant foravoidingerectionproblems
  4. 4. Fix the first mastto the scaffoldusing theanchorage.
  5. 5. Install the wire-winder next to the base.We should give 7 rounds for getting tensionon the inside springs. Afterwards connectthe cable to the machine.
  6. 6. Connect the hand control to themachine. It will be used only forinstallation process.
  7. 7. Assemble the second mast, use the screws to fix it. Use the hand control to lift the machine when you need it.
  8. 8. Before start up the CAMAC SMARTcheck that all switches are not activeor pressed. Top limit switch Safety switch Bottom limit switch Floor switch
  9. 9. Follow the erection by assembling more mastsand one anchorage every 3 meters.
  10. 10. Anchorages are fixed on the mast using this plate. Floor stop. Can be fixed anywhere on the mast.Its used for fixing the stop positions according the scaffold levels.

×