Telecom ArgentinaData Centers           Confidential & Proprietary
Contents• Brief about Telecom Argentina• Telecom Argentina Datacenters• Connectivity• Certifications• Datacenter in Pachec...
Brief About Telecom Argentina• Telecom Argentina S.A. counts since 1990 with a  license to provide Basic Telephone as well...
Telecom Argentina Fixed Telephone Lines        DATACENTER              Mobile Lines              INTERNET • 4.3 millions  ...
Our DatacentersPacheco            EstombaBosque Alegre      Córdoba Oeste
Certifications                  • ISO 9001. DetNor Veritas                  • SAS 70 Type II.                  • “A” 4609 ...
Initial Project•Five datacenters in different cities was theinitial project of Holder Construction. Onlythree were execute...
A project design in three phases                 Phase 1                           Phase 2                                ...
Data Center Overview               • Located over a major highway, 21miles from downtown               • 10 acres campus  ...
Datacenter Design                                                               Biometric Access                          ...
INFRASTRUCTURE     Raised Floor
Fault Tolerant Electrical System•   Electrical system includes MV switchgear with two utilities feed active.•   Three 2000...
INFRASTRUCTURE      Generators
INFRASTRUCTURETwo Active Power Lines
INFRASTRUCTURE           LSG
INFRASTRUCTURE        Batteries
INFRASTRUCTURE     UPS Systems
Cooling System  • The system is based on cooling 1,4 millions gallons of treated    water to five degrees centigrades ever...
INFRASTRUCTURE         Chillers
INFRASTRUCTURE  Condenser Units
Management and Protection System• Management Systems have all the necessary functions to support  daily operations at our ...
Non Stop System      SECURITY              ELECTRIC            ENVIRONMENT                  IT                  NETWORKBu...
Conclusions• World Class Technology Data Center Infrastructure with more than 80,000  square feet for Customers Data Proce...
Upcoming SlideShare
Loading in …5
×

Telecom argentina datacenters

558 views
459 views

Published on

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
558
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
23
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Telecom argentina datacenters

  1. 1. Telecom ArgentinaData Centers Confidential & Proprietary
  2. 2. Contents• Brief about Telecom Argentina• Telecom Argentina Datacenters• Connectivity• Certifications• Datacenter in Pacheco• Conclusions Confidential & Proprietary
  3. 3. Brief About Telecom Argentina• Telecom Argentina S.A. counts since 1990 with a license to provide Basic Telephone as well as Mobile, Data and Internet Services in Argentina.• Operations started on November 8th, 1990 when the company was privatized.• We also provide Value Added Services such as Computer Outsourcing and Datacenter Services to businesses in Argentina and other countries.
  4. 4. Telecom Argentina Fixed Telephone Lines DATACENTER Mobile Lines INTERNET • 4.3 millions • 80,000 square feet • 12.5 millions mobile • 1.2 millions telephone lines capacity. subscribers customers • Leader in IT • 4 Datacenter. • Leader in • Leaders in innovation. • Datacenter Pacheco innovations Broadband. • New development • Pioneers in GSM, on the network 3G, BA Móvil, involving voice, video Blackberry, Video call an data.RA LA SEGURIDAD INVIERTE EN EDUCACION 4
  5. 5. Our DatacentersPacheco EstombaBosque Alegre Córdoba Oeste
  6. 6. Certifications • ISO 9001. DetNor Veritas • SAS 70 Type II. • “A” 4609 - BCRA • ISO 27001. Confidential & Proprietary
  7. 7. Initial Project•Five datacenters in different cities was theinitial project of Holder Construction. Onlythree were executed.•Holder Construction Company is the worldindustry leader in Data Center construction.Experience on over 90 data center projects inlast 10 years•Ellerbe Becket in charged of the designed isone of the most respected architecture,interiors, engineering and construction firms inthe world.•Constructora Sudamericana was in charge ofexecuting the project in 8 months.•Datacenter opened for customers on March12th 2001.
  8. 8. A project design in three phases Phase 1 Phase 2 Phase 3
  9. 9. Data Center Overview • Located over a major highway, 21miles from downtown • 10 acres campus • 112,000 square feet; “concrete vault” design • 60,000 ft2 finished raised floor • Actual Level of Occupancy: 50% • approved for expansion in the initial project • High availability (99,99%) • System redundancy, no single point of failure • Neutral Policy for Telecommunication links in Datacenter • Best operative and management practices Confidential & Proprietary 9
  10. 10. Datacenter Design Biometric Access and Exit Sensors Seismically-braced Continuous Video Server Racks Surveillance Electronic Motion Sensors UPS Backup Generators Security Breach Redundant Alarms HVAC Controlled Environment On-premises Suppression System Security Officers Server Operations Monitoring
  11. 11. INFRASTRUCTURE Raised Floor
  12. 12. Fault Tolerant Electrical System• Electrical system includes MV switchgear with two utilities feed active.• Three 2000 KVA Generators. Two ups and one on stand by• Six 800KVA UPS system Cabinet. Two systems ups systems and a redundant ups system.• The system is designed to expand to 75 watts per square foot. The initial load is based on 33 watts per square foot.• One 500KVA Life Safety Generator• One 3000 KW Load Bank• Static Transfer Switches• Power Distribution Units• Satellite Distribution Units
  13. 13. INFRASTRUCTURE Generators
  14. 14. INFRASTRUCTURETwo Active Power Lines
  15. 15. INFRASTRUCTURE LSG
  16. 16. INFRASTRUCTURE Batteries
  17. 17. INFRASTRUCTURE UPS Systems
  18. 18. Cooling System • The system is based on cooling 1,4 millions gallons of treated water to five degrees centigrades every night. The water is used to control the temperature. • The system includes: • Three 675 Ton Chiller Units • Fifty four Modular Cooling Units • Three 675 Ton cooling tower units • Five Air handlers units Efficiency is our concerns to protect the environment.
  19. 19. INFRASTRUCTURE Chillers
  20. 20. INFRASTRUCTURE Condenser Units
  21. 21. Management and Protection System• Management Systems have all the necessary functions to support daily operations at our Data Center.• Our control systems includes Fire Protection, Early Detection System, Lighting Controls, and building maintenance control system, as well as redundancy of the HVAC controls.• We also have and an Advanced Security Systems and trained guards with more that 100 Cameras for surveillance, Day Night Pan Cameras, DVR, Infrared and Automatic Detection of intruders.• All Networks and equipments are constantly monitored to act immediately in case of hardware o software failure.• Every devices is monitored to detect any DDoS (Distributed Denial of Service) attack from the internet.
  22. 22. Non Stop System SECURITY ELECTRIC ENVIRONMENT IT NETWORKBuilding is precast Two separate Motion, smoke, fire Over 60,000 sq ft High performance, concrete; set back substations detectors throughout finished raised floor dedicated OCN 50 to 70 ft. from backbone Multiple UPS Customer cages wall First and second systems – 2+1 and private vaults Robust gigabit LAN stage fireGuarded gate and layout, 800 KVA architecture suppression systems Managed services foyer access; 7x24 modules include Carrier neutral198 security Diesel generators – Computer monitored interconnection and controlled  Hardware cameras, biometric (3) 1,825 KW Prime point for local, hand readers Rated temperature &  Operating long-haul and humidity Systems internationalSecurity zones use Expandable Load networks alarm and card-key Density: 75 Chilled water stored  Applications access; all entries watts/ft2 Key vendors: on site for more  Storage logged Cisco, Juniper and Fuel Oil Storage efficient cooling  Security ExtremeMantrap controlling Tanks: 48 hour access to data supply @ 100% Private wells to  Monitoring & center area secure against failure Reporting to municipal water supply Confidential & Proprietary 22
  23. 23. Conclusions• World Class Technology Data Center Infrastructure with more than 80,000 square feet for Customers Data Processing available.• Exceptional technical expertise.• High performance Connectivity Services with availability throughout the country and internationally. Multi network links available• Process-based operation based on certifications.• 15 years of experience in the telecommunications industry.• Achieve benefits of scale economies and talents• Flexibility and Scalability• Providing an ideal platform for managing regional IT infrastructure 23

×