Your SlideShare is downloading. ×
Tharisa platinum mine expansion project 2012
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Tharisa platinum mine expansion project 2012

366
views

Published on

Fibre installation

Fibre installation


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
366
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1.  As Tharisa Mine is the largest known single chrome resource deposit in the world, the Group is well positioned to benefit from the projected growth in demand for chrome, which is primarily used in stainless steel manufacturing. MDM Engineering contracted AGE Technologies to supply in all the requirements of the Tharisa Expansion project. Age’s scope of supply included:  Supply of all Siemens PLC hardware (S7-300 & S7-400)  Supply of all Siemens SCADA software (WinCC)  RIO Panel supply & manufacturing (34 panels)  Ethernet & Profibus fiber network installation, splicing, testing, certification and drawings (Est. 6000m fiber and 900 splices)  Supply, installation, configuration and commissioning of 4x Wireless Ethernet radios that links to 4x pump stations (4IPNET Radios)  2x Commissioning engineers to assist with I/O  testing & process commissioning (I/O count 1546)  General supply of cable, junction boxes & any other equipment needed throughout the project  Configuration of all networks running through OLM’s and the setup of the OLM’s Scope of work to be done  Fiber Network  Installation of fiber cable.  Installation of splice boxes.  Installation of patch leads  Supply IPDB’s  Installation of a profibus over fiber network
  • 2.  Product used in the project  Multi core Instrument cable to the value of R400,000.00  Siemens OLM  Outdoor Fibre cable (total of 18.7kms)  Network Switches (3 port & 6 port)  All fiber equipment inc. adapters, connectors, pigtails & cable Total value of the project upon completion  5.9 million Duration of the project  8 months