Your SlideShare is downloading. ×
Matimba Power Station
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Matimba Power Station

296

Published on

Matimba Power Station

Matimba Power Station

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
296
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1.   Overview AEG's construction division were awarded the  project to design, supply and install such a  system to provide plant alarm status, monitoring  and reporting. This was repeat business for AEG  who also executed the station MV switchgear  project and the overland Ash Handling conveyor  systems.   The project was carried out during the transition  period from AEG to AGE Engineering and was  completed ahead of the prescribed contract  period.  Duration of project The 12‐month contract, which comprised 64  man‐months effort, included the full project  management, PLC engineering using a Modicon 'A' series PLC, full equipment supply, installation  and commissioning.   www.age.co.za ESKOM identified the need for the replacement  of the coal stacker/ reclaimer control system at  their dry cooled power station near Ellisras in the  Northern province.   Significant feature  of this project  was the design, by one of AGE's engineers,  of unique connection terminals ‐ housed in the PLC cabinet ‐ which comprised full  lightning protection on all inputs and outputs.   This type of terminal has now become a standard  in the electrical industry AGE Technologies JHB 50 Charl Cilliers Ave, Alberton North, 1456 Tel: +27 11 869 3925/6/7 Fax: +27 11 869 6427

×