Arcelor Mittal

162 views
101 views

Published on

Arcelor Mittal

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
162
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Arcelor Mittal

  1. 1.   Scope of work to be done  Was the equipment supply and product training of  Modicon Quantum PLC's and FactoryLink SCADA.   However, the whole project was to be executed  during a planned shutdown period and required  careful planning in order to minimise disruption at  the changeover.  Products used The PLC was programmed in hot stand‐by  configuration and it was decided to make use of  standard terminal cabling in order to facilitate a  smoother transition.  www.age.co.za AGE Technologies JHB (Pty) Ltd. secured the contract  to assist Arcelor Mittal’s planning department with  the design, project management and commissioning  of the automation system required at the  Vanderbijlpark works Continuous Casting plant.  Duration of the project The project was five months in preparation and  comprised 3 man‐months effort in execution.  AGE Technologies JHB 50 Charl Cilliers Ave, Alberton North, 1456 Tel: +27 11 869 3925/6/7 Fax: +27 11 869 6427

×