• Save
Agile Grammelot 2.0
Upcoming SlideShare
Loading in...5
×
 

Agile Grammelot 2.0

on

  • 185 views

The Agile Grammelot workshop @ MiniIAD Trento on July, 2014

The Agile Grammelot workshop @ MiniIAD Trento on July, 2014

Statistics

Views

Total Views
185
Views on SlideShare
180
Embed Views
5

Actions

Likes
2
Downloads
0
Comments
0

1 Embed 5

https://www.linkedin.com 5

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

CC Attribution-NonCommercial-ShareAlike LicenseCC Attribution-NonCommercial-ShareAlike LicenseCC Attribution-NonCommercial-ShareAlike License

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Agile Grammelot 2.0 Agile Grammelot 2.0 Presentation Transcript

    • In preparing for battle I have always found that plans are useless, but planning is indispensable. ! — Dwight D. Eisenhower (1890–1969) AGILE GRAMMELOT
    • @marcocalzolari CERTIFIED AGILE SOMETHING™ @giovannipuliti CERTIFIED AGILE SOMETHING™
    • Improvisation is the most scientific skill on Earth. But improvisation is really only half the story. The other half is that you need to have a machine inside.“ Dario Fo Italian actor-playwright, comedian, singer, theatre director, stage designer, songwriter and political campaigner... ! Deserved the 1997 ” WhyGrammelot
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT The workshop structure 3 Phases Presentations
 Energy
 Setting Up the Game 1. SETTING THE STAGE Team Work
 Agile Practices
 A metaphor for working on projects 2. THE GAME Feeling analysis
 What’s happened analysis
 Key concepts 3. RETROSPECTIVE
    • SETTINGTHESTAGE First Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT Prepare your badge SETTINGTHESTAGE First Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT Jack says: “move and balance on the raft” SETTINGTHESTAGE First Act
    • THEGAME Second Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT Description of the game ! The customer – Grammelot Airlines – needs improve some services of the company THEGAME Second Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT The Rules - Time Organization The game takes place in some iterations. ! Each iteration (lasting 10') is made of • Presentation and requirements gathering - 3’ • Implementation - 4’ • Demo/review - 3’ THEGAME Second Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT The Rules - Material Management ! • The teams will use the material found in the store. • The material taken from the store cannot be returned. • At the end of each iteration, for any material that remain on the work table, the team will receive a negative score. THEGAME Second Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT The Rules - Team Composition ! • A chief of products (Product Owner) • At least one wharehouse manager • The development team THEGAME Second Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT The Rules - Interaction ! • Only the PO can go to the customer to receive the specification and to show the demo THEGAME Second Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT The Rules ! • These, and only these, are the rules THEGAME Second Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT Iteration 1 THEGAME Second Act 10’
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT THEGAME Second Act OUR STRATEGIC MARKETING ANALYSIS CONSULTANT LIFESTYLER
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT Iteration 2 THEGAME Second Act 10’
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT Iteration 3 THEGAME Second Act 10’
    • THERETROSPECTIVE Third Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT THERETROSPECTIVE Third Act TAKING AERIAL PHOTOGRAPH
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT LIFTOFF AND LANDING ON WATER THERETROSPECTIVE Third Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT THERETROSPECTIVE Third Act GOING GREEN
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT ! How do you feel? ! What are your feelings? THERETROSPECTIVE Third Act
    • AGILEGRAMMELOT MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco Calzolari What about the audience? ! What did you see? ! What did you perceive as important? THERETROSPECTIVE Third Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT insights on SOME KEY concepts ! key concept - Communication THERETROSPECTIVE Third Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT insights on SOME KEY concepts ! key concept - Team Organization THERETROSPECTIVE Third Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT insights on SOME KEY concepts ! key concept - Requirements ! THERETROSPECTIVE Third Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT insights on SOME KEY concepts ! key concept - Deep and Broad Approach ! ! ! THERETROSPECTIVE Third Act
    • MINI AGILE DAY @ TECHPEAKS 2014 / Giovanni Puliti / Marco CalzolariAGILEGRAMMELOT insights on SOME KEY concepts ! key concept - Setting the stage activities ! ! ! THERETROSPECTIVE Third Act
    • Thank You @marcocalzolari marco@agilereloaded.it @giovannipuliti giovanni@agilereloaded.it