Relocity Corporate Presentation 2010

1,136 views
1,090 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,136
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • ©
  • ©
  • ©
  • ©
  • ©
  • ©
  • Relocity Corporate Presentation 2010

    1. 1. THE PULSE IN YOUR BUILDINGS Built Environment Support Services
    2. 2. <ul><li>Incorporated 2004 to deliver </li></ul><ul><ul><li>Built environment support services </li></ul></ul><ul><li>Operate UK-wide </li></ul><ul><ul><li>Developing MENA operation </li></ul></ul><ul><li>55 Engineering staff :- </li></ul><ul><ul><li>Project management </li></ul></ul><ul><ul><li>Multi-disciplined FM and IT service delivery </li></ul></ul><ul><ul><li>Security-cleared staff </li></ul></ul><ul><ul><li>World-class compliance in H&S, Quality and Environmental processes & procedures </li></ul></ul>Relocity Corporate History
    3. 3. Relocity’s expertise is delivering integrated workplace & facilities solutions to Government, military and commercial clients. The business focuses upon technically sophisticated projects which combine both FM and IT disciplines frequently in security-cleared environments. Relocity deliver projects, responsive works and consultancy support to multi-site occupiers and major FM companies. Activities include :- • Technical property surveys & occupation space accountancy   • Connectivity for voice, power & data networks   • Mechanical & electrical installations including HVAC   • Corporate interiors & office furnishing   • Refurbishment, dilapidations & decoration   • Move management & relocation services Relocity’s accreditations include ISO9001, ISO14001, Safe Contractor, Constructionline, Considerate Contractor, CHAS, Exor, Link-up and Achillies. The Pulse in your Buildings
    4. 4. Building and Facilities Life-Cycle Contingency Planning Furniture, Fixtures & Equipment Bid and life-cycle costing Space & Occupancy Strategic accommodation Planning Design engineering Building Infrastructure design On-site & mobile teams Property consultancy Cost consultancy Specification & procurement 2 nd stage fit-out & refurbishment Defects Liabilities Operations & maintenance Fit-out Design & Build Site Handover Responsive Repairs Planned Preventative Maintenance
    5. 5. <ul><li>UK Ministry of Defence </li></ul><ul><li>(Military facilities) </li></ul><ul><li>British Airports Authority </li></ul><ul><li>(Airports) </li></ul><ul><li>Heathrow Express </li></ul><ul><li>(Rail) </li></ul><ul><li>UK Home Office estate (Commercial) </li></ul><ul><li>Transport for London (Infrastructure) </li></ul><ul><li>London Metropolitan Police </li></ul><ul><li>(IT & Communications) </li></ul><ul><li>University of Greenwich, London (Education) </li></ul><ul><li>Boeing </li></ul><ul><li>(Defence & military) </li></ul><ul><li>Kendle </li></ul><ul><li>(Heathcare & Pharmaceutical) </li></ul><ul><li>QinetiQ </li></ul><ul><li>(Military) </li></ul>Operational sectors
    6. 6. <ul><li>Design, installation and commissioning of a new Fibre Optic CCTV system for NATO facility </li></ul><ul><li>New pit and Duct routes across the entire site. </li></ul><ul><li>Installation of 100% redundant fibre optic ring. </li></ul><ul><li>Implementation of site wide CCTV over fibre optic conversion. </li></ul><ul><li>All works carried out with complete SCIDA approval to JSP 440 and 480. </li></ul><ul><li>Approximately 10,000m of OM3 fibre installed across the site. </li></ul>NATO – CCTV installation
    7. 7. <ul><li>Design and fit-out new operational facility for 250 staff </li></ul><ul><li>De-cant staff into temporary facilities to ensure 24-hour operation </li></ul><ul><li>Accommodation include mess & shower facilities, a/c, new IT </li></ul><ul><li>Fast-track 3-week project with 24-hour operation </li></ul>Birmingham Highways – Operational hub
    8. 8. <ul><li>Space accountancy consultancy design project </li></ul><ul><li>8-building, 27,000 SqFt facility delivering 34,000 training days PA </li></ul><ul><li>Re-design proposal saved 27% of occupied space </li></ul><ul><li>Re-design allowed £Million in saved life-cycle maintenance costs </li></ul>Aspire Defence – Strategic planning
    9. 9. <ul><li>Design & Build of mission-critical communications rooms. </li></ul><ul><li>Cross site fibre optic links at 26 RAF bases. </li></ul><ul><li>Installation of horizontal Category 5e cabling at 26 RAF bases. </li></ul><ul><li>Small power distribution. </li></ul><ul><li>Office furnishing and data presentation to 400 workstations. </li></ul>Ministry of Defence Contract
    10. 10. <ul><li>Responsive repairs and maintenance contract to Heathrow Express, Terminals 4 & 5 </li></ul><ul><li>Full range Mechanical & Electrical, Fabric repairs and project work </li></ul><ul><li>Projects include digital advertising displays, LED lighting, ticket counter design and build </li></ul>London Heathrow Airport
    11. 11. <ul><li>Design & installation of infrastructure for state of the art real time global defence simulator. </li></ul><ul><li>Utilised cutting edge copper and Blolite Blown fibre. </li></ul><ul><li>Installation carried out under laboratory conditions throughout. </li></ul><ul><li>All works carried out with complete SCIDA approval to JSP 440 and 480. </li></ul>QinetiQ – Boeing Warfare Simulator
    12. 12. Projects
    13. 13. Relocity Cherry Studios Greenhills Estate Tilford Surrey GU10 2DZ UK T: +44 1252 795 550 F: +44 1252 795 525 E: info@relocity.co.uk WWW.RELOCITY.CO.UK Contact us
    14. 14. THE PULSE IN YOUR BUILDINGS

    ×