Your SlideShare is downloading. ×
Kesco turnaround
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Kesco turnaround

127
views

Published on

kanpur electricity supply company turn around plan

kanpur electricity supply company turn around plan

Published in: Business, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
127
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Manoj Jhawar, MBA 2nd year IIT Kanpur,2013
  • 2.  Distribution losses 40% to 25%  Increase metered connections from 3lac to 5lac  Cut manpower from 10k to 8k  Improve profit from 50 Cr to 200Cr  Halved the no. of B/D and complaints
  • 3. Increasing operational and technical efficiency by increasing sub stations, capacitor replacement, R&M of transformers, service connection improvement, IT enabling including substation automation, construction of new sub-stations, construction of new lines, bifurcation of feeders, etc  E.g. 7 existing transmission substation of 220 KV and 132 KV to 12 transmission substation.  Upgradation and strengthening of sub-transmission and distribution network (below 33kV or 66kV)  GOI initiative-Restructured Accelerate Power Development Reform Programme (R-APDRP) under 12th plan to bring down distribution losses to 15 per cent by implementing projects within 18 to 24 months 
  • 4. Call center – Rewarded & Awareness campaign  E.g.Voters 165000 in Naubasta Sub Div but paying Consumer is less than 10000  Illegal connections to be converted into metered ones  Joins Home& Shop concept to be separated using individual commercial and domestic connection  Multi Floors Building- one connection but many consumers  Theft-
  • 5.  Outsourcing non essential works such as cleaning, IT maintenance and some other works such as Transformer & electrical line related  Automation of various service such as intensive computerization of HR, Accounts, Technical, etc  VRS to some employees
  • 6.  Reduce power theft will add to profit  Reduced Distribution losses will add to profit  Electronic tamper proof meter will be installed  In Kanpur, revenue realisation is Rs 1.68 per unit and it would be brought to Rs 2.37 per unit  Increase tariff rate- Peak time tariff, peak season tariff  Arrear settlement for existing Consumers arrear having >25000.
  • 7.      Invest in Power enhancement capacity Buy power from power Exchange if unable to meet demand Improve customer care & relationship- By adopting best practice in power industry and resolving complain within 2hr for minor & transformer replacement within 6 hrs Multi or Single AC eg swaroop nagar Improving Maintenance of Meters & transformers