Your SlideShare is downloading. ×
My Home Vihanga Status Report as on 20.12.2013
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

My Home Vihanga Status Report as on 20.12.2013

873
views

Published on

My Home Vihanga Status Report as on 20.12.2013

My Home Vihanga Status Report as on 20.12.2013


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
873
On Slideshare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Project Progress – 20 Dec 2013 th
  • 2. TOP VIEW
  • 3. SOUTH SIDE RETAINING WALL IN PROGRESS
  • 4. SOUTH SIDE VIEW TIE BEAMS DONE & COLUMN STARTERS ABOVE TIE BEAM IN PROGRESS
  • 5. WEST SIDE VIEW
  • 6. WESTSIDE RETAINING WALL WORK IN PROGRESS
  • 7. TOP VIEW
  • 8. SOUTH SIDE VIEW STUB COLUMNS IN PROGRESS
  • 9. STUB COLUMNS IN PROGRESS
  • 10. NORTH SIDE VIEW
  • 11. NORTH –EAST VIEW
  • 12. BLOCKS EXCAVATION PODIUM AREA UNDER PROGRESS
  • 13. HT & LT YARD ERECTION & INSPECTION COMPLETED CHARGING TO BE DONE
  • 14. BATCHING PLANT-2 FOUNDATION IN PROGRESS