• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Accomplishments
 

Accomplishments

on

  • 1,038 views

 

Statistics

Views

Total Views
1,038
Views on SlideShare
1,038
Embed Views
0

Actions

Likes
1
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Accomplishments Accomplishments Presentation Transcript

    • Maiad Salama Senior Cost & Planning Engineer Curriculum Vitae 2010
    • Table of Content 1. Personal Details 2. Career Objective 3. Skills (Technical, Organizational & Social) 4. Education 5. Training 6. Job History 7. Accomplishments
    • Career Objective • Seeking a challenging opportunity in the field of Oil & Gas Project Engineering, where by my academic background, experience and interpersonal skills can be applied and further developed.
    • Skills My Skills Technical Organizational Social
    • Skills - Technical (Planning) Define & Organize Define & Organize Plan Plan Track & Manage Track & Manage 1. Establish the 1. Establish the 1. Develop project 1. Develop project 1. Collect status. 1. Collect status. project project WBS. WBS. 2. Plan & take 2. Plan & take organization. organization. 2. Develop project 2. Develop project adaptive action. adaptive action. 2. Define project 2. Define project Schedule. Schedule. 3. Close out the 3. Close out the parameters. parameters. 3. Analyze 3. Analyze project. project. 3. Plan the project 3. Plan the project recourses. recourses. framework. framework. Generate better data for decision making.
    • Skills - Technical (Computer) Microsoft Primavera Graphics Others 1. Windows. 1. Primavera 1. Adobe 1. AutoCAD. 2. Microsoft 2. PertMaster Photoshop. 2. SAP Office. 2. Visio. 3. Microsoft Project.
    • Skills - Organizational Corporate Employability 1. Information management. 1. Communication. 2. Organization and control. 2. Team working. 3. Team building. 3. Leadership. 4. Strategic awareness. 4. Initiative. 5. Understanding funding streams 5. Problem solving. and mechanisms. 6. Flexibility. 6. Communication and persuasion. 7. Enthusiasm. 7. Networking and public relations. 8. Honesty. 8. Leading change. 9. Personal integrity. 9. Standing up to and for the 10.Self starter. 10.Self project Leader. 11.Good personal appearance. 11.Good 12.Common sense. 12.Common
    • Skills - Social Emotional Life Community intelligence 1. Manage and think. 1. Accepting differences. 1. Emotional self-awareness. self- 2. Making wise use of 2. Conflict resolution. 2. Accurate self-assessment. self- resources. 3. Cooperation. 3. Self-confidence. Self- 3. Planning/organizing and 4. Communication. 4. Self-control. Self- goal setting. 5. Sharing. 5. Trustworthiness. 4. Managerial functions. 6. Concern for others. 6. Achievement drive. 5. Critical thinking. 7. Volunteering. 7. Empathy. 6. Problem solving. 8. Leadership. 8. Service orientation. 7. Decision making. 9. Contributions to group 9. Developing others. 8. Learning to learn. effort 10.Change catalyst 10.Change 11.Building bonds. 11.Building
    • Skills - Social
    • Skills - Social Working Thinking Targeting Giving Life Skills Managing Caring
    • Education June 1991 June 1991 May 1996 May 1996 May 1999-May 2000 May 1999-May 2000 1. Mechanical Engineering 1. Mechanical Engineering (Power), Thermal (Power), Thermal 1. One preparatory year for 1. One preparatory year for 1. High school. 1. High school. engineering, Internal engineering, Internal the M. Sc. Degree. the M. Sc. Degree. 2. Pre-University 2. Pre- Pre-University combustion, Renewable combustion, Renewable 2. Materials Science 2. Materials Science education (Primary, education (Primary, energy, Turbo machines, energy, Turbo machines, (courses in: failure (courses in: failure Prep., Secondary). Prep., Secondary). Refrigeration, Air- Refrigeration, Air- Air- analysis, testing of analysis, testing of 3. Holy Family School 3. Holy Family School conditioning. conditioning. materials, physical materials, physical (Collage de la Sainte (Collage de la Sainte 2. Faculty of Engineering, 2. Faculty of Engineering, metallurgy and welding). metallurgy and welding). Famille) Famille) Higher Technological Higher Technological 3. Faculty of Engineering, 3. Faculty of Engineering, Institute. Institute. Cairo University Cairo University 3. Grade: Very Good, (GPA: 3. Grade: Very Good, (GPA: 3.22 (Hon.) out of 4) 3.22 (Hon.) out of 4)
    • Training - Planning & Mgt. 16/1/00 --1/2/00 16/1/00 1/2/00 8/2/05 --9/4/05 8/2/05 9/4/05 23/7/06 --27/7/06 23/7/06 27/7/06 13/8/06 --17/8/06 13/8/06 17/8/06 Planning and Planning and Project Management Project Management Planning & Planning & Primavera Primavera Scheduling with Scheduling with Methodology & Methodology & Controlling with Controlling with Enterprise -- Enterprise Primavera Project Primavera Project Techniques (IPMA Techniques (IPMA Primavera Primavera Advanced Advanced Planner. Co-design, Planner. Co- Co-design, Preparation Course), Preparation Course), Enterprise. Enterprise. Topics. Topics. Cairo, Egypt. Cairo, Egypt. the American the American Promastar, Promastar, Promastar, Promastar, University in Cairo University in Cairo Cairo, Egypt. Cairo, Egypt. Cairo, Egypt. Cairo, Egypt. (AUC). (AUC). Cairo, Egypt. Cairo, Egypt.
    • Training - Planning & Mgt. IPMA Web Site – certificate # 174
    • Training - Planning & Mgt.
    • Training - Planning & Mgt.
    • Training – Leadership
    • Training - Technical 18/4/99 --29/4/99 18/4/99 29/4/99 27/11/99 --02/12/99 27/11/99 02/12/99 10/1/03 --20/1/03 10/1/03 20/1/03 18/3/2003 18/3/2003 Comprehensive Comprehensive welding course welding course Valve Selection, Valve Selection, A/C applications A/C applications Load Analysis Load Analysis leading to become a leading to become a Installation, and Installation, and and design, Al- and design, Al- Al- Calculation, Calculation, certified certified Maintenance. Cairo, Maintenance. Cairo, Zamil Factory. Zamil Factory. Carrier. Carrier. Radiographic Radiographic Egypt. Egypt. Khobar, Saudi Khobar, Saudi Khobar, Saudi Khobar, Saudi Testing Examiner Testing Examiner Arabia. Arabia. Arabia. Arabia. Level (II). Cairo, Level (II). Cairo, Egypt. Egypt.
    • Training - Technical 02/6/95 -- 30/9/95 02/6/95 30/9/95 •• Oil storage tanks design according to API 650 // Oil storage tanks design according to API 650 Pressure Vessels according to BS 5000, (Profabril Profabril Pressure Vessels according to BS 5000, ((Profabril Centro De Projectos), Lisbon, Portugal. Centro De Projectos), Lisbon, Portugal. Projectos), Introduced to the followings: Introduced to the followings: 1. Welding symbols (ISO, A.W.S., DIN) & weld design 1. Welding symbols (ISO, A.W.S., DIN) & weld design and Materials. and Materials. 2. Design of storage tanks (API STD 650). 2. Design of storage tanks (API STD 650). 3. Design of pressure vessels (BS 5500). 3. Design of pressure vessels (BS 5500). 4. Quality assurance based design for welded 4. Quality assurance based design for welded construction. construction.
    • Job History 1998 1998 2000 2000 2001 2001 2002 2002 2004 2004 2007 2007 Khalda Khalda Petroleum Petroleum Khalda Khalda Qantara Qantara Khalda Khalda Saudi Saudi Petroleum Petroleum Development Development Petroleum Petroleum Petroleum Petroleum Petroleum Petroleum Aircon Aircon Company Company Oman Oman Company Company Company Company Company Company Snr. Cost & Snr. Cost & Senior Senior Planning Planning Planning Planning Planning Planning Planning Planning Planning Planning Planning Planning Engineer Engineer Engineer Engineer Engineer Engineer Engineer Engineer Engineer Engineer Engineer Engineer
    • Accomplishments Cost Description Completion $MM Develop the Amal field in South of Oman Amal Steam Development Project and increase the recovery factor through 2014 1,149 EOR processes. Qasr Gas Developing the Qasr Gas field in the Development Project Western Desert of Egypt. 2008 279 To transfer 150 MMscfd through 18” 18” Southern Gas 18” 18” buried gas pipeline, 217 Km length, from Pipeline Project Salam field to Abul Gharadig gas plant 2000 55 crossing Qattara Depression. Western Desert Gas Construct three gas plants at Salam, Development Project Tarek, and South Umbarka Fields. 1999 260
    • Accomplishments Qasr Gas Development Project • Owner: Khalda Petroleum Co. • Contract Type: Unit rate • Contractor: JPK / Petrojet • Project Description: Development of Qasr Field with total capacity of 350 MMscfd.
    • Accomplishments Qasr Gas Development Project - Overall Schematic Diagram Obayied Facilities Obayied receiver Obayie Slug catcher d Export gas meter Gas Tarek Facilities Export condensate meter 18", 40KM Plant 110MMscfd Oily water treatment unit X-60, sch. 60 WT Tarek receiver Inlet gas heater KPC 19.05 mm Slug catcher Inlet liquid heater Obayied Piping tie-in 3 phase separator Facilities Gas heater Glycol regeneration 240MMscfd LP gas meter Flare Package Flare gas meter Tarek Flare gas KO drum Shams Manifold Tie-in 18", 60KM Gas Plant Mercury removal packages Tie-in skid Control room X-60, sch. 60 Qasr receiver Shams Tarek launcher WT 19.05 mm Facility Obayied launcher Corrosion / Hydrate inhibitor packages Qasr Field Flowlines 24", 40KM Qasr 2 Qasr 6 Qasr 3 Qasr 10 X-60, sch. 80 Qasr 4 Qasr 11 Qasr WT 30.96 mm Qasr 5 Qasr 12 Facility Qasr Facilities Q2 350MMscfd 1.075 km Wellhead skids Qasr launcher Q3 Gathering system (duplex flowlines) 1.050 km Manifold system Q5 Air coolers 2.30 km Power generation / Switchgear Q6 3.92 km Corrosion / Hydrate inhibitor packages Q12 Test separator 3.48 km Q11 Fuel gas conditioning 2.43 km 3 phase separator TEG package (optional) Control room Flare Package
    • Accomplishments Qasr Gas Development Project – Appreciation Certificate
    • Accomplishments Qasr Gas Development Project
    • Accomplishments Qasr Gas Development Project – Qasr site during construction
    • Accomplishments Qasr Gas Development Project – follow up manufacturing of equipment
    • Accomplishments Qasr Gas Development Project – delivery of equipment 0
    • Accomplishments Qasr Gas Development Project – Qasr site during construction
    • Accomplishments Qasr Gas Development Project – Obayied site during construction
    • Accomplishments 18″ Southern Gas Pipeline Project • Owner: Khalda Petroleum Co. • Contract Type: EPC • Contractor: PLE / Petrojet • Project Description: To transfer 150 MMscfd through 18” buried gas pipeline, 217 Km length, from Salam field to Abul Gharadig gas plant crossing Qattara Depression.
    • Accomplishments 18″ Southern Gas Pipeline Project – during construction
    • Accomplishments Western Desert Gas Development Project • Owner: Khalda Petroleum Co. • Contract Type: EPC • Contractor: Samsung / Enppi / Petrojet • Project Description: Construct three gas plants at Salam, Tarek, and South Umbarka Fields, (temporary contribution).