Professional Career Resume
Upcoming SlideShare
Loading in...5
×
 

Professional Career Resume

on

  • 414 views

PROFESSIONAL CAREER RESUME

PROFESSIONAL CAREER RESUME

Statistics

Views

Total Views
414
Views on SlideShare
412
Embed Views
2

Actions

Likes
1
Downloads
1
Comments
0

1 Embed 2

http://www.linkedin.com 2

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Professional Career Resume Professional Career Resume Document Transcript

  • MANUEL SUAREZ INGENIERO INDUSTRIAL (MEng INDUSTRIAL ENGINEER)PROFESSIONAL CAREER RESUME
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUMEContentsINTRODUCTION ................................................................................................................. 3 INGENIERO INDUSTRIAL ............................................................................................... 3 INGENIERO INDUSTRIAL STUDIES .............................................................................. 4MAIN QUALIFICATIONS ..................................................................................................... 5TRAINING............................................................................................................................ 5MAIN WORK EXPERIENCE ................................................................................................ 6 WORK EXPERIENCE DETAILS ...................................................................................... 6 Project Manager ........................................................................................................... 6 MEP Engineer (Building Services Engineer) ................................................................ 6 Health & Safety Engineer ............................................................................................. 7PROJECT MANAGER ACTIVITIES..................................................................................... 8MEP ENGINEER ACTIVITIES ........................................................................................... 24HEALTH & SAFETY ENGINEER ACTIVITIES .................................................................. 39 2
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUMEINTRODUCTIONINGENIERO INDUSTRIALIngeniero Industrial is a six year degree largely multidisciplinary, with an importanttheoretical basis and a strong structural, mechanical and electrical background, as well asan industrial organisation specialization.The main tasks carried out by an Ingeniero Industrial (Industrial Engineer) can be: Industrial Organisation Residential and Civil Constructions Energy management Industrial Maintenance Environmental, Health and Safety management Electrical, thermal and hydraulic installations Gas and Compressed air installations Quality management Waste management Expert appraisals, evaluations and reports 3
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUMEINGENIERO INDUSTRIAL STUDIES Credits Credits Subject Name Terms Subject Name Terms Theoretical Practical Total Theoretical Practical Total LINEAR ALGEBRA Annual 9 6 15 MICROECONOMICS Annual 6 6 12 FOURTH COURSE CALCULUS I Annual 12 6 18 INDUSTRIAL ORGANIZATION I Annual 6 6 12 COURSE FIRST PHYSICS I Annual 12 6 18 MACROECONOMICS Annual 12 0 12 TECHNICAL DRAWING I Annual 6 6 12 ELECTRONICS Annual 9 6 15 CHEMISTRY I Annual 9 3 12 MATHEMATICAL METHODS Annual 7,50 1,50 9 MATERIALS ENGINEERING Annual 4,50 4,50 9 CALCULUS II Annual 9 3 12 INDUSTRIAL HEAT&COLD Annual 4,50 4,50 9 DIFFERENTIAL EQUATIONS Annual 9 3 12 SECOND COURSE CHEMISTRY II Annual 9 6 15 INDUSTRIAL ORGANIZATION II Annual 4,50 4,50 9 THERMODYNAMICS Annual 7,50 4,50 12 PRODUCTION MANAGEMENT I Annual 4,50 4,50 9 TECHNICAL DRAWING II Annual 4 5 9 BUSINESS ADMINISTRATION I Annual 3 3 6 FIFTH COURSE MECHANICS Annual 9 6 15 HUMAN RESOURCES ORGANIZATION Annual 4,50 4,50 9 AUTOMATION Annual 6 3 9 STATISTICS I Annual 6 6 12 MECHANICAL TECHNOLOGY Annual 6 6 12 PHYSICS II Annual 9 3 12 STATISTICS II Annual 5 1 6 THIRD COURSE STRUCTURAL ANALYSIS Annual 7 8 15 ENVIRONMENTAL ENGINEERING Annual 4,50 1,50 6 ELECTROTECNIA Annual 9 6 15 ELECTRICAL MACHINES Annual 4,50 4,50 9 METALOTECNIA Annual 4,50 4,50 9 FLUID MECHANICS Annual 3 6 9 ACCOUNTANCY & FINANCE Annual 6 3 9 COMPUTER PROGRAMMING Annual 6 3 9 PRODUCTION MANAGEMENT II Annual 6 6 12 SIXTH COURSE TECHNICAL ENGLISH Annual 9 0 9 MARKETING Annual 3 3 6 BUSINESS ADMINISTRATION II Annual 4,50 4,50 9 LOGISTICS Annual 4,50 4,50 9 1credit = 10 hours of teaching or learning HYDRAULIC MACHINES Annual 3 6 9 PROJECT DEVELOPMENT Annual 3 6 9 INDUSTRIAL CONSTRUCTION AND ARCHITECTURE Annual 6 3 9 4
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUMEMAIN QUALIFICATIONS MSc Project Management The Robert Gordon University (2011-2012, Scotland) http://www.rgu.ac.uk/ Ingeniero Industrial (Industrial Engineer) Universidad de Oviedo (1994-2000, Spain) www.epsig.uniovi.es Master en Prevencion de Riesgos Laborales (Master in Health&Safety) EAGE (2001-2002, Spain) This Degree is the Spanish equivalent to a NEBOSH Diploma. It covers subjects such as: Construction health & safety plans, health and safety European regulations, emergency planning, Risks assessments, safe work practices, etc.TRAINING CAD Training Course (CETS, 1999-2000; 400 hours). Environmental Impact Assessment Course (Asturias Business School, 2002; 62 hours). Surveying Training Course (FLC, 2004; 70 hours). Geographic Information Systems Course (FLC, 2005; 50 hours). ISO Quality and Standards Course (SN, 2006; 50 hours). Structural Analysis CYPECAD Course (FLC, 2007; 65 hours). Structural Analysis Metal 3D Course (FEMETAL, 2007; 70 hours). Energetic Efficiency for Buildings Course (INESEM, 2008; 300 hours). Renewable Energy for Buildings Course (FEMETAL, 2009; 420 hours) Project Management Expert Course (Elogos, 2010; 260 hours) 5
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME Waste Management Course (Elogos, 2011; 250 hours)MAIN WORK EXPERIENCE  PROJECT MANAGER  MECHANICAL, ELECTRICAL AND PLUMBING ENGINEER (MEP ENGINEER)  HEALTH & SAFETY ENGINEERWORK EXPERIENCE DETAILSProject ManagerThe main tasks involved within this position included the following matters: Create and execute project work plans and revise as appropriate to meet changing needs and requirements. Managing the partnering contracts with contractors and material suppliers. Identify resources needed and assign individual responsibilities. Manage day-to-day operational aspects of a project and scope. Prepare for engagement reviews and quality assurance procedures. Track and report team hours and expenses on a weekly basis. Determine appropriate revenue recognition, ensure timely and accurate invoicing, and monitor receivables for project. Follow up with clients, when necessary, regarding unpaid invoices. Analyze project profitability, revenue, margins, bill rates and utilization.MEP Engineer (Building Services Engineer)The main tasks involved within this position included the design and execution supervisionfor electrical, mechanical, plumbing and fire protection installations for residential,commercial and industrial buildings. Mechanical:  Heating, Ventilation, and HVAC systems  Piped heating and cooling water generation and distribution systems  Wastewater pumping systems 6
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME Electrical:  Electric Power Distribution Systems  Lighting Systems  Fire alarm systems  Lightning-protection systems Plumbing:  Compressed air systems  Fire protection systems  Natural gas piping systems  Potable cold and hot tap water supply systems  Drainage systemsHealth & Safety EngineerThe main tasks involved within this position included the following matters: Provide guidance & technical expertise to ensure compliance with environmental, health, and safety regulations and EU Directives Development of Construction H&S Plans Changes updating and enlargements of the Construction H&S Plan Document Control Risks Assessments Execution Supervision according to the Construction H&S Plan. Global Coordination of the different parts involved in the Project. Periodic Meetings and Reports 7
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME PROJECT MANAGER ACTIVITIES 8
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 41 FLATS, AND UNDERGROUND PARKING FOR 45 CAR PLACES (ARRIONDAS-SPAIN)CLIENT:DICARSCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:March 2008 – December 2008KEY INFORMATION:5,700 m2 built up areaINVESTMENT BUDGET:€ 576,880.00LOCATION:Arriondas, Spain 9
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 48 FLATS AND UNDERGROUND PARKING FOR 52 CAR PLACES (MIERES-SPAIN)CLIENT:ALVAREZ Y CUERVOSCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:April 2008 – December 2008KEY INFORMATION:8.600 m2 built up area.INVESTMENT BUDGET:€ 712,546.25LOCATION:Mieres, Spain 10
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 52 FLATS AND UNDERGROUND PARKING FOR 54 CAR PLACES (VILLAVICIOSA-SPAIN)CLIENT:Asturcontinental de EdificacionSCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:May 2007 – March 2008KEY INFORMATION:8.200 m2 built up area.INVESTMENT BUDGET:€ 834,145.21LOCATION:Villaviciosa, Spain 11
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 68 FLATS, AND UNDERGROUND PARKING FOR 70 CAR PLACES (SIERO-SPAIN)CLIENT:IROCASCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:January 2008 – October 2008KEY INFORMATION:11,900 m2 built up areaINVESTMENT BUDGET:€ 892,110.20LOCATION:Pola de Siero, Spain 12
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 40 FLATS AND UNDERGROUND PARKING FOR 52 CAR PLACES (OVIEDO-SPAIN)CLIENT:EDIMARCASCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:September 2007 – June 2008KEY INFORMATION:5,700 m2 built up areaINVESTMENT BUDGET:€ 876,580.00LOCATION:Oviedo, Spain 13
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 35 FLATS AND UNDERGROUND PARKING FOR 40 CAR PLACES (GIJON-SPAIN)CLIENT:GARMORESCOPE OF THE WORKS:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:March 2007– December 2007KEY INFORMATION:5.900 m2 built up areaINVESTMENT BUDGET:€ 650,969.53LOCATION:Gijón, Spain 14
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 38 FLATS, AND UNDERGROUND PARKING FOR 40 CAR PLACES (MIERES - SPAIN)CLIENT:Inmobiliaria ATTASCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:March 2007 – December 2007KEY INFORMATION:5,100 m2 built up areaINVESTMENT BUDGET:€ 561,200.00LOCATION:Mieres, Spain 15
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 36 FLATS AND UNDERGROUND PARKING FOR 40 CAR PLACES (GIJON - SPAIN)CLIENT:Residencial MayaSCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:February 2007 – October 2007KEY INFORMATION:4.200 m2 built up areaINVESTMENT BUDGET:€ 569,452.76LOCATION:Gijón, Spain 16
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 42 FLATS, AND UNDERGROUND PARKING FOR 50 CAR PLACES (CABAÑAQUINTA - SPAIN)CLIENT:INYCOSCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:March 2007 – January 2008KEY INFORMATION:8,900 m2 built up areaINVESTMENT BUDGET:€ 806,140.12LOCATION:Cabañaquinta, Spain 17
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 34 FLATS, AND UNDERGROUND PARKING FOR 38 CAR PLACES (CIAÑO – SPAIN)CLIENT:INMOBILIARIA ATTASCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:January 2007 – August 2007KEY INFORMATION:4,300 m2 built up areaINVESTMENT BUDGET:€ 562,390.00LOCATION:Ciaño, Spain 18
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE FOR THE CONGRESS PALACE IN OVIEDO (OVIEDO – SPAIN)CLIENT:FIAGASCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:January 2005 – December 2006KEY INFORMATION:59,700 m2 built up areaINVESTMENT BUDGET:€ 14.2 Mill.LOCATION:Oviedo, Spain 19
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 38 FLATS, AND UNDERGROUND PARKING FOR 42 CAR PLACES (VILLAVICIOSA - SPAIN)CLIENT:ASTURCONTINENTALSCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:May 2004 – February 2005KEY INFORMATION:5,100 m2 built up areaINVESTMENT BUDGET:€ 575,260.00LOCATION:Villaviciosa, Spain 20
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 14 FLATS AND UNDERGROUND PARKING (CANGAS DE ONIS - SPAIN)CLIENT:COTO DE LOS FERRANESSCOPE OF THE WORKS:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:April 2004 – December 2004KEY INFORMATION:2,600 m2 built up areaINVESTMENT BUDGET:€ 315,781.64LOCATION:Cangas de Onis, Spain 21
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 30 FLATS, AND UNDERGROUND PARKING FOR 32 CAR PLACES (C. ONIS - SPAIN)CLIENT:URBANIA EPRONORSCOPE OF THE WORK:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:March 2004 – October 2004KEY INFORMATION:4,500 m2 built up areaINVESTMENT BUDGET:€ 486,750.24LOCATION:Cangas de Onis, Spain 22
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 32 FLATS, AND UNDERGROUND PARKING FOR 40 CAR PLACES (VILLAVICIOSA - SPAIN)CLIENT:ASTURCONTINENTALSCOPE OF THE WORKS:Concrete Structure ConstructionPOSITION:Project ManagerCOMPLETION PERIOD:January 2004 – August 2004KEY INFORMATION:4,200 m2 built up areaINVESTMENT BUDGET:€ 462,580.00LOCATION:Villaviciosa, Spain 23
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME MEP ENGINEER ACTIVITIES 24
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME FORTIM MINDELO RESORT. SAO VICENTE ISLAND CAPE VERDECLIENT:Cape Verde DevelopmentSCOPE OF THE WORK:Project and ConstructionManagementPOSITION:MEP EngineerCOMPLETION PERIOD:December 2009 – July 2011KEY INFORMATION:Hotel, casino and 74 residentialunits 5-star , 51 room hotel andresort to be managed by luxuryoperator Nikki BeachINVESTMENT BUDGET:€ 31,000,000LOCATION:Mindelo, Sao Vicente Island,Cape Verde 25
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME DRAFT IMPLEMENTATION FOR THE NEW PARKING/COMMERCIAL BUILDING IN LA SABINA PORT (FORMENTERA-SPAIN)CLIENT:MARINA DE FORMENTERASCOPE OF THE WORK:Project DesignPOSITION:MEP EngineerCOMPLETION PERIOD:January 2011 – April 2011KEY INFORMATION:57,900 m2 built up areaINVESTMENT BUDGET:€ 7,2 MillLOCATION:Formentera, SpainGENERAL INFORMATION:Design of new electrical,mechanical, plumbing and fireprotection installations. 26
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME DRAFT IMPLEMENTATION FOR THE NEW INDUSTRIAL BUILDINGS FOR STORAGE AND DISTRIBUTION OF CEMENT IN THE PORT OF ALCUDIA (MALLORCA-SPAIN)CLIENT:CIMENTS BALEARSSCOPE OF THE WORKS:Project DesignPOSITION:MEP EngineerCOMPLETION PERIOD:March 2010 – December 2010KEY INFORMATION:9,900 m2 built up area.INVESTMENT BUDGET:€ 8.6 Mill.LOCATION:Puerto de Alcudia, SpainGENERAL INFORMATION.Includes design for electrical,mechanical, plumbing and fireprotection installations. 27
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME ENLARGEMENT OF THE SCHOOL OF SOLLER (MALLORCA-SPAIN)CLIENT:IBISECSCOPE OF THE WORKS:Construction ManagementProject DesignPOSITION:MEP EngineerCOMPLETION PERIOD:January 2010 – December 2010KEY INFORMATION:3,750 m2 built up areaINVESTMENT BUDGET:€ 1.2 Mill.LOCATION:Soller, SpainGENERAL INFORMATION:Design and executionsupervision for the electrical,mechanical, plumbing and fireprotection installations. 28
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME FACILITIES ASSESSMENT REPORT AT PALMA DE MALLORCA PORTCLIENT :APB (Porth Authority)SCOPE OF THE WORKS:Technical ConsultancyPOSITION:MEP EngineerCOMPLETION PERIOD:Sept 2009 – June 2010KEY INFORMATION:11,000 m docks4,000 m dykesINVESTMENT BUDGET:€ 197,890LOCATION:Palma de Mallorca 29
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME DRAFT IMPLEMENTATION FOR REFURBISHMENT AND ENLARGEMENT OF BUILDINGS AT IBIZA AIRPORT (IBIZA-SPAIN)CLIENT:AENASCOPE OF THE WORKS:Project DesignPOSITION:MEP EngineerCOMPLETION PERIOD:March 2010 – November 2010KEY INFORMATION:1,200 m2 built up areaINVESTMENT BUDGET:€ 112,356.00LOCATION:Ibiza, SpainGENERAL INFORMATION.Includes design of the electricaland heating installations. 30
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME DRAFT IMPLEMENTATION FOR REFURBISHMENT AND ENLARGEMENT OF THE PORT OF FORNELLS (MENORCA-SPAIN)CLIENT:PORTS ILLES BALEARSSCOPE OF THE WORK:Project DesignPOSITION:MEP EngineerCOMPLETION PERIOD:February 2010 – April 2010INVESTMENT BUDGET:€ 357,596.54LOCATION:Puerto Fornells, Menorca, SpainGENERAL INFORMATION:Design of electrical, mechanicaland plumbing installations. 31
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME DRAFT IMPLEMENTATION FOR CONSTRUCTION OF GOLDCAR RENTAL SERVICES AREA IN PALMA AIRPORT (MALLORCA-SPAIN)CLIENT:GOLDCAR RENTALSCOPE OF THE WORKS:Construction ManagementProject DesignPOSITION:MEP EngineerCOMPLETION PERIOD:March 2009 – December 2009KEY INFORMATION:7,900 m2 built up areaINVESTMENT BUDGET:€372,147.54LOCATION:Palma de Mallorca, Spain.GENERAL INFORMATION:Design and executionsupervision for the electrical,mechanical, plumbing and fireprotection installations. 32
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME DRAFT IMPLEMENTATION FOR CONSTRUCTION OF TWO INDUSTRIAL BUILDINGS FOR CHEMICHAL PRODUCTS STORAGE (MALLORCA-SPAIN)CLIENT:TIRMESCOPE OF THE WORKS:Project DesignPOSITION:MEP EngineerCOMPLETION PERIOD:February 2009 – June 2009KEY INFORMATION:475 m2 built up areaINVESTMENT BUDGET:€ 576,200.00LOCATION:Mallorca, Spain.GENERAL INFORMATION:Design of electrical, mechanical,plumbing and fire protectioninstallations. UNDERGROUND PARKING FOR 15 CAR PLACES 33
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME (MALLORCA-SPAIN)CLIENT:VENT DE PROASCOPE OF THE WORKS:Construction ManagementProject DesignPOSITION:MEP EngineerCOMPLETION PERIOD:January 2009 – July 2009KEY INFORMATION:1,300 m2 built up areaINVESTMENT BUDGET:€ 292,320.00LOCATION:Cala San Vicente, Mallorca,Spain.GENERAL INFORMATION:Includes design and executionsupervision for electrical,mechanical, plumbing and fireprotection installations. 34
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME FIRE PROTECTION INSTALLATION FOR THE PORT OF FORNELLSCLIENT:PORTS ILLES BALEARSSCOPE OF THE WORKS:Project DesignPOSITION:MEP EngineerCOMPLETION PERIOD:January 2009 – March 2009INVESTMENT BUDGET:€ 26,480.00LOCATION:Puerto Fornells, Spain 35
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME GESA-ENDESA HEADQUARTERS – PHASE 2 PALMA DE MALLORCACLIENT :EndesaSCOPE OF THE WORKS:Construction ManagementPOSITIONMEP EngineerCOMPLETION PERIOD:October 2008 – June 2009KEY INFORMATION:Building 4: 1.089 m2.Building 5: 1.785 m2Surface parking and urban area:14.489 m2INVESTMENT BUDGET:4.2 Mill €LOCATION:Palma de Mallorca, Spain 36
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME DRAFT IMPLEMENTATION FOR REFURBISHMENT AND ENLARGEMENT OF INDUSTRIAL BUILDING FOR MECHANICAL CONSTRUCTIONS (SIERO - SPAIN)CLIENT :ROTULA 2007SCOPE OF THE WORK:Construction ManagementProject DesignPOSITIONProject Manager/ MEPEngineer (Freelance)COMPLETION PERIOD:January 2008 – May 2008KEY INFORMATION:3,700 m2 built up areaINVESTMENT BUDGET:€ 188,263.71LOCATION:Siero, Spain ELECTRICAL PROJECT FOR THE ENLARGEMENT OF THE FERTIBERIA 37
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME PLANT IN AVILES (AVILES – SPAIN)CLIENT:FERTIBERIASCOPE OF THE WORKS:Construction ManagementProject DesignPOSITION:MEP EngineerCOMPLETION PERIOD:March 2007 – December 2007KEY INFORMATION:3,200 m2 built up areaINVESTMENT BUDGET:€ 415,962.18LOCATION:Avilés, SpainGENERAL INFORMATION:Includes design and executionsupervision for the electricalinstallation. 38
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME HEALTH & SAFETY ENGINEER ACTIVITIES 39
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONSTRUCTION HEALTH&SAFETY PLAN FOR A 36 FLATS RESIDENTIAL BUILDING AND UNDERGROUND PARKING FOR 40 CAR PLACES (OVIEDO-SPAIN)CLIENT:HONA HOGAR YNATURALEZASCOPE OF THE WORKS:Construction H&S Plan DesignPOSITION:H&S Engineer (Freelance)COMPLETION PERIOD:February 2004 – April 2004KEY INFORMATION:4,100 m2 built up areaLOCATION:Oviedo, Spain 40
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONSTRUCTION HEALTH&SAFETY PLAN FOR A 82 FLATS RESIDENTIAL BUILDING AND UNDERGROUND PARKING FOR 90 CAR PLACES (COLLOTO-SPAIN)CLIENT:HONA HOGAR YNATURALEZASCOPE OF THE WORKS:Construction H&S Plan DesignPOSITION:H&S Engineer (Freelance)COMPLETION PERIOD:January 2004 – March 2004KEY INFORMATION:6,900 m2 built up areaLOCATION:Colloto, Spain. 41
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME CONSTRUCTION HEALTH&SAFETY PLAN FOR A 110 FLATS RESIDENTIAL BUILDING AND UNDERGROUND PARKING FOR 120 CAR PLACES (LUANCO-SPAIN)CLIENT:HONA HOGAR YNATURALEZASCOPE OF THE WORK:Construction H&S Plan DesignPOSITION:H&S Engineer (Freelance)COMPLETION PERIOD:March 2003 – May 2003KEY INFORMATION:8,800 m2 built up areaLOCATION:Luanco, Spain 42
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME HEALTH & SAFETY CONSTRUCTION MANAGEMENT DURING THE CONSTRUCTION OF THE ALAS ALUMINIUM PLANT IN CIAÑO (CIAÑO – SPAIN)CLIENT:ALAS ALUMINIUMSCOPE OF THE WORKS:Health & Safety ConstructionManagementPOSITION:Health & Safety EngineerCOMPLETION PERIOD:January 2003 – December 2003KEY INFORMATION:9,500 m2 built up areaINVESTMENT BUDGET:€ 3.6 Mill.LOCATION:Ciaño, Spain 43
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME HEALTH & SAFETY CONSTRUCTION MANAGEMENT DURING THE CONSTRUCTION OF THE RAILFORJA PLANT IN GIJON (GIJON – SPAIN)CLIENT:Railforja AsturianaSCOPE OF THE WORK:Health & Safety ConstructionManagementPOSITION:Health & Safety EngineerCOMPLETION PERIOD:January 2003 – October 2003KEY INFORMATION:4,100 m2 built up areaINVESTMENT BUDGET:€ 1.3 Mill.LOCATION:Puerto del Musel, Gijon (Spain) 44
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME HEALTH & SAFETY CONSTRUCTION MANAGEMENT DURING THE ENLARGEMENT OF THE ARCELOR PLANT IN GIJON (GIJON – SPAIN)CLIENT:ARCELOR-MITTALSCOPE OF THE WORKS:Health & Safety ConstructionManagementPOSITION:Health & Safety EngineerCOMPLETION PERIOD:February 2002 – November2002KEY INFORMATION:1,900 m2 built up areaINVESTMENT BUDGET:€ 946,280.00LOCATION:Gijón, Spain 45
  • MANUEL SUAREZ PROFESSIONAL CAREERINDUSTRIAL ENGINEER RESUME RISK ASSESSMENT OF WORKING CONDITIONS FOR A MECHANICAL CONSTRUCTION INDUSTRY (CORVERA-SPAIN)CLIENT:METUVISASCOPE OF THE WORK:Health & Safety AssessmentPOSITION:Health & Safety Engineer(Freelance)COMPLETION PERIOD:March 2001 – June 2001LOCATION:Corvera, Spain 46