Jessica D. Anson

Creating Magic from aVision
            And
 Being the Eye of the Storm
Demonstration of Work
 In this slide show you will see samples of the following:
   Creative Manager Pro Schedules
   M...
This slide provides a sample of a website that was a flash website with all
Schedules   development outsourced - UX and de...
This slide provides a sample of a website that was a flash website with all
Schedules   development outsourced - UX and de...
This slide provides a sample of a website that consisted of updates to an
Schedules   existing Cold Fusion CMS. There was ...
This slide provides a sample of a website that consisted of updates to an
Schedules   existing Cold Fusion CMS. There was ...
Microsoft Project Schedule




This slide is an example of the use of Microsoft Project. I have one resource who works on
...
Microsoft Project Schedule




This slide is an example of the use of Microsoft Project. I have one resource who works on
...
Wire Frames
This is a wire frame done for a
client to document all
requirements for the requested
work. Documentation
incl...
Wire Frames
This is a wire frame done for a
client to document all
requirements for the requested
work. Documentation
incl...
Wire Frames
Sometimes in wire frames I
would document elements of
the backend so the developer
would make no assumptions
a...
Depending on the project, Site Maps will be done before the Wire Frames
Site Maps   or in conjunction with the Wire Frames...
This site map was color coded to help the client identify which pages
Site Maps   needed content, needed photography or ne...
Technical Specifications
                           During a project I had to
                           take over finishi...
Technical Specifications
Technical Specifications
Technical Specifications
Budgets & Estimates
                      We primarily use Creative Manager Pro to
                      track our project...
Budgets & Estimates
Before creating a SOW
for the client, an internal
estimate is created using
an Excel spreadsheet.
Form...
Budgets & Estimates
Here is a sample of a
SOW (Statement of
Work) created for a
      )
client. It documents
the cost and ...
Retainer Spreadsheets
Several clients pre-pay for retainer hours that they can use monthly or annually. Work process is as...
Retainer Spreadsheets
Lessons Learned

At the end of the DCPA web
site redesign and development
project, a debrief was
conducted both internally...
Upcoming SlideShare
Loading in...5
×

Jessica D Anson 2009

508

Published on

Samples of work

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
508
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Jessica D Anson 2009

  1. 1. Jessica D. Anson Creating Magic from aVision And Being the Eye of the Storm
  2. 2. Demonstration of Work  In this slide show you will see samples of the following:  Creative Manager Pro Schedules  Microsoft Project Schedule  Wire Frames built in Microsoft Visio  Site Maps built in Mindjet Mindmanager & Free Mind  Technical specifications p  Budget Screen shots from CMP/ Estimates built in Microsoft Excel RRetainer Spreadsheets built in Microsoft Excel and Google D S dh b l M f E l d G l Docs  Lessons Learned document
  3. 3. This slide provides a sample of a website that was a flash website with all Schedules development outsourced - UX and design work were kept internal. This p j g project got off track many times due to the client not being able to nail y g down what they wanted. After a final meeting we were able to get the client to refocus and hit all committed delivery dates.
  4. 4. This slide provides a sample of a website that was a flash website with all Schedules development outsourced - UX and design work were kept internal. This p j g project got off track many times due to the client not being able to nail y g down what they wanted. After a final meeting we were able to get the client to refocus and hit all committed delivery dates.
  5. 5. This slide provides a sample of a website that consisted of updates to an Schedules existing Cold Fusion CMS. There was UX, design and then implementation of the changes. Project has b on schedule and on i l t ti f th h P j t h been h d l d budget to date.
  6. 6. This slide provides a sample of a website that consisted of updates to an Schedules existing Cold Fusion CMS. There was UX, design and then implementation of the changes. Project has b on schedule and on i l t ti f th h P j t h been h d l d budget to date.
  7. 7. Microsoft Project Schedule This slide is an example of the use of Microsoft Project. I have one resource who works on multiple clients at any given time. In order to keep things clear and straight, we track his time and tasks in Project.
  8. 8. Microsoft Project Schedule This slide is an example of the use of Microsoft Project. I have one resource who works on multiple clients at any given time. In order to keep things clear and straight, we track his time and tasks in Project.
  9. 9. Wire Frames This is a wire frame done for a client to document all requirements for the requested work. Documentation includes notes to designers, notes to d l developers, andd overall capture of scope. No design work or development will begin until client p g provides approval either through email or signed and fax.
  10. 10. Wire Frames This is a wire frame done for a client to document all requirements for the requested work. Documentation includes notes to designers, notes to d l developers, andd overall capture of scope. No design work or development will begin until client p g provides approval either through email or signed and fax.
  11. 11. Wire Frames Sometimes in wire frames I would document elements of the backend so the developer would make no assumptions and the client could make sure no b i business requirements were i missing. We often determined that business requirements had not been well thought out by g y the time development started.
  12. 12. Depending on the project, Site Maps will be done before the Wire Frames Site Maps or in conjunction with the Wire Frames. This document is important to really capture the bird s eye view of the web site. bird’s site
  13. 13. This site map was color coded to help the client identify which pages Site Maps needed content, needed photography or needed to be revised.
  14. 14. Technical Specifications During a project I had to take over finishing the technical specifications for a large web site project. A resource assigned did not finish the work and was no longer available. I went l l bl through and used tracked changes so the development team would p see what had been added or changed. I did not want them to have to re- read anything that h d d thi th t had not changed since work had already started. These next few slides show samples of the work I did.
  15. 15. Technical Specifications
  16. 16. Technical Specifications
  17. 17. Technical Specifications
  18. 18. Budgets & Estimates We primarily use Creative Manager Pro to track our projects. In this system, we create an estimate and enter in the time for internal labor and any PO s for contract PO’s work or sales commissions. This way we know exactly the budget we have to work with internally. The smaller screen shot below is a snap shot done by CMP; it gives you an idea of remaining internal hours.
  19. 19. Budgets & Estimates Before creating a SOW for the client, an internal estimate is created using an Excel spreadsheet. Formulas are set up and items adjusted as needed to d determine the cost of h f the project. This is a sample of an internal estimate created for a project.
  20. 20. Budgets & Estimates Here is a sample of a SOW (Statement of Work) created for a ) client. It documents the cost and work to be completed by the team in great detail It also detail. identifies when the client is responsible for elements of the project.
  21. 21. Retainer Spreadsheets Several clients pre-pay for retainer hours that they can use monthly or annually. Work process is as follows: work request comes in from the client; estimate is gotten from the team; hours are approved by client to put on retainer; work is done. Work requests are completed within 24 to 48 hours. However, if th work request i more th 3 h the k t is than hours, we strive t complete th work within 1 week. R t i t i to l t the k ithi k Retainer spreadsheets are managed in either Microsoft Excel or in a Google Docs spreadsheet.
  22. 22. Retainer Spreadsheets
  23. 23. Lessons Learned At the end of the DCPA web site redesign and development project, a debrief was conducted both internally and externally with the client. Then a combination of the two debriefs was compiled into one document. This brief snap shot was a very h l f l h helpful piece of the project because it summarized both the client’s and the internal team’s thoughts.

×