Submittals are those shop drawings,
product data, samples, and mock-ups
to be delivered to the design profes-
sional (the architect or engineer) for
review and action as required by the
contract documents.
Various types of submittals are part
of the construction process. These
include action submittals, informa-
tional submittals, those furnished as
part of project closeout, and those
that are considered maintenance
material. An important element of
the submittal process is the prepa-
ration, review, and approval of shop
drawings. The American Institute of
Architects (AIA) defines shop draw-
ings as follows:
Shop drawings: Drawings, dia-
grams, schedules, and other data
specifically prepared for the work by
the contractor or a sub-contractor,
manufacturer, supplier, or distribu-
tor to illustrate some portion of the
work.
The purpose of shop drawings is to
enable the design professional to
secure graphic representation from
the general contractor as to how
the installing contractor intends to
complete a portion of the work, prior
to proceeding, for which submittals
are required.
The submittal process begins for
the design professional during the
preparation of technical specifica-
tions. Identifying the types of sub-
mittals that are required within the
project manual is just the beginning
of the submittal process. Master
guide specifications, along with
manufacturer’s specifications may
enumerate a list of submittals that
could be furnished for each division
of work. It is the responsibility of the
design professional to review that list
of potentially required submittals to
determine those germane to the spe-
cific project. It is important to evalu-
ate which submittals are necessary
and appropriate to ensure sufficient
coordination during construction.
As a project enters the construction
phase, the responsibility for process-
ing shop drawings and other submit-
tals is often delegated to a junior as-
sociate as an administrative function.
This important review process should
be managed by someone familiar
with the project and also knowledge-
able of the type of construction for
which submittals may be reviewed.
A general contractor is typically
required to prepare a schedule of
submittals. Similarly, the design pro-
fessional should document, through
their submittal log book, a list of
those required submittals specified
in each section within the project
manual. Completing this task prior to
the start of construction will enable
the design professional to accurately
track the status of submittals during
the construction phase.
Problems may be manifested and a
design professional may face liabil-
ity if a project proceeds without the
required shop drawings having been
submitted or with shop drawings that
contain errors. In both situations, the
design professional’s compliance
with the standard of care might be
questioned. If a specific aspect of the
project was incorrectly illustrated on a
shop drawing or if the design deviated
from specified requirements, and it has
been accepted by the design profes-
sional, compliance with the standard of
care may again be questioned.
The Importance Of The
Construction
Submittal Process
800.813.6736 | www.robsonforensic.com
Ronald P. Bertone, FAIA, FACHA, NCARB
© 2015 Robson Forensic, Inc.
If a submittal is made containing
revisions in order for the specified
aspect of the project to comply with
the construction documents, those
deviations must be identified and
approved by the design professional
prior to the contractor proceeding
with that aspect of construction.
It is important to understand that
shop drawings are not contract doc-
uments. However, the requirements
with regard to requiring them and the
design professional’s interaction with
them, may reflect the standard of
care. Section 3.12.4 of AIA Document
A-201-2007 states:
Shop Drawings, Product Data,
Samples and similar submittals are
not Contract Documents. Their
purpose is to demonstrate the way
in which the Contractor proposes
to conform to the information given
and the design concept expressed
in the Contract Documents for
those portions of the Work for
which the Contract Documents
require submittals.
Another section within the AIA
General Conditions, relevant to the
design professional, as part of the
submittal process is Article 3.12.10.
This addresses those portions of the
project, not designed by the architect
that will require the preparation of
shop drawings by another licensed
professional.
If professional design services or
certifications by a design profes-
sional related to systems, materi-
als or equipment are specifically
required of the Contractor by the
Contract Documents, the Owner
and the Architect will specify all
performance and design criteria
that such services must satisfy. The
Contractor shall cause such ser-
vices or certifications to be provid-
ed by a properly licensed design
professional, whose signature and
seal shall appear on all drawings,
calculations, specifications, cer-
tifications, Shop Drawings, and
other submittals prepared by such
professional.
Shop Drawings and other submit-
tals related to the Work designed
or certified by such professional,
if prepared by others, shall bear
such professional’s written approval
when submitted to the Architect.
The Owner and the Architect shall
be entitled to rely upon the ade-
quacy, accuracy, and completeness
of the services, certifications and
approvals performed or provid-
ed by such design professionals,
provided the Owner and Architect
have specified to the Contractor
all performance and design criteria
that such services must satisfy.
Pursuant to this Section 3.12.10, the
Architect will review, approve or
take other appropriate action on
submittals only for the limited pur-
pose of checking for conformance
with information given and the
design concept expressed in the
Contract Documents. The Con-
tractor shall not be responsible for
the adequacy of the performance
and design criteria specified in the
Contract Documents.
If the architect specifies that engi-
neered shop drawings are required,
and if they are to be certified by an-
other design professional, the archi-
tect of record has the responsibility
to review and take appropriate action
for the limited purpose of checking
for conformance with the design con-
cept. Failure to do so may expose
the architect to additional risk.
The Architect of Record should
require certification from this sec-
ond design professional to establish
that the work designed by this other
professional complies with the de-
sign intent of his project documents.
Certifications related to codes and
standards, structural capabilities, etc.,
should also be considered.
The submittal review process pro-
vides important system of checks
and balances during the construction
phase of a project. The purpose is
to ensure that the end result con-
forms to the design intent depict-
ed in the construction documents
and meets the expectations of the
owner. During the pre-construction
conference, it is important for the
owner, architect and contractor to
gain a clear understanding as to the
roles and responsibilities of those
tasked with implementing the sub-
mittal process. This process involves
significant potential risk which must
be properly managed. During the
pre-construction meeting, applicable
contract provisions should be read,
discussed, and documented as hav-
ing been reviewed.
Ronald P. Bertone, FAIA, FACHA
Architect
rbertone@robsonforensic.com
Through his architectural experience
and professional credentials, Ron
Bertone provides technical investi-
gation and expert analysis on legal
cases that include evaluating com-
pliance with the applicable standard
of care, construction defects, code
compliant construction, and other
building or professional service
claims.
Ron is a Licensed Architect in more
than ten states, is certified by the
National Council of Architectural
Registration Boards, served on the
AIA National Ethics Council, and has
been elevated to Fellowship by the
American Institute of Architects and
the American College of Healthcare
Architects.
800.813.6736 | www.robsonforensic.com
© 2015 Robson Forensic, Inc.

More Related Content

What's hot

Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailingSp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailingjemmabarsby
 
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractThe Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractTom Joseph Mukasa
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxssuserc0bf9b
 
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONA STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONSubhendu Datta
 
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Divyanshu Dayal
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsmichaeljmack
 
Method aluminum door & window
Method aluminum door & windowMethod aluminum door & window
Method aluminum door & windowMinh Bui Si
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESR.R.G.S Bandara
 
Civil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation SlidesCivil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation SlidesSlideTeam
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Kipcon Inc.
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01saed saffarini
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC ContractKai Yun Pang
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 

What's hot (20)

Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailingSp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailing
 
Fidic
FidicFidic
Fidic
 
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractThe Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction Contract
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
 
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONA STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTION
 
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
 
Method aluminum door & window
Method aluminum door & windowMethod aluminum door & window
Method aluminum door & window
 
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATESGeneral notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
 
Civil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation SlidesCivil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation Slides
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
 
Taking off qs
Taking off qsTaking off qs
Taking off qs
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Construction phases
Construction phasesConstruction phases
Construction phases
 

Viewers also liked

Submittal -User Manual
Submittal -User ManualSubmittal -User Manual
Submittal -User ManualNiyas Sulaiman
 
PM : Shop Drawings
PM : Shop DrawingsPM : Shop Drawings
PM : Shop DrawingsTodd Wyatt
 
Proposal for The Woodlands at San Marcos apartment complex
Proposal for The Woodlands at San Marcos apartment complexProposal for The Woodlands at San Marcos apartment complex
Proposal for The Woodlands at San Marcos apartment complexBrad Rollins
 
IPv6 Deployment in Europe
IPv6 Deployment in EuropeIPv6 Deployment in Europe
IPv6 Deployment in EuropeRIPE NCC
 
Best Link building techniques of 2016
Best Link building techniques of 2016Best Link building techniques of 2016
Best Link building techniques of 2016Ally Digital Media
 
Submittal Exchange: Transportation and Civil Construction
Submittal Exchange: Transportation and Civil ConstructionSubmittal Exchange: Transportation and Civil Construction
Submittal Exchange: Transportation and Civil ConstructionBrad Brown
 
Safety and health in constrcution
Safety and health in constrcutionSafety and health in constrcution
Safety and health in constrcutionYAWAR HASSAN KHAN
 
Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessWork Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessDhawal Thakkar PMP
 
Shop Drawing Review
Shop Drawing ReviewShop Drawing Review
Shop Drawing ReviewEllieNowels
 
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2Anne Arundel Community College
 
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Lamdade Akhil
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)mbrsalman
 
Basic blueprint reading
Basic blueprint readingBasic blueprint reading
Basic blueprint readingJames Shearer
 

Viewers also liked (20)

Submittal -User Manual
Submittal -User ManualSubmittal -User Manual
Submittal -User Manual
 
SHOP DRAWINGS
SHOP DRAWINGSSHOP DRAWINGS
SHOP DRAWINGS
 
PM : Shop Drawings
PM : Shop DrawingsPM : Shop Drawings
PM : Shop Drawings
 
Proposal for The Woodlands at San Marcos apartment complex
Proposal for The Woodlands at San Marcos apartment complexProposal for The Woodlands at San Marcos apartment complex
Proposal for The Woodlands at San Marcos apartment complex
 
IPv6 Deployment in Europe
IPv6 Deployment in EuropeIPv6 Deployment in Europe
IPv6 Deployment in Europe
 
Sethulakshmi
SethulakshmiSethulakshmi
Sethulakshmi
 
Best Link building techniques of 2016
Best Link building techniques of 2016Best Link building techniques of 2016
Best Link building techniques of 2016
 
Submittal Exchange: Transportation and Civil Construction
Submittal Exchange: Transportation and Civil ConstructionSubmittal Exchange: Transportation and Civil Construction
Submittal Exchange: Transportation and Civil Construction
 
Safety and health in constrcution
Safety and health in constrcutionSafety and health in constrcution
Safety and health in constrcution
 
Earned Value Management - Intent 32 Guidelines Summary
Earned Value Management - Intent 32 Guidelines SummaryEarned Value Management - Intent 32 Guidelines Summary
Earned Value Management - Intent 32 Guidelines Summary
 
WBS PROJECT
WBS PROJECTWBS PROJECT
WBS PROJECT
 
Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessWork Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management Process
 
Shop Drawing Review
Shop Drawing ReviewShop Drawing Review
Shop Drawing Review
 
Wbs For Building Project
Wbs For Building ProjectWbs For Building Project
Wbs For Building Project
 
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
 
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Bar bending schedule(by akhil)
Bar bending schedule(by akhil)
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
 
Basic blueprint reading
Basic blueprint readingBasic blueprint reading
Basic blueprint reading
 

Similar to The Importance Of The Construction Submittal Process

7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Processarananeust
 
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsArchitectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsGalala University
 
Construction terminologies
Construction terminologiesConstruction terminologies
Construction terminologiesSandya Devarajan
 
03 Architectural Job Phases
03 Architectural Job Phases03 Architectural Job Phases
03 Architectural Job PhasesDouglas Vail
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneeringAbdo Jamous El Jamous
 
Why commissioning authority should complete commissioning checklists
Why commissioning authority should complete commissioning checklistsWhy commissioning authority should complete commissioning checklists
Why commissioning authority should complete commissioning checklistsOlivia Wilson
 
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfglossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfCarlStevenAtencio
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementationTeo Kean Hui
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesMcCarthy Holdings, Inc.
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Construction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building CodeConstruction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building CodeMilton Grew
 

Similar to The Importance Of The Construction Submittal Process (20)

7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process
 
What to Look for When Hiring a Structural Engineer.pptx
What to Look for When Hiring a Structural Engineer.pptxWhat to Look for When Hiring a Structural Engineer.pptx
What to Look for When Hiring a Structural Engineer.pptx
 
130125.PROCESS DIAGRAM
130125.PROCESS DIAGRAM130125.PROCESS DIAGRAM
130125.PROCESS DIAGRAM
 
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsArchitectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction Documents
 
Matrix207
Matrix207Matrix207
Matrix207
 
Construction terminologies
Construction terminologiesConstruction terminologies
Construction terminologies
 
03 Architectural Job Phases
03 Architectural Job Phases03 Architectural Job Phases
03 Architectural Job Phases
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
Final building-team
Final building-teamFinal building-team
Final building-team
 
Final building-team
Final building-teamFinal building-team
Final building-team
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
 
Why commissioning authority should complete commissioning checklists
Why commissioning authority should complete commissioning checklistsWhy commissioning authority should complete commissioning checklists
Why commissioning authority should complete commissioning checklists
 
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfglossary-of-construction-terms.pdf
glossary-of-construction-terms.pdf
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
Construction process
Construction processConstruction process
Construction process
 
Aiab089228
Aiab089228Aiab089228
Aiab089228
 
Working drawing and detailing
Working drawing and detailingWorking drawing and detailing
Working drawing and detailing
 
Construction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building CodeConstruction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building Code
 

More from Safe Rise

Nfpa standards directory 2016
Nfpa standards directory 2016Nfpa standards directory 2016
Nfpa standards directory 2016Safe Rise
 
Parking page-handout-graphic
Parking page-handout-graphicParking page-handout-graphic
Parking page-handout-graphicSafe Rise
 
World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010Safe Rise
 
World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1Safe Rise
 
Emvchipcard flyer
Emvchipcard flyerEmvchipcard flyer
Emvchipcard flyerSafe Rise
 
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207Safe Rise
 
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206Safe Rise
 
New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205Safe Rise
 
New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204Safe Rise
 
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202Safe Rise
 
New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201Safe Rise
 
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104Safe Rise
 
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103Safe Rise
 
New York City Department of Buildings Filing rep course_102
 New York City Department of Buildings Filing rep course_102 New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102Safe Rise
 
New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101Safe Rise
 
Mentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common MistakesMentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common MistakesSafe Rise
 
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSESSafe Rise
 
Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Safe Rise
 
2014 Truth About Real-Time Marketing
2014 Truth About Real-Time Marketing2014 Truth About Real-Time Marketing
2014 Truth About Real-Time MarketingSafe Rise
 
Ag# 342 yeung residence - child bedroom
Ag# 342   yeung residence - child bedroomAg# 342   yeung residence - child bedroom
Ag# 342 yeung residence - child bedroomSafe Rise
 

More from Safe Rise (20)

Nfpa standards directory 2016
Nfpa standards directory 2016Nfpa standards directory 2016
Nfpa standards directory 2016
 
Parking page-handout-graphic
Parking page-handout-graphicParking page-handout-graphic
Parking page-handout-graphic
 
World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010
 
World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1
 
Emvchipcard flyer
Emvchipcard flyerEmvchipcard flyer
Emvchipcard flyer
 
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207
 
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206
 
New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205
 
New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204
 
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202
 
New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201
 
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104
 
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103
 
New York City Department of Buildings Filing rep course_102
 New York City Department of Buildings Filing rep course_102 New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102
 
New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101
 
Mentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common MistakesMentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common Mistakes
 
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
 
Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...
 
2014 Truth About Real-Time Marketing
2014 Truth About Real-Time Marketing2014 Truth About Real-Time Marketing
2014 Truth About Real-Time Marketing
 
Ag# 342 yeung residence - child bedroom
Ag# 342   yeung residence - child bedroomAg# 342   yeung residence - child bedroom
Ag# 342 yeung residence - child bedroom
 

Recently uploaded

guest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssguest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssNadaMohammed714321
 
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - MorgenboosterAI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster1508 A/S
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
world health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbbworld health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbbpreetirao780
 
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptxUnit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptxNitish292041
 
Niintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptxNiintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptxKevinYaelJimnezSanti
 
Karim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppKarim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppNadaMohammed714321
 
Piece by Piece Magazine
Piece by Piece Magazine                      Piece by Piece Magazine
Piece by Piece Magazine CharlottePulte
 
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道yrolcks
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic global solution
 
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfsimpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfLucyBonelli
 
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxGeneral Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxmarckustrevion
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
Pearl Disrtrict urban analyusis study pptx
Pearl Disrtrict urban analyusis study pptxPearl Disrtrict urban analyusis study pptx
Pearl Disrtrict urban analyusis study pptxDanielTamiru4
 
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptMaking and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptJIT KUMAR GUPTA
 
The spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyThe spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyChristopher Totten
 
guest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssguest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssNadaMohammed714321
 
Interior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioInterior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioRMG Project Studio
 

Recently uploaded (20)

guest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssguest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssss
 
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - MorgenboosterAI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
world health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbbworld health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbb
 
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptxUnit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
 
Niintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptxNiintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptx
 
Karim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppKarim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 ppppppppppppppp
 
Piece by Piece Magazine
Piece by Piece Magazine                      Piece by Piece Magazine
Piece by Piece Magazine
 
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing servicesIconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing services
 
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfsimpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
 
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptxGeneral Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptx
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
Pearl Disrtrict urban analyusis study pptx
Pearl Disrtrict urban analyusis study pptxPearl Disrtrict urban analyusis study pptx
Pearl Disrtrict urban analyusis study pptx
 
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptMaking and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
 
The spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyThe spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenology
 
guest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssguest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssss
 
Interior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioInterior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project Studio
 

The Importance Of The Construction Submittal Process

  • 1. Submittals are those shop drawings, product data, samples, and mock-ups to be delivered to the design profes- sional (the architect or engineer) for review and action as required by the contract documents. Various types of submittals are part of the construction process. These include action submittals, informa- tional submittals, those furnished as part of project closeout, and those that are considered maintenance material. An important element of the submittal process is the prepa- ration, review, and approval of shop drawings. The American Institute of Architects (AIA) defines shop draw- ings as follows: Shop drawings: Drawings, dia- grams, schedules, and other data specifically prepared for the work by the contractor or a sub-contractor, manufacturer, supplier, or distribu- tor to illustrate some portion of the work. The purpose of shop drawings is to enable the design professional to secure graphic representation from the general contractor as to how the installing contractor intends to complete a portion of the work, prior to proceeding, for which submittals are required. The submittal process begins for the design professional during the preparation of technical specifica- tions. Identifying the types of sub- mittals that are required within the project manual is just the beginning of the submittal process. Master guide specifications, along with manufacturer’s specifications may enumerate a list of submittals that could be furnished for each division of work. It is the responsibility of the design professional to review that list of potentially required submittals to determine those germane to the spe- cific project. It is important to evalu- ate which submittals are necessary and appropriate to ensure sufficient coordination during construction. As a project enters the construction phase, the responsibility for process- ing shop drawings and other submit- tals is often delegated to a junior as- sociate as an administrative function. This important review process should be managed by someone familiar with the project and also knowledge- able of the type of construction for which submittals may be reviewed. A general contractor is typically required to prepare a schedule of submittals. Similarly, the design pro- fessional should document, through their submittal log book, a list of those required submittals specified in each section within the project manual. Completing this task prior to the start of construction will enable the design professional to accurately track the status of submittals during the construction phase. Problems may be manifested and a design professional may face liabil- ity if a project proceeds without the required shop drawings having been submitted or with shop drawings that contain errors. In both situations, the design professional’s compliance with the standard of care might be questioned. If a specific aspect of the project was incorrectly illustrated on a shop drawing or if the design deviated from specified requirements, and it has been accepted by the design profes- sional, compliance with the standard of care may again be questioned. The Importance Of The Construction Submittal Process 800.813.6736 | www.robsonforensic.com Ronald P. Bertone, FAIA, FACHA, NCARB © 2015 Robson Forensic, Inc.
  • 2. If a submittal is made containing revisions in order for the specified aspect of the project to comply with the construction documents, those deviations must be identified and approved by the design professional prior to the contractor proceeding with that aspect of construction. It is important to understand that shop drawings are not contract doc- uments. However, the requirements with regard to requiring them and the design professional’s interaction with them, may reflect the standard of care. Section 3.12.4 of AIA Document A-201-2007 states: Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. Their purpose is to demonstrate the way in which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents for those portions of the Work for which the Contract Documents require submittals. Another section within the AIA General Conditions, relevant to the design professional, as part of the submittal process is Article 3.12.10. This addresses those portions of the project, not designed by the architect that will require the preparation of shop drawings by another licensed professional. If professional design services or certifications by a design profes- sional related to systems, materi- als or equipment are specifically required of the Contractor by the Contract Documents, the Owner and the Architect will specify all performance and design criteria that such services must satisfy. The Contractor shall cause such ser- vices or certifications to be provid- ed by a properly licensed design professional, whose signature and seal shall appear on all drawings, calculations, specifications, cer- tifications, Shop Drawings, and other submittals prepared by such professional. Shop Drawings and other submit- tals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to the Architect. The Owner and the Architect shall be entitled to rely upon the ade- quacy, accuracy, and completeness of the services, certifications and approvals performed or provid- ed by such design professionals, provided the Owner and Architect have specified to the Contractor all performance and design criteria that such services must satisfy. Pursuant to this Section 3.12.10, the Architect will review, approve or take other appropriate action on submittals only for the limited pur- pose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Con- tractor shall not be responsible for the adequacy of the performance and design criteria specified in the Contract Documents. If the architect specifies that engi- neered shop drawings are required, and if they are to be certified by an- other design professional, the archi- tect of record has the responsibility to review and take appropriate action for the limited purpose of checking for conformance with the design con- cept. Failure to do so may expose the architect to additional risk. The Architect of Record should require certification from this sec- ond design professional to establish that the work designed by this other professional complies with the de- sign intent of his project documents. Certifications related to codes and standards, structural capabilities, etc., should also be considered. The submittal review process pro- vides important system of checks and balances during the construction phase of a project. The purpose is to ensure that the end result con- forms to the design intent depict- ed in the construction documents and meets the expectations of the owner. During the pre-construction conference, it is important for the owner, architect and contractor to gain a clear understanding as to the roles and responsibilities of those tasked with implementing the sub- mittal process. This process involves significant potential risk which must be properly managed. During the pre-construction meeting, applicable contract provisions should be read, discussed, and documented as hav- ing been reviewed. Ronald P. Bertone, FAIA, FACHA Architect rbertone@robsonforensic.com Through his architectural experience and professional credentials, Ron Bertone provides technical investi- gation and expert analysis on legal cases that include evaluating com- pliance with the applicable standard of care, construction defects, code compliant construction, and other building or professional service claims. Ron is a Licensed Architect in more than ten states, is certified by the National Council of Architectural Registration Boards, served on the AIA National Ethics Council, and has been elevated to Fellowship by the American Institute of Architects and the American College of Healthcare Architects. 800.813.6736 | www.robsonforensic.com © 2015 Robson Forensic, Inc.