The Importance Of The Construction Submittal Process Ronald P. Bertone, FAIA, FACHA, NCARB
Read less
Read more
Design
Report
Share
Report
Share
1 of 2
Download now
Download to read offline
Recommended
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
Anne Arundel Community College
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
Anne Arundel Community College
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
LBS Builders Merchants
Pathway guide quantity_surveying_construction_dwl_pt
Pathway guide quantity_surveying_construction_dwl_pt
Adarsh Kumar Jain CEO@Consulting Consultant NCR
Fidic conditions of contract presentation
Fidic conditions of contract presentation
Jeff B
Sample construction contract
Sample construction contract
Trung Nguyen Dang, PMP
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for Contractors
AMSYSCO Inc.
Site Possession
Site Possession
Amir Ibrahim
Recommended
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
Anne Arundel Community College
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
Anne Arundel Community College
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
Ancon Wall Ties and Restraint Fixings for Brick, Block and Stone
LBS Builders Merchants
Pathway guide quantity_surveying_construction_dwl_pt
Pathway guide quantity_surveying_construction_dwl_pt
Adarsh Kumar Jain CEO@Consulting Consultant NCR
Fidic conditions of contract presentation
Fidic conditions of contract presentation
Jeff B
Sample construction contract
Sample construction contract
Trung Nguyen Dang, PMP
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for Contractors
AMSYSCO Inc.
Site Possession
Site Possession
Amir Ibrahim
Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailing
jemmabarsby
Fidic
Fidic
Ranjit Patil
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction Contract
Tom Joseph Mukasa
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
ssuserc0bf9b
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTION
Subhendu Datta
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Divyanshu Dayal
Boq piling works
Boq piling works
Rohaidah Aida
Construction tender process
Construction tender process
Dr Andrew Kimmance PhD, MSc, BSc, MAPM, CIOB, AHEA
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
michaeljmack
Method aluminum door & window
Method aluminum door & window
Minh Bui Si
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
R.R.G.S Bandara
Civil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation Slides
SlideTeam
Preparation of boq
Preparation of boq
R.R.G.S Bandara
Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Kipcon Inc.
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
saed saffarini
Taking off qs
Taking off qs
EZEKIEL LUGOMOKA
Preparation of bill sandeep
Preparation of bill sandeep
Sandeep Yadav
Assignment - FIDIC Contract
Assignment - FIDIC Contract
Kai Yun Pang
Construction phases
Construction phases
Meesum Zaidi
Submittal -User Manual
Submittal -User Manual
Niyas Sulaiman
SHOP DRAWINGS
SHOP DRAWINGS
JO ANN JOHNSON
More Related Content
What's hot
Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailing
jemmabarsby
Fidic
Fidic
Ranjit Patil
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction Contract
Tom Joseph Mukasa
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
ssuserc0bf9b
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTION
Subhendu Datta
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Divyanshu Dayal
Boq piling works
Boq piling works
Rohaidah Aida
Construction tender process
Construction tender process
Dr Andrew Kimmance PhD, MSc, BSc, MAPM, CIOB, AHEA
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
michaeljmack
Method aluminum door & window
Method aluminum door & window
Minh Bui Si
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
R.R.G.S Bandara
Civil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation Slides
SlideTeam
Preparation of boq
Preparation of boq
R.R.G.S Bandara
Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Kipcon Inc.
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
saed saffarini
Taking off qs
Taking off qs
EZEKIEL LUGOMOKA
Preparation of bill sandeep
Preparation of bill sandeep
Sandeep Yadav
Assignment - FIDIC Contract
Assignment - FIDIC Contract
Kai Yun Pang
Construction phases
Construction phases
Meesum Zaidi
What's hot
(20)
Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailing
Fidic
Fidic
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction Contract
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTION
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Boq piling works
Boq piling works
Construction tender process
Construction tender process
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
Method aluminum door & window
Method aluminum door & window
General notes to BSR BUILDING SCHEDULE OF RATES
General notes to BSR BUILDING SCHEDULE OF RATES
Civil Engineering Project Proposal PowerPoint Presentation Slides
Civil Engineering Project Proposal PowerPoint Presentation Slides
Preparation of boq
Preparation of boq
Construction contracts docuements_08092008
Construction contracts docuements_08092008
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
Taking off qs
Taking off qs
Preparation of bill sandeep
Preparation of bill sandeep
Assignment - FIDIC Contract
Assignment - FIDIC Contract
Construction phases
Construction phases
Viewers also liked
Submittal -User Manual
Submittal -User Manual
Niyas Sulaiman
SHOP DRAWINGS
SHOP DRAWINGS
JO ANN JOHNSON
PM : Shop Drawings
PM : Shop Drawings
Todd Wyatt
Proposal for The Woodlands at San Marcos apartment complex
Proposal for The Woodlands at San Marcos apartment complex
Brad Rollins
IPv6 Deployment in Europe
IPv6 Deployment in Europe
RIPE NCC
Sethulakshmi
Sethulakshmi
sethulakshmi shaji
Best Link building techniques of 2016
Best Link building techniques of 2016
Ally Digital Media
Submittal Exchange: Transportation and Civil Construction
Submittal Exchange: Transportation and Civil Construction
Brad Brown
Safety and health in constrcution
Safety and health in constrcution
YAWAR HASSAN KHAN
Earned Value Management - Intent 32 Guidelines Summary
Earned Value Management - Intent 32 Guidelines Summary
Muhammad El-Chammakh , PMP , PMI-SP
WBS PROJECT
WBS PROJECT
nurliyana Bakar
Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management Process
Dhawal Thakkar PMP
Shop Drawing Review
Shop Drawing Review
EllieNowels
Wbs For Building Project
Wbs For Building Project
project management
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
Anne Arundel Community College
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)
Lamdade Akhil
Building Construction
Building Construction
Wilden How
project on construction of house report.
project on construction of house report.
Hagi Sahib
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
mbrsalman
Basic blueprint reading
Basic blueprint reading
James Shearer
Viewers also liked
(20)
Submittal -User Manual
Submittal -User Manual
SHOP DRAWINGS
SHOP DRAWINGS
PM : Shop Drawings
PM : Shop Drawings
Proposal for The Woodlands at San Marcos apartment complex
Proposal for The Woodlands at San Marcos apartment complex
IPv6 Deployment in Europe
IPv6 Deployment in Europe
Sethulakshmi
Sethulakshmi
Best Link building techniques of 2016
Best Link building techniques of 2016
Submittal Exchange: Transportation and Civil Construction
Submittal Exchange: Transportation and Civil Construction
Safety and health in constrcution
Safety and health in constrcution
Earned Value Management - Intent 32 Guidelines Summary
Earned Value Management - Intent 32 Guidelines Summary
WBS PROJECT
WBS PROJECT
Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management Process
Shop Drawing Review
Shop Drawing Review
Wbs For Building Project
Wbs For Building Project
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 2
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)
Building Construction
Building Construction
project on construction of house report.
project on construction of house report.
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
Basic blueprint reading
Basic blueprint reading
Similar to The Importance Of The Construction Submittal Process
7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process
arananeust
What to Look for When Hiring a Structural Engineer.pptx
What to Look for When Hiring a Structural Engineer.pptx
A Step In Time Structural Engineers
130125.PROCESS DIAGRAM
130125.PROCESS DIAGRAM
Jim E Kelly AIA
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction Documents
Galala University
Matrix207
Matrix207
jbonvier
Construction terminologies
Construction terminologies
Sandya Devarajan
03 Architectural Job Phases
03 Architectural Job Phases
Douglas Vail
MODULE 5.pptx
MODULE 5.pptx
NithyaPotterhead
Final building-team
Final building-team
Zheng Chee Cham
Final building-team
Final building-team
Zheng Chee Cham
professional services and value engeneering
professional services and value engeneering
Abdo Jamous El Jamous
Why commissioning authority should complete commissioning checklists
Why commissioning authority should complete commissioning checklists
Olivia Wilson
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdf
CarlStevenAtencio
PP1 Project 1 Project implementation
PP1 Project 1 Project implementation
Teo Kean Hui
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
McCarthy Holdings, Inc.
The Architecture Profession
The Architecture Profession
Galala University
Construction process
Construction process
Mazen Al-Qadi
Aiab089228
Aiab089228
Cristian Parrado Herrera
Working drawing and detailing
Working drawing and detailing
Abdullahi MohammedLawal
Construction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building Code
Milton Grew
Similar to The Importance Of The Construction Submittal Process
(20)
7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process
What to Look for When Hiring a Structural Engineer.pptx
What to Look for When Hiring a Structural Engineer.pptx
130125.PROCESS DIAGRAM
130125.PROCESS DIAGRAM
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction Documents
Matrix207
Matrix207
Construction terminologies
Construction terminologies
03 Architectural Job Phases
03 Architectural Job Phases
MODULE 5.pptx
MODULE 5.pptx
Final building-team
Final building-team
Final building-team
Final building-team
professional services and value engeneering
professional services and value engeneering
Why commissioning authority should complete commissioning checklists
Why commissioning authority should complete commissioning checklists
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdf
PP1 Project 1 Project implementation
PP1 Project 1 Project implementation
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
The Architecture Profession
The Architecture Profession
Construction process
Construction process
Aiab089228
Aiab089228
Working drawing and detailing
Working drawing and detailing
Construction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building Code
More from Safe Rise
Nfpa standards directory 2016
Nfpa standards directory 2016
Safe Rise
Parking page-handout-graphic
Parking page-handout-graphic
Safe Rise
World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010
Safe Rise
World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1
Safe Rise
Emvchipcard flyer
Emvchipcard flyer
Safe Rise
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207
Safe Rise
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206
Safe Rise
New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205
Safe Rise
New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204
Safe Rise
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202
Safe Rise
New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201
Safe Rise
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104
Safe Rise
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103
Safe Rise
New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102
Safe Rise
New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101
Safe Rise
Mentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common Mistakes
Safe Rise
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
Safe Rise
Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...
Safe Rise
2014 Truth About Real-Time Marketing
2014 Truth About Real-Time Marketing
Safe Rise
Ag# 342 yeung residence - child bedroom
Ag# 342 yeung residence - child bedroom
Safe Rise
More from Safe Rise
(20)
Nfpa standards directory 2016
Nfpa standards directory 2016
Parking page-handout-graphic
Parking page-handout-graphic
World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010
World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1
Emvchipcard flyer
Emvchipcard flyer
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101
Mentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common Mistakes
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...
2014 Truth About Real-Time Marketing
2014 Truth About Real-Time Marketing
Ag# 342 yeung residence - child bedroom
Ag# 342 yeung residence - child bedroom
Recently uploaded
guest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssss
NadaMohammed714321
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
1508 A/S
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
neelspinoy
world health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbb
preetirao780
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
Nitish292041
Niintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptx
KevinYaelJimnezSanti
Karim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 ppppppppppppppp
NadaMohammed714321
Piece by Piece Magazine
Piece by Piece Magazine
CharlottePulte
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
yrolcks
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
zdzoqco
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
AayushChavan5
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing services
Iconic global solution
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
LucyBonelli
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptx
marckustrevion
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
Rishabh Aryan
Pearl Disrtrict urban analyusis study pptx
Pearl Disrtrict urban analyusis study pptx
DanielTamiru4
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
JIT KUMAR GUPTA
The spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenology
Christopher Totten
guest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssss
NadaMohammed714321
Interior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project Studio
RMG Project Studio
Recently uploaded
(20)
guest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssss
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
AI and Design Vol. 2: Navigating the New Frontier - Morgenbooster
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
world health day 2024.pptxgbbvggvbhjjjbbbb
world health day 2024.pptxgbbvggvbhjjjbbbb
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
Unit1_Syllbwbnwnwneneneneneneentation_Sem2.pptx
Niintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptx
Karim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 ppppppppppppppp
Piece by Piece Magazine
Piece by Piece Magazine
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
怎么办理英国Newcastle毕业证纽卡斯尔大学学位证书一手渠道
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
Iconic Global Solution - web design, Digital Marketing services
Iconic Global Solution - web design, Digital Marketing services
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
General Knowledge Quiz Game C++ CODE.pptx
General Knowledge Quiz Game C++ CODE.pptx
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
Pearl Disrtrict urban analyusis study pptx
Pearl Disrtrict urban analyusis study pptx
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
The spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenology
guest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssss
Interior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project Studio
The Importance Of The Construction Submittal Process
1.
Submittals are those
shop drawings, product data, samples, and mock-ups to be delivered to the design profes- sional (the architect or engineer) for review and action as required by the contract documents. Various types of submittals are part of the construction process. These include action submittals, informa- tional submittals, those furnished as part of project closeout, and those that are considered maintenance material. An important element of the submittal process is the prepa- ration, review, and approval of shop drawings. The American Institute of Architects (AIA) defines shop draw- ings as follows: Shop drawings: Drawings, dia- grams, schedules, and other data specifically prepared for the work by the contractor or a sub-contractor, manufacturer, supplier, or distribu- tor to illustrate some portion of the work. The purpose of shop drawings is to enable the design professional to secure graphic representation from the general contractor as to how the installing contractor intends to complete a portion of the work, prior to proceeding, for which submittals are required. The submittal process begins for the design professional during the preparation of technical specifica- tions. Identifying the types of sub- mittals that are required within the project manual is just the beginning of the submittal process. Master guide specifications, along with manufacturer’s specifications may enumerate a list of submittals that could be furnished for each division of work. It is the responsibility of the design professional to review that list of potentially required submittals to determine those germane to the spe- cific project. It is important to evalu- ate which submittals are necessary and appropriate to ensure sufficient coordination during construction. As a project enters the construction phase, the responsibility for process- ing shop drawings and other submit- tals is often delegated to a junior as- sociate as an administrative function. This important review process should be managed by someone familiar with the project and also knowledge- able of the type of construction for which submittals may be reviewed. A general contractor is typically required to prepare a schedule of submittals. Similarly, the design pro- fessional should document, through their submittal log book, a list of those required submittals specified in each section within the project manual. Completing this task prior to the start of construction will enable the design professional to accurately track the status of submittals during the construction phase. Problems may be manifested and a design professional may face liabil- ity if a project proceeds without the required shop drawings having been submitted or with shop drawings that contain errors. In both situations, the design professional’s compliance with the standard of care might be questioned. If a specific aspect of the project was incorrectly illustrated on a shop drawing or if the design deviated from specified requirements, and it has been accepted by the design profes- sional, compliance with the standard of care may again be questioned. The Importance Of The Construction Submittal Process 800.813.6736 | www.robsonforensic.com Ronald P. Bertone, FAIA, FACHA, NCARB © 2015 Robson Forensic, Inc.
2.
If a submittal
is made containing revisions in order for the specified aspect of the project to comply with the construction documents, those deviations must be identified and approved by the design professional prior to the contractor proceeding with that aspect of construction. It is important to understand that shop drawings are not contract doc- uments. However, the requirements with regard to requiring them and the design professional’s interaction with them, may reflect the standard of care. Section 3.12.4 of AIA Document A-201-2007 states: Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. Their purpose is to demonstrate the way in which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents for those portions of the Work for which the Contract Documents require submittals. Another section within the AIA General Conditions, relevant to the design professional, as part of the submittal process is Article 3.12.10. This addresses those portions of the project, not designed by the architect that will require the preparation of shop drawings by another licensed professional. If professional design services or certifications by a design profes- sional related to systems, materi- als or equipment are specifically required of the Contractor by the Contract Documents, the Owner and the Architect will specify all performance and design criteria that such services must satisfy. The Contractor shall cause such ser- vices or certifications to be provid- ed by a properly licensed design professional, whose signature and seal shall appear on all drawings, calculations, specifications, cer- tifications, Shop Drawings, and other submittals prepared by such professional. Shop Drawings and other submit- tals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional’s written approval when submitted to the Architect. The Owner and the Architect shall be entitled to rely upon the ade- quacy, accuracy, and completeness of the services, certifications and approvals performed or provid- ed by such design professionals, provided the Owner and Architect have specified to the Contractor all performance and design criteria that such services must satisfy. Pursuant to this Section 3.12.10, the Architect will review, approve or take other appropriate action on submittals only for the limited pur- pose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Con- tractor shall not be responsible for the adequacy of the performance and design criteria specified in the Contract Documents. If the architect specifies that engi- neered shop drawings are required, and if they are to be certified by an- other design professional, the archi- tect of record has the responsibility to review and take appropriate action for the limited purpose of checking for conformance with the design con- cept. Failure to do so may expose the architect to additional risk. The Architect of Record should require certification from this sec- ond design professional to establish that the work designed by this other professional complies with the de- sign intent of his project documents. Certifications related to codes and standards, structural capabilities, etc., should also be considered. The submittal review process pro- vides important system of checks and balances during the construction phase of a project. The purpose is to ensure that the end result con- forms to the design intent depict- ed in the construction documents and meets the expectations of the owner. During the pre-construction conference, it is important for the owner, architect and contractor to gain a clear understanding as to the roles and responsibilities of those tasked with implementing the sub- mittal process. This process involves significant potential risk which must be properly managed. During the pre-construction meeting, applicable contract provisions should be read, discussed, and documented as hav- ing been reviewed. Ronald P. Bertone, FAIA, FACHA Architect rbertone@robsonforensic.com Through his architectural experience and professional credentials, Ron Bertone provides technical investi- gation and expert analysis on legal cases that include evaluating com- pliance with the applicable standard of care, construction defects, code compliant construction, and other building or professional service claims. Ron is a Licensed Architect in more than ten states, is certified by the National Council of Architectural Registration Boards, served on the AIA National Ethics Council, and has been elevated to Fellowship by the American Institute of Architects and the American College of Healthcare Architects. 800.813.6736 | www.robsonforensic.com © 2015 Robson Forensic, Inc.
Download now