Renovations and Additions to
Chapin High School

Revised Dec. 2013
C Building
300 Series
D Building
400 Series
A Building
100 Series

B Building
200 Series

E Building
500 Series
Teacher Classroom Assignments –Revised Dec. 2013

Mind the GAP
Science Labs

Mind the GAP

We are very excited about the new
science facilities. Science teachers will
have new classroom...
New Areas

Mind the GAP

The Eagle Walk is the walkway
behind the school. Students are to
access the school from behind th...
Pre-Bid Presentation 10.04.2011
Pre-Bid Presentation 10.04.2011
Construction Update January 2014
Construction Update January 2014
Construction Update January 2014
Construction Update January 2014
Upcoming SlideShare
Loading in...5
×

Construction Update January 2014

99,357

Published on

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
99,357
On Slideshare
0
From Embeds
0
Number of Embeds
14
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Construction Update January 2014"

  1. 1. Renovations and Additions to Chapin High School Revised Dec. 2013
  2. 2. C Building 300 Series D Building 400 Series A Building 100 Series B Building 200 Series E Building 500 Series
  3. 3. Teacher Classroom Assignments –Revised Dec. 2013 Mind the GAP
  4. 4. Science Labs Mind the GAP We are very excited about the new science facilities. Science teachers will have new classrooms in addition to chemistry storage and labs.
  5. 5. New Areas Mind the GAP The Eagle Walk is the walkway behind the school. Students are to access the school from behind the building. The new outdoor courtyard.
  6. 6. Pre-Bid Presentation 10.04.2011
  7. 7. Pre-Bid Presentation 10.04.2011
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×