Build Operate transfer Model
Get Solar Power Plant in Just 10% of Project Cost
Build Operate Own Transfer – B.O.O.T models
(INDICATIVE PRICING ONLY)
A. Size of plant – 50 KW to 500 KW grid connected models only – we do not offer BOOT model for Battery systems (but can discuss on case to case if customer is ready to invest in batteries)
B. Company for BOOT has to be a Financially sound company with very good business establishment – last 2 years audited balance sheet with company / group profile is must.
C. 12 Months power consumption calculated monthly as advance deposit
D. All investment for power plant made by us.
E. Power purchase agreement (PPA) for 10 years
F. Rate per unit will vary from Rs. 6.5 ~ Rs. 8.5* per unit depending on customer profile – will be offered in our term sheet. (* may be negotiable depending on investor)
G. Price escalation would be between 4 ~ 6% for every 18 ~ 36 months – as will be offered in our term sheet.
H. At the end of 10 years or end of PPA term, the solar plant will be transferred free of cost to the customer.
I. Client approval totally at our discretion.
J. If system is Roof mounted then roof strengthening if required will be to clients account.
K. If evacuation is required for Grid, that will be to clients account.
L. Security of system is client's responsibility.
M. Buyback of system is available anytime after minimum of 5 years.
N. Advance Payment 10% out of 1st month power price is must
1. LOBEL SOLAR POWER SYSTEM
Set up Solar PV Power Projects at
Nil Capital Investment. Lease your
Rooftops for fixed term period and
enjoy cheap, green, reliable,
constant & independent Power for
up to 25 years.
SOLAR PV
POWER
PROJECTS
Under BOOT Model
LOBEL Solar Power System
“65 Lobel House”, O P Road, Vadodara
Gujarat M: +91 9327007854
www.lobelpower.com
info@lobelpower.com
2. LOBEL SOLAR POWER SYSTEM
_____________________________________________________________________________________________________________________
Setting up Grid Connected Solar PV Power Plants ranging from 50 KW to MW scale power projects
under the Build, Operate, Own and Transfer (BOOT) Model
HOW THIS HAPPEN? PROJECT VIABILITY FOR ROOTOP OWNERS:
Rooftop Lease: We utilize vacant
Rooftop spaces and set up a Solar PV
Power plant at our own Cost.
Captive Consumption: All power
generated from the Solar Plant is fed
into the LT panel and is 100% utilized.
Power Purchase Agreement (PPA): We
sign a PPA with the Rooftop Owner
and sell the power on monthly cycle for
a fixed term period.
Operation & Maintenance: We maintain
the entire plant and station our team at
site at our own costs and expense for
the entire term.
Rooftop Owners enjoy cheaper
power than their current power tariffs
& cost including the use of DG sets.
Getting rid of Power Tariff Escalations
and inflation risks.
Buy back the project on the 15th
or 20th
year at depreciated value and enjoy
free power for the remaining life of the
system which is expected to be 35
years.
Nil Capital Investment required.
Comply with your Renewable
Energy Purchase Obligations and
reduce Carbon footprints.
HIGHLIGHTS:
Technology: Solar Photovoltaic (PV)
Grid-Connected System {Solar + Grid}System Design:
Total rooftop area required 8,800 square feet per 100KW setup
Proposed Solar Panels (PV): 230 to 320 watt | Poly Crystalline
AAA Rated with Module efficiency higher than 15.8%
Solar Inverter: 100KW Tier I Multiple Sting Inverters, 3 phase
Maximum output efficiency at 98%
Estimated Annual Energy Generation: 150,000 kWh in the first year for every 100KW
System. (Leverage of + 10%)
Within Four (4) monthsProject Completion tenure:
3. LOBEL SOLAR POWER SYSTEM
_____________________________________________________________________________________________________________________
GENERAL CONDITIONS OF CONTRACT:
Complete Project cost borne by: LOBEL OR OTHER FINANCIAL INSTITUATION
Rooftop Right to Lease Rooftop Owner shall provide the Right to Use of the
rooftop to LOBEL for the fixed term period from the
date of handing over the project.
Meter Accounting Based on the Data logs (which accounts every unit
of power supplied) LOBEL shall raise the bill on the 1st
date of every English calendar month. A separate
meter may also be installed to verify the actual
power supplied.
Billing For all the kW/h of power supplied from the solar
plant, hospital shall pay the said dues to LOBEL on or
before 4th
date of every English Calendar month
failing which there shall be a penalty of 2% per
month levied to the Rooftop Owner.
The PPA shall be valid for the fixed lock in period.Termination of the PPA
LOBEL may terminate the said agreement. However,
the condition wherein PPA may be terminated by the
Rooftop Owner is after it compensates LOBEL for the
estimated power generation p.a. for the balance
number of years i.e. term; in accordance with the
defined power rates in the PPA.
Bank Guarantee Lobel shall require a revolving Bank Guarantee of the
amount equaling to the estimated power generation
on yearly basis.
Inverter replacement On Part of Lobel
Replacement of any defective equipment On part of Lobel
during the Term:
Operation & Maintenance of the Plant On part of Lobel
Installation of 3 Phase meter / sub-Meters By Rooftop Owner
and all other necessary wirings from the
Distribution point.
4. LOBEL SOLAR POWER SYSTEM
_____________________________________________________________________________________________________________________
PPA TARIFFS AND ESCLATION RATES:
Based on a through feasibility and viability study, we have drawn down the PPA tariffs depending
on case to case basis; under which the financial modeling of the project is proposed for the Rooftop
Owner:
Schemes will be as per discussion and finalization.
PPA tariffs ranging from INR 6/kWh to INR 8/kWh
PPA term ranging from 10 years to 15 years
Power Tariff escalation cycle from 5% to 15% every year