Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
145
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Welcome toLivelihood Enhancement Through Diversion Based Irrigation Projects
  • 2. Progress summary: Till December 2010 (Gravity flow system supported by JTT)• Total No. of schemes: 14• Budget:• Dharmagarh: – March 2009- February 2010 (4 Nos of DBI) Total budget- 976900.00• Bissamcuttack: – March 2009- February 2010 (4 Nos of DBI) Total budget-744000.00 – April 2010– March 2011(6 Nos of DBI) Total Budget- 2123800.00• 9 schemes completed, another 5 are in progress• Water being used for SRI, Vegetable and WADI• Labour component is contributed by the community
  • 3. Physical-Financial Progress GolamundaVillage Total Total Nos of Total ayacut Remarks expendit communit beneficia area ure y ries Kharif Rabi (JTT) contributi (Acres) (Acres on )Gadlajharan 263400 71400 22 30 20 completedDhamanpur 265500 72000 18 25 20 completedKhasiguda 202500 54000 22 30 22 completedBhandarkachar 245500 66000 14 40 20 completedTotal 976900  263400  76  125  82  
  • 4. Physical-Financial Progress Bissamcuttack Village Total Total Nos of Total ayacut area Remarks expendit communi beneficiari Kharif Rabi ure ty es (Acres) (Acres) (JTT) contribut ionFor the year 2009-10Baladagud 146656. 24300. 43 30 10 completedaKachapaju 182652. 28700. 45 25 12 completedMajhialma 197184. 22000. 40 20 8 completedLakhabhat 164434. 27300. 27 40 15 completedaBranch 9599.00          Admn expTotal 700525.    155  115  45  For the year 2010-11Ankulpada 228110.00 24,400. 43 60 25 completedr
  • 5. Utilization (during 2010) GolamundaActivities Gadlajharan Dhamanpur Khasiguda BhandarkacharLand 5 12 7 0development(Acre)Crop taken SRI paddy in 7 Transplanted SRI paddy in 2 SRI in 7 acresduring kharif acres, paddy in 20 acres and and saved 10 transplanted acres. transplanted acres of kharif paddy in 13 paddy 20 acres paddy. acres.Crop coverage Paddy 7 acres Vegetables in Paddy in 4 No crop asin Rabi and g.nut in 2 1 acre acres of land there is no acres water .  Other means of No No No Domestic usewater use
  • 6. Utilization (during 2010) BissamcuttackActivities Baladagud Kachapaju Lakhabhata Majhihalma Rema a rksLand 7 acres 4 acres  developmentCrop taken Paddy in 4 acres covered Maize in 12 Paddy and  during kharif 7 acres under (wadi), acres vegetable. vegetable in 1 acrsCrop Vegetable Vegetables in Vegetable Vegetable  coverage in cultivation homestead land cultivation. cultivationrabi in 1 acre in 2 acres.Other means Domestic Domestic use, Domestic Domestic  of water use use bathroom use use
  • 7. OVERALL IMPROVEMENTS DURING THE PROJECT• Water for Domestic Use• Land Development• Protective Kharif Irrigation and Improved paddy cultivation• Initiation of cultivation during Rabi• Model for replication by line department
  • 8. Challenges faced during Implementation• In the rocky layer it is almost impossible to maintain 3ft depth of pipe lying. Blasting of rocky layer was done to lay the pipes.• For the construction of the intake structure, all the materials like sand, chips, cement and rods are manually transported to the construction site from the bottom of the hill which is very labour intensive.• Demand from nearby Villages. But these villages are almost inaccessible and professionals cannot go to these villages frequently for crop planning and capacity building.• Naxalites are also a threat for implementing such schemes
  • 9. THANK YOU