Your SlideShare is downloading. ×
The right way to manage your Test Automation project
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

The right way to manage your Test Automation project

293
views

Published on


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
293
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. TTM methodologyThe right way to manage your Testing Automation projects
  • 2. Testing Automation projects - life cycle Common life cycle 1 Purchase the tool 2 Recruit developers 3 Understand ROI 4 Fail to implement TTM – life cycle Analyze the systems Recruit developers Follow TTM 1 2 3 Understand ROI 4 Purchase the tools and managers methodology
  • 3. Testing Tools Management Methodology
  • 4. ?Why Do We FailWe have the best people and the besttools but still many projects are failing management expectations
  • 5. What is our managementexpectation •Testing Automation ROI •Coverage •Resource saving •Shortening execution period •Testing Automation usage
  • 6. How to build Testing Automation ROI-input parameters Age of the product Releases planned for a year Required regression cycle per year Number of existing regression test cases Number of configurations to be tested Cost of the testing resources Infrastructure cost Test automation tool cost Percentage of test cases that can be considered for automation Time required for building reusable components, automation frameworks and batch scripts Hourly cost per test automation resource
  • 7. Testing Automation ROI – Points of benefit 3
  • 8. Testing Automation ROI – Calculator 3 Microsoft Excel 97-2003 Worksheet
  • 9. Testing Automation Readiness 4• Developers• Stable environment• Understand business process• Tools readiness• Testing Automation environment readiness• Developers understand the project scope• Set expectation
  • 10. 4 Testing Automation Stages• Sanity SET – Set of ~50 QTP scripts, verify that new build (version) ready for massive testing process• Quick ROI Developments – Packages can retrieve the investment immediately (e.g. API, data driven, data inflation)• Regression by modules So important to make sure NOT to develop all regression tests in one SET, “Before moving forward with the development stage, we need to analyze our system and divide it by modules, for each module to develop his own automation SET”• Data Inflation – Using our GUI interface can help with massive data changes
  • 11. 4 Why Do We Fail con’tHow to succeed with your testing automation project using the TTM•Understand the application and thedevelopment process• Management support (not enough)• High expectations for immediate ROI– Underestimating the time, cost and effort for the initial introductionand implementation of a tool (e.g. training, external expertise andchanges to the testing process).– Underestimating the effort required to maintain the test scripts and toolupdates
  • 12. 4 Testing Tools Management Progress• Define the project scope• Follow up• Testing Automation methodology• Summary
  • 13. 4 Define the Project Scope• High Level Design (Test Plan) – The document contains the Set we are about to automate, the concept of automation, verification points, parameters, etc…
  • 14. (Define the Project Scope (Con’t 4• Design (Test cases QC) – Test cases developed in QC cover all required area in the application
  • 15. (Define the Project Scope (Con’t 4• Estimation module – A tool can assist to understand how many working days we need for the project, include all required steps: – Testing priority – All Automation steps – Risk factor
  • 16. (Define the Project Scope (Con’t 4• Work plan – Following the estimation module solution the exact work plan by days
  • 17. 4 Follow Up• Test Cases list
  • 18. 4 (Follow Up (Con’t- Work Plan
  • 19. Testing Automation Methodology• QTP Standard and Guidelines 4 – Documents introduces basic guidelines and code methods for scripting via QTP. The document describes all acceptable practices to develop in QTP:
  • 20. Testing Automation Methodology 4 ((Con’t• Code inspection – All of the inspectors to reach consensus on a work – Product and approve it for use in the project
  • 21. 4 Execution Daily reports No. Estimated No. of TA SET of Status Executer time to SET Log PATH Defect # Comments errors/failure TC’s completeBI 182 FAIL Dotan 2 WD Link to BI Report Till today covered 50 TC’sAPI Interaction 18 3 PASS 3 WH Link to API Interaction report Yesterday Configuration issues Tali defects closeAPI Application 19 1 PASS Irmi 1WH Link to Application API Testing automation errorsAPI Application 49 1 PASS Irmi 1WH Link to Application API_1Ticketing 46 2 PASS Dotan 1 WH Link to Ticketing report Analyze by DotanEMT 18 2 PASS Dotan 1 WH Link to EMT reportA2A 10 PASS Dotan 30 Min Link to A2A reportVoice 12 1 PASS Tali 3H Link to Voice Report Testing automation errorsSanity 14 1 PASS Lior 45 Min Link to Sanity reportJT 17 8 FAIL 1 WH Link to JT Report Analyzed by Dotan Tali Link to JT Report_1Reports 53 17 PASS Tali 1 WH Link to Reports log Data issues need to be fixed!!!
  • 22. Execution Daily reports # of Module written Testing coverage # of pass TCs # of fail TCs FAIL TCs TCs # % # % # % 200BI 182 20 11 10 50 10 50API Interaction 18 18 100 18 100 0 0 180API Application 68 68 100 66 97 2 3 160Ticketing 46 46 100 40 87 6 13EMT 28 18 64 15 83 13 72 140A2A 10 10 100 10 100 0 0 120Voice 11 11 100 11 100 0 0 # of written TCsSanity 14 14 100 12 86 2 14 100 C T o # of fail TCs s #JT 17 17 100 17 100 0 0 f 80Report 53 53 100 40 75 13 25 60 40 Coverage BI 20 API Interaction 200 0 API Application Ticketing 180 EMT 160 A2A Voice 140 Sanity JT 120 Report # of wri tten TCs 100CTo Testing coverages# PASS TCsf 80 FAIL 60 200 BI API Interaction 40 180 API Application 20 Ticketing 160 EMT 0 140 A2A Voice 120 Sanity # of written TCs 100 JT C T o # of pass TC s Report s # f 80 60 40 20 0
  • 23. Summary Development Stage 4 Follow TTM• Final Report methodology • A document contains all project steps include: • Test case list • Testing automation coverage • Functions • Folder where script • How to execute the SET • Result example
  • 24. (Summary Development Stage (Con’t m• Code Freeze – A process to save all developed code under one place. (With a limited access)