Coyote Complex

436 views
407 views

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
436
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Coyote Complex

  1. 1. COYOTE COMPLEX <ul><li>HOME OF THE COYOTES </li></ul><ul><li>MEN AND WOMEN’S BASKETBALL AND VOLLEYBALL </li></ul>
  2. 2. Over view map Overview Map & Parking
  3. 3. Exterior View <ul><li>A Cross Between </li></ul>
  4. 4. Coyote Arena
  5. 5. INTERIOR VIEW <ul><li>A Cross Between </li></ul>Seats 7,000
  6. 6. Stadium Seating <ul><li>Features and Benefits ・ </li></ul><ul><li>Raid Mounted Design offering flexible seating spacing Easy to clean with tough textured surface </li></ul><ul><li>Quick to install with low maintainence requirement </li></ul><ul><li>High Impact Seat Numbering </li></ul>
  7. 7. <ul><li>This attractive locker has a rich finish with sculpted sides and a comfortable cushioned seat, which lifts to reveal a spacious yet hidden storage nook. </li></ul>
  8. 8. Coyote Complex
  9. 9. OFFICES
  10. 10. Training Rooms
  11. 11. Concessions
  12. 12. Suites <ul><li>Suites </li></ul>The Luxury The View
  13. 13. Restrooms <ul><li>Sleek and Functional </li></ul>
  14. 14. Phases <ul><ul><li>Phase I - Foundation Stage </li></ul></ul><ul><li>Site Survey - Excavation & pad leveling - Foundation pinned, and framed - Underground utilities installed </li></ul><ul><li>Sewer or septic lines installed - Vapor barrier installed - Municipal Inspection - Foundation Poured </li></ul><ul><ul><li>Phase II - Framing Stage </li></ul></ul><ul><li>Frame all walls and trusses - Install roof sheathing - Municipal framing inspection </li></ul><ul><ul><li>Phase III - Roofing Stage </li></ul></ul><ul><li>Install exterior sheathing - Install shingles / roofing system - Install all windows - Install exterior doors </li></ul><ul><li>Phase IV - Pre-Sheetrock Stage </li></ul><ul><li>Begin installation of exterior finish (masonry, wood, etc) - Rough-in plumbing; water & waste vent piping </li></ul><ul><li>Rough-in mechanical systems; venting and furnace installation - Rough-in wiring & electrical </li></ul><ul><li>Install HVAC & plumbing system - Install water heater - Municipal inspections for mechanical, plumbing, electrical, & frame </li></ul><ul><ul><li>Phase V - Sheetrock Stage </li></ul></ul><ul><li>Install wall insulation - Install sheetrock - Install tape & texture; apply wall & ceiling textures </li></ul><ul><li>Sheetrock nail/screw inspection (if applicable) </li></ul>
  15. 15. Phases Con’t <ul><ul><li>Phase VI - Interior Trim Stage </li></ul></ul><ul><li>Install all interior doors and moldings - Install staircase balusters & railings (if applicable) </li></ul><ul><ul><li>Phase VII - Painting, Cabinets, & Countertops Stage </li></ul></ul><ul><li>Paint installation (interior) - All cabinetry installed - All countertops installed - All wall tile installed </li></ul><ul><li>Install all mirrors and shower enclosures </li></ul><ul><ul><li>Phase VIII - Flooring Stage </li></ul></ul><ul><li>Install finish electrical - Install finish plumbing - Install finish mechanical - HVAC installed and tested </li></ul><ul><li>Install all flooring - Appliances installed - Install Flat Work - driveways, sidewalks </li></ul><ul><li>Final mechanical, plumbing, electrical municipal inspections - Municipal &quot;Certificate of Occupancy&quot; issued </li></ul><ul><ul><li>Phase IX - Quality Assurance Stage </li></ul></ul><ul><li>Final Municipal inspection - Ceiling insulation installed - Builder's Quality Assurance Inspection </li></ul><ul><li>Punch List Development - Exterior landscaping completed - Final Cleaning - Final Buyer's Walk-Through </li></ul><ul><ul><li>Phase X - Buyer Acceptance Stage </li></ul></ul><ul><li>Home Buyers Inspection - Completion of Punch List items - Final Buyer's Walk-Through </li></ul><ul><li>Contract items installation review - New Home Orientation </li></ul>

×