Florence School of RegulationGrid connection of offshore wind farmsFSR Webinar SeriesFlorence, 25 September, 2012Leonardo ...
Grid connection of offshore wind farmsWhy this topic? … the buzz    http://think.eui.eu                             2
Grid connection of offshore wind farmsWhy this topic? … EU contextOffshore wind technology• Expected to increase from 3 GW...
Grid connection of offshore wind farmsWhy a webinar?   http://think.eui.eu                          4
Grid connection of offshore wind farmsWebinar focusWho should design and develop thegrid connection?Who should pay for the...
First poll: Who should design and develop the grid connectionof offshore wind farms? “choose a statement”• A: Transmission...
1. Who should design and develop the connection?OnshoreConnection regime• First-come-first-servePrinciples• Planning  lim...
1. Who should design and develop the connection?Increasing cost and technology uncertainties (THINK, 2012)                ...
1. Who should design and develop the connection?Offshore wind farms in Germany (THINK, 2012)                              ...
1. Who should design and develop the connection?Germany offshoreConnection regime• Connection obligationPlanning• Offshore...
1. Who should design and develop the connection?Offshore electricity plugs (Tennet)    http://think.eui.eu                ...
1. Who should design and develop the connection?Offshore electricity plugs (Elia homepage)    http://think.eui.eu         ...
1. Who should design and develop the connection?Offshore electricity plugs (ABB, Borwin alpha)    http://think.eui.eu     ...
1. Who should design and develop the connection?Offshore wind farms in Sweden (THINK, 2012)                               ...
1. Who should design and develop the connection?Sweden offshoreConnection regime• Generators design and develop their conn...
1. Who should design and develop the connection?Offshore wind farms in the UK (THINK, 2012)                               ...
1. Who should design and develop the connection?Offshore wind farms in the UK (National Grid, 2011)    http://think.eui.eu...
1. Who should design and develop the connection?UK model for offshore (Martin Crouch, 2011)Connection regime• Offshore Tra...
1. Who should design and develop the connection?UK model for offshoreConnection regime• Offshore Transmission Owners (OFTO...
First poll: Who should design and develop the grid connectionof offshore wind farms? To sum up Alternative models       A)...
First poll: Who should design and develop the grid connectionof offshore wind farms? To sum up Alternative models       A)...
First poll: Who should design and develop the grid connectionof offshore wind farms? To sum up Alternative models       A)...
Second poll: Who should pay for the grid connection ofoffshore wind farms? “choose a statement”• A: Offshore wind farm dev...
2. Who should pay?Example (Auer, 2007)    http://think.eui.eu                          24
2. Who should pay?Deep charges   http://think.eui.eu                         25
2. Who should pay?Shallow charges    http://think.eui.eu                          26
2. Who should pay?Super shallow charges    http://think.eui.eu                          27
2. Who should pay?Assessing current practiceImportance of having a price signal          Relevance offshore•   Decision to...
Second poll: Who should pay for the grid connection ofoffshore wind farms? To sum up            E.g.          Germany     ...
Third poll: Who should be the regulator for the grid connectionof offshore wind farms? “choose a statement”• A: National r...
3. Who should be the regulator?Kriegers Flak    http://think.eui.eu                          31
3. Who should be the regulator?Standalone solution    http://think.eui.eu                          32
3. Who should be the regulator?Combined solution   http://think.eui.eu                         33
3. Who should be the regulator?Problems due to not aligned national regulatory frameworks                                 ...
3. Who should be the regulator?Future could bring many more Kriegers Flak type of offshore grid projects     http://think....
Grid connection of offshore wind farmsAnswers to the three questionsWho should design and develop the          What matter...
Florence School of RegulationThank you very much for your attentionleonardo.meeus@eui.euhttp://think.eui.eu               ...
Upcoming SlideShare
Loading in...5
×

Webinar on grid connection of offshore wind farms

679

Published on

Grids are already developing offshore, and this development will continue even though at what pace and how they will develop is still uncertain. Indeed, there are different possible configurations for a future offshore grid: it can be a simple multiplication of standalone lines that provide each a single service (either connection of generation, or connection between transmission grids); or it can be a more integrated infrastructure like an offshore meshed grid that combines and interconnects dozens of offshore lines and generation units (hereafter combined solution).

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
679
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Webinar on grid connection of offshore wind farms"

  1. 1. Florence School of RegulationGrid connection of offshore wind farmsFSR Webinar SeriesFlorence, 25 September, 2012Leonardo Meeus(Florence School of Regulation, European University Institute)THINK (http://think.eui.eu) http://think.eui.eu
  2. 2. Grid connection of offshore wind farmsWhy this topic? … the buzz http://think.eui.eu 2
  3. 3. Grid connection of offshore wind farmsWhy this topic? … EU contextOffshore wind technology• Expected to increase from 3 GW to about 40 GW by 2020 in EuropeOffshore grid connection• Tennet is investing 6 billion to connect offshore wind in North Germany• The UK is expected to invest 6-10 billion pounds http://think.eui.eu 3
  4. 4. Grid connection of offshore wind farmsWhy a webinar? http://think.eui.eu 4
  5. 5. Grid connection of offshore wind farmsWebinar focusWho should design and develop thegrid connection?Who should pay for the gridconnection?Who should be the regulator for thegrid connection? http://think.eui.eu 5
  6. 6. First poll: Who should design and develop the grid connectionof offshore wind farms? “choose a statement”• A: Transmission System Operator (TSO)• B: Offshore wind farm developers (Generators)• C: Tender (Third parties) http://think.eui.eu 6
  7. 7. 1. Who should design and develop the connection?OnshoreConnection regime• First-come-first-servePrinciples• Planning  limited• Element of competition  noImportance of the principles• Onshore: limited• Offshore: important http://think.eui.eu 7
  8. 8. 1. Who should design and develop the connection?Increasing cost and technology uncertainties (THINK, 2012) 400 HVAC 350 HVDC VSC 300 MVAC 250 Distance (km) 200 150 100 50 0 1990 1995 2000 2005 2010 2015 2020 -50 Year Commissioned http://think.eui.eu 8
  9. 9. 1. Who should design and develop the connection?Offshore wind farms in Germany (THINK, 2012) Year Voltage (kV) Name of the Distance to Power Transmission # Country commissione wind farm shore (km) (MW) technology d 1 Alpha Ventus Germany 2010 52.5 60 110 HVAC 2 Baltic 1 Germany 2010 16 48.3 150 HVAC 3 Breitling Germany 2006 0.5 2.5 - - 4 Ems Emden Germany 2004 0.6 4.5 - - 5 HVDC BorWin 1 Germany 2009 200 400 150 HVDC VSC 6 HVDC BorWin 2 Germany 2012 200 800 HVDC VSC 7 HVDC DolWin 1 Germany 2013 330 800 320 HVDC VSC 8 HVDC HelWin 1 Germany 2013 130 576 380 HVDC VSC 9 HVDC SylWin 1 Germany 2014 205 864 HVDC VSC Total Germany 3500 http://think.eui.eu 9
  10. 10. 1. Who should design and develop the connection?Germany offshoreConnection regime• Connection obligationPlanning• Offshore electricity plugsElement of competition• No http://think.eui.eu 10
  11. 11. 1. Who should design and develop the connection?Offshore electricity plugs (Tennet) http://think.eui.eu 11
  12. 12. 1. Who should design and develop the connection?Offshore electricity plugs (Elia homepage) http://think.eui.eu 12
  13. 13. 1. Who should design and develop the connection?Offshore electricity plugs (ABB, Borwin alpha) http://think.eui.eu 13
  14. 14. 1. Who should design and develop the connection?Offshore wind farms in Sweden (THINK, 2012) Year Voltage (kV) Name of the Distance to Power Transmission # Country commissione wind farm shore (km) (MW) technology d 1 Utgrunden Sweden 2000 8 10.5 21 MVAC 2 Yttre Stengrund Sweden 2001 4 10 20 MVAC 3 Lillgrund Sweden 2007 7 110.4 130 HVAC 4 Bockstigen Sweden 1998 3 2.5 - - 5 Vanern Sweden 2009 7 30 - - http://think.eui.eu 14
  15. 15. 1. Who should design and develop the connection?Sweden offshoreConnection regime• Generators design and develop their connectionPlanning• NoElement of competition• Yes http://think.eui.eu 15
  16. 16. 1. Who should design and develop the connection?Offshore wind farms in the UK (THINK, 2012) Year Voltage (kV) Name of the Distance to Power Transmission # Country commissione wind farm shore (km) (MW) technology d 1 Beatrice UK 2007 23 10 33 MVAC 2 Blyth UK 2000 1.6 4 11 MVAC 3 Burbo Bank UK 2007 6.4 90 33 MVAC 4 Inner Dowsing UK 2009 5.9 97.2 33 MVAC 5 Kentish Flats 1 UK 2005 10.75 90 33 MVAC 6 Lynn UK 2009 5.9 97.2 33 MVAC 7 North Hoyle UK 2004 7.2 60 33 MVAC 8 Rhyl Flats UK 2009 8 90 33 MVAC 9 Scroby Sands UK 2004 2.3 60 33 MVAC 10 Barrow UK 2008 7.5 90 132 HVAC 11 Greater Gabbard UK 2008 26 504 132 HVAC 12 Gunfleet Sands UK 2010 7 172.8 132 HVAC 13 Robin Rigg UK 2010 8 180 132 HVAC 14 Thanet UK 2010 11.4 300 132 HVAC 15 Walney 1 UK 2011 14.4 183.6 132 HVAC Total UK 1478 http://think.eui.eu 16
  17. 17. 1. Who should design and develop the connection?Offshore wind farms in the UK (National Grid, 2011) http://think.eui.eu 17
  18. 18. 1. Who should design and develop the connection?UK model for offshore (Martin Crouch, 2011)Connection regime• Offshore Transmission Owners (OFTO) http://think.eui.eu
  19. 19. 1. Who should design and develop the connection?UK model for offshoreConnection regime• Offshore Transmission Owners (OFTO)Planning• More planning being consideredElement of competition• Yes• Ofgem: not only technology innovation http://think.eui.eu
  20. 20. First poll: Who should design and develop the grid connectionof offshore wind farms? To sum up Alternative models A) TSO B) Generators C) Third party Experiments with Germany Sweden UK these models Planning Element of competition http://think.eui.eu 20
  21. 21. First poll: Who should design and develop the grid connectionof offshore wind farms? To sum up Alternative models A) TSO B) Generators C) Third party Experiments with Germany Sweden UK these models Planning Element of competition http://think.eui.eu 21
  22. 22. First poll: Who should design and develop the grid connectionof offshore wind farms? To sum up Alternative models A) TSO B) Generators C) Third party Experiments with Germany Sweden UK these models Planning Element of competition http://think.eui.eu 22
  23. 23. Second poll: Who should pay for the grid connection ofoffshore wind farms? “choose a statement”• A: Offshore wind farm developer (Generator)• B: Grid users (Transmission tariffs) http://think.eui.eu 23
  24. 24. 2. Who should pay?Example (Auer, 2007) http://think.eui.eu 24
  25. 25. 2. Who should pay?Deep charges http://think.eui.eu 25
  26. 26. 2. Who should pay?Shallow charges http://think.eui.eu 26
  27. 27. 2. Who should pay?Super shallow charges http://think.eui.eu 27
  28. 28. 2. Who should pay?Assessing current practiceImportance of having a price signal Relevance offshore• Decision to locate • Constrained by concessions• Timing decision • Electricity pugsCurrent practice• Germany: super shallow charges• Sweden: shallow charges• UK: super shallow, but with locational G-component http://think.eui.eu 28
  29. 29. Second poll: Who should pay for the grid connection ofoffshore wind farms? To sum up E.g. Germany Sweden UK Planning Element of competition Price signal http://think.eui.eu 29
  30. 30. Third poll: Who should be the regulator for the grid connectionof offshore wind farms? “choose a statement”• A: National regulatory authorities• B: Regional or EU regulatory framework http://think.eui.eu 30
  31. 31. 3. Who should be the regulator?Kriegers Flak http://think.eui.eu 31
  32. 32. 3. Who should be the regulator?Standalone solution http://think.eui.eu 32
  33. 33. 3. Who should be the regulator?Combined solution http://think.eui.eu 33
  34. 34. 3. Who should be the regulator?Problems due to not aligned national regulatory frameworks • E.g. Swedish TSO is not responsible for connection of offshore wind farms • E.g. German TSO obligation makes cooperation difficult • … (THINK, 2012) http://think.eui.eu 34
  35. 35. 3. Who should be the regulator?Future could bring many more Kriegers Flak type of offshore grid projects http://think.eui.eu 35
  36. 36. Grid connection of offshore wind farmsAnswers to the three questionsWho should design and develop the What matters is to have advancedgrid connection? connection planning, and an element of competitionWho should pay for the grid Offshore wind developers should atconnection? least pay shallow chargesWho should be the regulator for the Offshore grids require collectivegrid connection? action at regional or EU level http://think.eui.eu 36
  37. 37. Florence School of RegulationThank you very much for your attentionleonardo.meeus@eui.euhttp://think.eui.eu THINK reports (published 2011 - 2012) 1) Public Support of RD&D 2) Smart Cities 3) Energy Roadmap for 2050 4) Public Budget of EU Member States 5) Offshore Grids 6) Transmission Grid Tarification 7) Building refurbishment 8) Electricity Storage Ongoing (to be published in 2013) 9) EU technology policy for 2050 10) CBA for infrastructure package http://think.eui.eu

×