Scum makes me sick | Petronella Andersson | LTG-14
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Scum makes me sick | Petronella Andersson | LTG-14

on

  • 647 views

 

Statistics

Views

Total Views
647
Views on SlideShare
501
Embed Views
146

Actions

Likes
0
Downloads
2
Comments
0

1 Embed 146

http://leantribe.org 146

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Scum makes me sick | Petronella Andersson | LTG-14 Presentation Transcript

  • 1. Petronella AnderssonHead of NSPS R&DNational Security and Public Safety
  • 2. Scrum as methodology since March 2010 No project manager The teams takes responsibility for: Sprint planning Release planning Unit test Auto test End Game (product verification) Coding rules Definition of Done Communities of Practice have the mandate to decide changes Ways of working ATDD (Acceptance Test Driven Development) Architecture (systemization) Automated testing SW design (implementation quality)Ericsson Internal | 2011-02-02 | Page 2
  • 3. 2010 2012Customer Acceptance period 25 prio 1 Trouble Reports 1 prio 1 Trouble Reports 8 Emergency corrections 0 Emergency correctionsAnonymous employee survey Motivation 73% Motivation 85% Leadership 60% Leadership 78% Ericsson Internal | 2011-02-02 | Page 3
  • 4. SCRUM MAKES ME SICKEricsson Internal | 2011-02-02 | Page 4
  • 5. ADAM › Top performer › High quality awareness › Pro active › Great drive › Comprehensive view › Takes responsibilityEricsson Internal | 2011-02-02 | Page 5
  • 6. ADAM › Immense frustration over lack of power to influence team performance › Used to great deal of influence (both formal and informal) and lost the accustomed ways to be part of decisionsEricsson Internal | 2011-02-02 | Page 6
  • 7. Agile Development demands elephant managers Be part of the herd Big ears Blast your trunkEricsson Internal | 2011-02-02 | Page 7
  • 8. Summary Agile development have been a success Scrum isn’t for everyone Elephant management is neededEricsson Internal | 2011-02-02 | Page 8