Your SlideShare is downloading. ×
Project Information 060709[1]
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Project Information 060709[1]

567

Published on

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
567
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
12
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 1.0 PROJECT BACKGROUND 2.0 SCOPE OF WORKS The components in this flood mitigation project comprise of two (2) interrelated flood diversion schemes : i) New diversion channel to divert Sg. Keroh flood flow to Jinjang Detention Ponds. ii) Upgrading Gombak Diversion to allow more discharge diversion from Sg. Gombak to the enlarged Batu Detention Pond. iii) Benteng and Puah conceptional detail design.
  • 2. 2.1 GOMBAK DIVERSION’S WORK
  • 3. Upgrading of the existing Gombak Diversion system: i. Gombak Diversion (3.375 km) ii. Gombak barrage at Gombak River downstream of Gombak Diversion iii. Low overflow weir from Gombak River to Gombak Diversion iv. Inlet gate to Gombak Diversion v. Gombak Diversion outfall structure vi. Ogee weir from regulating pond to Batu Pond vii. Enlargement of Batu Pond capacity to 4.5 million cubic meter viii. Control gate for Batu Pond outlet to Batu River ix. Flood walls along Gombak River 2.2 KEROH DIVERSION’S WORK
  • 4. i. New diversion scheme from Sungai Keroh to Jinjang Ponds (2.2 km) ii. Keroh barrage at downstream of Seri Segambut Pond iii. Low overflow weir from Keroh river to Seri Segambut Pond iv. Inlet gate to Keroh Diversion v. Keroh Diversion outfall vi. Enlargement of Nanyang pond, Taman Wahyu and Delima Pond capacity to 2.5 million cubic meter vii. Control gate at Nanyang Pond outlet viii. Deepening of the channel connecting Nanyang and Taman Wahyu Pond ix. Control gate at Taman Wahyu and Delima Pond outlet x. Flood walls along Keroh River 3.0 CONTRACTUAL INFORMATION i) Nama Kontrak : Projek Mengatasi Masalah Banjir Di Kuala Lumpur Package B – Batu / Jinjang Ponds And Related Flood Diversion ii) No. Kontrak : JPS/IP/S/5/02 iii) Pemilik Projek : Kerajaan Malaysia, Kementerian Sumber Asli Dan Alam Sekitar iv) Jabatan Pelaksana : Jabatan Pengairan dan Saliran, Malaysia v) Kontraktor Utama : PECD Construction Sdn. Bhd. 5th Floor, Block E, Peremba Square Saujana Resort, Seksyen U2, 40150 Shah Alam Selangor Darul Ehsan vi) Perunding Rekabentuk dan RPM Engineers Sdn. Bhd. Penyeliaan: 34A, Jalan SS21/39, Damansara Utama 47400 Petaling Jaya, Selangor Darul Ehsan vii) Perunding Jurukur Bahan : Perunding Ukur Bahan RB, Unit G1, Taman Tunku, Bukit Tunku, 50480 Kuala Lumpur viii) Harga Kontrak Asal : RM 804,993,894.00 ix) Kos Pembinaan: RM 528,880,519.00 x) Tempoh Kontrak : 45 Bulan (25 Ogos 2003 – 24 Mei 2007) EOT 1 ( 27 Disember 2007 ) EOT 2 ( 26 Mei 2008 ) EOT 3 ( 25 September 2008 ) EOT 4 ( 24 Disember 2008 ) EOT 5 (24 Ogos 2009)

×