Welcome<br />Modernization of Irrigation Water Management<br />for Sustainable Development Assembly<br />to <br />Regional...
Northern Thailand Local Wisdom Irrigation Systems<br />(Meung –Fai)<br />
Sinthukit-PreCha Weir The Northern Thailand’s first Governmental Constructed Irrigation System<br />Completed 1929<br />
Regional  Irrigation  Office  I<br />The HeadquartersoftheRegionalIrrigation Office IislocatedatWatKetSub-District , Muang...
2<br />1<br />5<br />3<br />4<br />6<br />7<br />10<br />12<br />8<br />13<br />11<br />9<br />14<br />15<br />16<br />17<...
Duties and Responsibilities<br />Implementation of activities aimed at achieving, collecting, storing, controlling, distri...
Organization<br />
Regional  Irrigation  Office  I<br />Chiang Mai  Provincial  Irrigation  Office<br /><ul><li>Engineering  Branch
Water Management and Irrigation  System  </li></ul> Improvement Branch<br /><ul><li>Mechanic  Branch
Operation  and  Maintenance Branch 1-6</li></ul>Royal Development Study Center <br />(Huai Hong Khrai)<br /><ul><li>Engine...
Operation Coordination  Branch</li></ul>Administration  Support Branch<br />Engineering  Management Division<br /><ul><li>...
Design  Group
Soil  Science  and  Geological  Group
Topographical  Survey  Branch
Dam Safety  Management Branch
Engineering  Inspection and Analysis Branch</li></ul>Lamphun  Provincial  Irrigation  Office<br /><ul><li>Engineering  Branch
Water Management and Irrigation  System </li></ul>  Improvement Branch<br /><ul><li>Mechanic  Branch
Operation  and  Maintenance Branch 1-4</li></ul>On-Farm Operation Project<br /><ul><li>Engineering  Branch
Construction  Group
Continuing  Activity  Extension    Branch
Mechanical  Operation  Group</li></ul>Operation and Maintenance Division<br /><ul><li>Water Management and Budget Planning...
Improvement  and  Maintenance Planning</li></ul>  Branch<br /><ul><li>Roads Improvement and Maintenance Branch
Water Crisis Planning and Management Branch</li></ul>Mae Hong Son  Provincial  Irrigation  Office<br /><ul><li>Engineering...
Water Management and Irrigation  System  </li></ul>                   Improvement Branch<br /><ul><li>Mechanic  Branch
Operation  and  Maintenance Branch 1-4</li></ul>Construction  Project 1 - 2<br /><ul><li>Engineering  Branch
Construction  Group 1-5
Mechanical  Operation  Group</li></ul>Mae Tang Operation and Maintenance Project<br /><ul><li>Engineering  Branch
Water Management and Irrigation  System  </li></ul>                    Improvement Branch<br /><ul><li>Mechanic  Branch
Operation  and  Maintenance Branch 1-4</li></ul>Operation  Division<br /><ul><li>Construction  plan  and  Budget Branch
Electrical  Pumping Operation Branch
Natural  Water Sources Improvement Branch
Special Projects Branch.</li></ul>Mae Faek – Mae Ngad Operation and Maintenance Project<br /><ul><li>Engineering  Branch
Water Management and Irrigation  System  </li></ul>                   Improvement Branch<br /><ul><li>Mechanic  Branch
Operation  and  Maintenance Branch 1-4</li></ul>Mechanical  Division<br /><ul><li> Mechanical  Engineering  Branch
Mechanic  Operation  Branch
Earth-Moving Equipment Operation Branch
Pumping Operation Branch</li></ul>Mae Kuang Operation and Maintenance Project<br /><ul><li>Engineering  Branch
Water Management and Irrigation  System  Improvement Branch
Mechanic  Branch
Operation  and  Maintenance Branch 1-4</li></li></ul><li>ด้านการชลประทาน<br />IRRIGATION PROJECTS<br />
North<br />Basin Characteristic<br /><ul><li>Upper Ping basin is 1 of 25 main river basins in Thailand
The catchment area of Upper Ping basin is about 25,345 sq.km.
Upper Ping basin covers Chiang Mai, Lamphun and Tak provinces</li></ul>East<br />West<br /><ul><li>Upper Ping basin bounda...
กรมชลประทาน กระทรวงเกษตรและสหกรณ์<br />Inflow-Water Demand in Upper Ping River Basin<br />Water Shortage<br />(Dry season)...
Present and Future Water Demand in Upper Ping Basin <br />
THE UNION OF<br /> MYANMAR<br />CHIANG RAI<br /> PROVINCE<br />MAE HONG SON<br /> PROVINCE<br />CHIANG  MAI <br /> PROVINC...
โครงการชลประทานขนาดใหญ่<br />Large  scale irrigationprojects<br />No. of   5 projects<br /><ul><li>อ่างเก็บน้ำ จำนวน 2 โคร...
ฝายทดน้ำ จำนวน 3 โครงการ</li></ul>ความจุเก็บกักน้ำได้  528 ล้าน ลบ.ม. <br />รวมพื้นที่ชลประทาน 467,900 ไร่<br /><ul><li>2 ...
Upcoming SlideShare
Loading in …5
×

Rid1 Modernization

997 views
947 views

Published on

Modernization of Irrigation Water Management
for Sustainable Development Assembly
to
Regional Irrigation Office I

Published in: Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
997
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Rid1 Modernization

  1. 1. Welcome<br />Modernization of Irrigation Water Management<br />for Sustainable Development Assembly<br />to <br />Regional Irrigation Office I<br />www.RID-1.com<br />
  2. 2. Northern Thailand Local Wisdom Irrigation Systems<br />(Meung –Fai)<br />
  3. 3. Sinthukit-PreCha Weir The Northern Thailand’s first Governmental Constructed Irrigation System<br />Completed 1929<br />
  4. 4. Regional Irrigation Office I<br />The HeadquartersoftheRegionalIrrigation Office IislocatedatWatKetSub-District , MuangDistrict, Chiang Mai Province, about 720 kmfromBangkok.Itisaccessablebyroad, railandair.<br />Height 310.00 msl<br />RID-CEO<br />CHAINGMAI IRRIGATION PROJECT<br />
  5. 5. 2<br />1<br />5<br />3<br />4<br />6<br />7<br />10<br />12<br />8<br />13<br />11<br />9<br />14<br />15<br />16<br />17<br />Location<br /> TheRegionalIrrigationoffice I isone ofthe seventeenregionalirrigationoffices,establishedunder the Royal IrrigationDepartment .<br />TheRegionalIrrigationoffice I covers Chiang Mai, Lumphun and Mae Hong Son province.<br />
  6. 6. Duties and Responsibilities<br />Implementation of activities aimed at achieving, collecting, storing, controlling, distributing, draining or allocating water for agricultural, household consumption, industrial and navigation purposes; monitoring and evaluation of safety of dams and appurtenant structures; and prevention of damages from water.<br />Operation and maintenance of irrigation structures<br />Prevention and solving of water shortage, flood and water quality problems in the responsible area.<br />Study and preparation of preliminary reports of water resources development projects in the responsible area.<br />Dissemination of modern technology and knowledge to water users.<br />Cooperation with or supporting the operation of other offices and divisions as assigned by the Department. <br />
  7. 7. Organization<br />
  8. 8. Regional Irrigation Office I<br />Chiang Mai Provincial Irrigation Office<br /><ul><li>Engineering Branch
  9. 9. Water Management and Irrigation System </li></ul> Improvement Branch<br /><ul><li>Mechanic Branch
  10. 10. Operation and Maintenance Branch 1-6</li></ul>Royal Development Study Center <br />(Huai Hong Khrai)<br /><ul><li>Engineering Management Group
  11. 11. Operation Coordination Branch</li></ul>Administration Support Branch<br />Engineering Management Division<br /><ul><li>Project Consideration Group
  12. 12. Design Group
  13. 13. Soil Science and Geological Group
  14. 14. Topographical Survey Branch
  15. 15. Dam Safety Management Branch
  16. 16. Engineering Inspection and Analysis Branch</li></ul>Lamphun Provincial Irrigation Office<br /><ul><li>Engineering Branch
  17. 17. Water Management and Irrigation System </li></ul> Improvement Branch<br /><ul><li>Mechanic Branch
  18. 18. Operation and Maintenance Branch 1-4</li></ul>On-Farm Operation Project<br /><ul><li>Engineering Branch
  19. 19. Construction Group
  20. 20. Continuing Activity Extension Branch
  21. 21. Mechanical Operation Group</li></ul>Operation and Maintenance Division<br /><ul><li>Water Management and Budget Planning</li></ul> Branch<br /><ul><li>Water Management Branch
  22. 22. Improvement and Maintenance Planning</li></ul> Branch<br /><ul><li>Roads Improvement and Maintenance Branch
  23. 23. Water Crisis Planning and Management Branch</li></ul>Mae Hong Son Provincial Irrigation Office<br /><ul><li>Engineering Branch
  24. 24. Water Management and Irrigation System </li></ul> Improvement Branch<br /><ul><li>Mechanic Branch
  25. 25. Operation and Maintenance Branch 1-4</li></ul>Construction Project 1 - 2<br /><ul><li>Engineering Branch
  26. 26. Construction Group 1-5
  27. 27. Mechanical Operation Group</li></ul>Mae Tang Operation and Maintenance Project<br /><ul><li>Engineering Branch
  28. 28. Water Management and Irrigation System </li></ul> Improvement Branch<br /><ul><li>Mechanic Branch
  29. 29. Operation and Maintenance Branch 1-4</li></ul>Operation Division<br /><ul><li>Construction plan and Budget Branch
  30. 30. Electrical Pumping Operation Branch
  31. 31. Natural Water Sources Improvement Branch
  32. 32. Special Projects Branch.</li></ul>Mae Faek – Mae Ngad Operation and Maintenance Project<br /><ul><li>Engineering Branch
  33. 33. Water Management and Irrigation System </li></ul> Improvement Branch<br /><ul><li>Mechanic Branch
  34. 34. Operation and Maintenance Branch 1-4</li></ul>Mechanical Division<br /><ul><li> Mechanical Engineering Branch
  35. 35. Mechanic Operation Branch
  36. 36. Earth-Moving Equipment Operation Branch
  37. 37. Pumping Operation Branch</li></ul>Mae Kuang Operation and Maintenance Project<br /><ul><li>Engineering Branch
  38. 38. Water Management and Irrigation System Improvement Branch
  39. 39. Mechanic Branch
  40. 40. Operation and Maintenance Branch 1-4</li></li></ul><li>ด้านการชลประทาน<br />IRRIGATION PROJECTS<br />
  41. 41. North<br />Basin Characteristic<br /><ul><li>Upper Ping basin is 1 of 25 main river basins in Thailand
  42. 42. The catchment area of Upper Ping basin is about 25,345 sq.km.
  43. 43. Upper Ping basin covers Chiang Mai, Lamphun and Tak provinces</li></ul>East<br />West<br /><ul><li>Upper Ping basin boundaries:</li></ul>North Kok basin<br /> East Wang basin<br /> West Salawin basin<br /> South Lower Ping basin<br />South<br />ลุ่มน้ำปิงตอนล่าง<br />
  44. 44. กรมชลประทาน กระทรวงเกษตรและสหกรณ์<br />Inflow-Water Demand in Upper Ping River Basin<br />Water Shortage<br />(Dry season) 695 MCM.<br />Runoff <br />8,062 MCM.<br />Volume MCM<br />Water Demand3,715 MCM.<br />Nov<br />Apr<br />May<br />Mar<br />Feb<br />Jan<br />Dec<br />Oct<br />Sep<br />Aug<br />Jul<br />Jun<br />Month<br />
  45. 45. Present and Future Water Demand in Upper Ping Basin <br />
  46. 46. THE UNION OF<br /> MYANMAR<br />CHIANG RAI<br /> PROVINCE<br />MAE HONG SON<br /> PROVINCE<br />CHIANG MAI <br /> PROVINCE<br />LUMPOON<br /> PROVINCE<br />LUMPANG<br /> PROVINCE<br />Average annual rainfall 1,220.4 mm (48 in)<br />Average annual runoff 4,860 MCM<br />** 1 Rai =1,600 Sq.M or 0.16 Ha<br />TAK<br /> PROVINCE<br />
  47. 47. โครงการชลประทานขนาดใหญ่<br />Large scale irrigationprojects<br />No. of 5 projects<br /><ul><li>อ่างเก็บน้ำ จำนวน 2 โครงการ
  48. 48. ฝายทดน้ำ จำนวน 3 โครงการ</li></ul>ความจุเก็บกักน้ำได้ 528 ล้าน ลบ.ม. <br />รวมพื้นที่ชลประทาน 467,900 ไร่<br /><ul><li>2 Large Reservoirs
  49. 49. 3 Weirs </li></ul>Storage Capacity 528 MCM.<br />Irrigation Area 467,900rais<br />
  50. 50. Large Scale Reservoir <br />Project storages 528 MCM<br />Irrigated Areas 67,700 ha<br />
  51. 51. Chiang Mai City<br />Mae Taeng Project<br />Mae Tang weir is a reinforced concrete structure enduring maximum flow of 24 MCM/sec Irrigated Area 148,000Rai<br />โครงการส่งน้ำและบำรุงรักษาแม่แตง<br />Lumpang<br />Mae Tang Weir<br />Ping River<br />Lumpoon<br />
  52. 52. Chiang Mai City<br />Mae Faek Project<br />โครงการส่งน้ำและบำรุงรักษาแม่แฝก-แม่งัด<br />Mae Ngad Project<br />The 59 m. tall Mae Ngad dam barricades Mae Ngad stream holding capacity 265 MCM<br />Lumpang<br />Ping River<br />Irrigated Area 82,000Rai<br />Lumpoon<br />
  53. 53. Chiang Mai City<br />Mae Kuang Project<br />โครงการส่งน้ำและบำรุงรักษาแม่กวง<br />เขื่อนแม่กวงอุดมธารา<br />Lumpang<br />Ping River<br />Irrigated Area 175,000Rai<br />Lumpoon<br />
  54. 54. Mae Ping Kao Project<br />Chiang Mai City<br />Lumpang<br />Lumpoon<br />Irrigated Area 48,400 Rai<br />
  55. 55. อ่างเก็บน้ำแม่ตูบ<br />อ่างเก็บน้ำแม่ออน<br />39 MEDIUM SCALE IRRIGATION PROJECTS <br />IN<br />CHIANG MAI, LUMPHUN ,and MAEHONGSORN IRRIGATION PROJECTS<br />อ่างเก็บน้ำแม่แหลงหลวง<br />อ่างเก็บน้ำแม่โก๊น<br />อ่างเก็บน้ำแม่ตะไคร้<br />ฝายเหมืองใหม่<br />Total Capacity 71.357 MCM<br />Irrigated Area 117,446 Rai<br />อ่างเก็บน้ำโป่งจ้อ<br />อ่างเก็บน้ำห้วยเดื่อ<br />
  56. 56. Small Scale Irrigation Projects beneficial <br />areas 95,000 ha<br />Royal Initiative Projects<br />beneficial areas 18,275 ha<br />
  57. 57. Royal Initiative Projectจำนวน 307 โครงการ<br />ฝายคงคาใน<br />อ่างห้วยกล้า<br />ฝายทุ่งเริง<br />
  58. 58. Royal Project<br />จำนวน 29 ศูนย์<br />โครงการหลวงแม่โถ<br />โครงการหลวงแม่สะป๊อก<br />โครงการหลวงป่าเมี่ยง<br />โครงการหลวงอ่างขาง<br />
  59. 59. Irrigation Project in Border Villageจำนวน 9 โครงการ<br />
  60. 60. People’s Irrigation Project<br />จำนวน 6 โครงการ<br />ฝายท่าศาลา<br />ฝายท่าวังตาล<br />ฝายหนองผึ้ง<br />
  61. 61. Small Scale Irrigation Project<br />จำนวน 265 โครงการ<br />
  62. 62. Dredging Sediment Projectจำนวน 414 โครงการ<br />โครงการขุดลอกฯ ห้วยต้นตึง<br />
  63. 63. Farm Pondจำนวน 3,015 แห่ง<br />สระเก็บน้ำหมู่1 ตำบลมืดกา อำเภอดอยเต่า<br />สระเก็บน้ำหมู่3 บ้านสหกรณ์ อำเภอสันกำแพง<br />สระเก็บน้ำหมู่2 ตำบลท่าเดื่อ อำเภอดอยเต่า<br />
  64. 64. Water Resources Management<br />
  65. 65. การบริหารจัดการน้ำในอ่างเก็บน้ำขนาดใหญ่และขนาดกลาง<br />(Reservoir Operation Scale)<br />.<br />
  66. 66. ( ปตร. 6 - 12.5x6 ม. ) <br />4 - 4 x4ม. <br />3 - 4 x6ม. <br />5 - 4x5 ม. <br />Water Management in Upper-ping Basin<br />Mae Ngad Project<br />(265 MCM)<br />อ.เชียงดาว<br />(102.4 MCM / 39%)<br />(12.35 m3/s)<br />Mae Kwang Project<br />(263 MCM)<br />(43.80 MCM / 17%)<br />(210m3/s)<br />Mae Feak Proj.<br />(190 m3/s)<br />คลองส่งน้ำ<br />Mae Tang Weir<br />LMC<br />อ.แม่แตง<br />P.67<br />อ.ดอยสะเก็ด<br />(440m3/s)<br />(23.8 m3/s)<br />อ.สันทราย<br />อ.สันกำแพง<br />Chiang Mai City<br />อ.เมืองเชียงใหม่<br />น.แม่ออน , น.แม่ปูคา<br />P.1<br />(460m3/s)<br />เหมืองท่าศาลา<br />น.แม่คาว<br />(3.20 m3/s)<br />( 40 ม3/วิ)<br />(บรรเทาอุทกภัย อ.สันกำแพง 75 m3/s)<br />(1 m3/s)<br />(15 m3/s)<br />เหมืองหนองผึ้ง<br />น.แม่กวง<br />ฝายท่าศาลา<br />(1 m3/s)<br />เหมืองปิงห่าง<br />ฝายหนองผึ้ง<br />น.แม่สะลาบ<br />อ่างฯแม่ธิ<br />(4.5 ล้าน ลบ.ม.)<br />เหมืองพญาคำ<br />Tha Wang Tan<br />P.81<br />อ.สารภี<br />(15 m3/s)<br />( 11 ม3/วิ)<br />(10 m3/s)<br />อ่างฯแม่ตีบ<br />โรงสูบน้ำคลองแม่ข่า<br />(10 ล้าน ลบ.ม.)<br />(0.6 m3/s)<br />ฝายชลขันธ์พินิจ<br />คลองส่งน้ำ<br />ฝายแม่ร่องน้อย<br />อ่างฯแม่สาน<br />(16 ล้าน ลบ.ม.)<br />(635 m3/s)<br />Lampoon<br />น.แม่ข่า<br />( 18 ม3/วิ)<br />อ่างฯแม่เมย<br />P.5<br />(120 m3/s)<br />โรงสูบน้ำสบแม่ข่า<br />ฝายวังตอง<br />อ.เมืองลำพูน<br />น.แม่ทา<br />(3.6 ล้าน ลบ.ม.)<br />2 - f 1 ม. <br />นิคม<br />ฝายท่ามะโก๋<br />คลองส่งน้ำ<br />(0.7 m3/s)<br />(140 m3/s)<br />(0.5 m3/s)<br />ฝายสบทา<br />P.87<br />อ.ป่าซาง<br />ฝายสบร้อง<br />(360 m3/s)<br />อ.หางดง<br />(1.5 m3/s)<br />( 2.4 ม3/วิ)<br />ฝายพญาอุต<br />(1,260 / 650 m3/s)<br />(800 / 45 m3/s)<br />(1,550)<br />ฝายหนองสลีก<br />อ.สันป่าตอง<br />( 74.5 m3/s)<br />ฝายดอยน้อย<br />( -ลดระดับสันฝาย 1.50 ม. )<br />( - ฝายยางสูง1.50 ม.ยาว 138 ม.)<br />( 1.3 ม3/วิ)<br />ฝายวังปาน<br />( 0.85 ม3/วิ)<br />
  67. 67. Mae Ngad – Large Scale Project<br />
  68. 68. Mae Kwung – Large Scale Project<br />
  69. 69. Mae Tang – Large Scale Project<br />
  70. 70. Water Resource Management in Upper Ping Basin<br />การเฝ้าระวังพื้นที่เสี่ยงภัยและการบริหารน้ำหลาก<br />
  71. 71. Strategic Plans <br />for Water Resources Management<br />Via Infrastructure Constructions<br />
  72. 72. ( ปตร. 6 - 12.5x6 ม. ) <br />4 - 4 x4ม. <br />3 - 4 x6ม. <br />5 - 4x5 ม. <br />Water Management in Upper-ping Basin<br />Mae Ngad Project<br />(265 MCM)<br />อ.เชียงดาว<br />(102.4 MCM / 39%)<br />(12.35 m3/s)<br />Mae Kwang Project<br />(263 MCM)<br />(43.80 MCM / 17%)<br />(210m3/s)<br />Mae Feak Proj.<br />(190 m3/s)<br />คลองส่งน้ำ<br />Mae Tang Weir<br />LMC<br />อ.แม่แตง<br />P.67<br />อ.ดอยสะเก็ด<br />(440m3/s)<br />(23.8 m3/s)<br />อ.สันทราย<br />อ.สันกำแพง<br />Chiang Mai City<br />อ.เมืองเชียงใหม่<br />น.แม่ออน , น.แม่ปูคา<br />P.1<br />(460m3/s)<br />เหมืองท่าศาลา<br />น.แม่คาว<br />(3.20 m3/s)<br />( 40 ม3/วิ)<br />(บรรเทาอุทกภัย อ.สันกำแพง 75 m3/s)<br />(1 m3/s)<br />(15 m3/s)<br />เหมืองหนองผึ้ง<br />น.แม่กวง<br />ฝายท่าศาลา<br />(1 m3/s)<br />เหมืองปิงห่าง<br />ฝายหนองผึ้ง<br />น.แม่สะลาบ<br />อ่างฯแม่ธิ<br />(4.5 ล้าน ลบ.ม.)<br />เหมืองพญาคำ<br />Tha Wang Tan<br />P.81<br />อ.สารภี<br />(15 m3/s)<br />( 11 ม3/วิ)<br />(10 m3/s)<br />อ่างฯแม่ตีบ<br />โรงสูบน้ำคลองแม่ข่า<br />(10 ล้าน ลบ.ม.)<br />(0.6 m3/s)<br />ฝายชลขันธ์พินิจ<br />คลองส่งน้ำ<br />ฝายแม่ร่องน้อย<br />อ่างฯแม่สาน<br />(16 ล้าน ลบ.ม.)<br />(635 m3/s)<br />Lampoon<br />น.แม่ข่า<br />( 18 ม3/วิ)<br />อ่างฯแม่เมย<br />P.5<br />(120 m3/s)<br />โรงสูบน้ำสบแม่ข่า<br />ฝายวังตอง<br />อ.เมืองลำพูน<br />น.แม่ทา<br />(3.6 ล้าน ลบ.ม.)<br />2 - f 1 ม. <br />นิคม<br />ฝายท่ามะโก๋<br />คลองส่งน้ำ<br />(0.7 m3/s)<br />(140 m3/s)<br />(0.5 m3/s)<br />ฝายสบทา<br />P.87<br />อ.ป่าซาง<br />ฝายสบร้อง<br />(360 m3/s)<br />อ.หางดง<br />(1.5 m3/s)<br />( 2.4 ม3/วิ)<br />ฝายพญาอุต<br />(1,260 / 650 m3/s)<br />(800 / 45 m3/s)<br />(1,550)<br />ฝายหนองสลีก<br />อ.สันป่าตอง<br />( 74.5 m3/s)<br />ฝายดอยน้อย<br />( -ลดระดับสันฝาย 1.50 ม. )<br />( - ฝายยางสูง1.50 ม.ยาว 138 ม.)<br />( 1.3 ม3/วิ)<br />ฝายวังปาน<br />( 0.85 ม3/วิ)<br />
  73. 73. Mae Tang – Mae Ngad –Mae Kwang<br />Trans-basins Diversion Project<br />Mae Ngad<br />Detail: Divert MCM / Year (26 cms)<br />Cost4,871.54 Million Baht<br />Beneficial<br /> - Irrigation area increase 40,860 Rais<br /> - Serve household and Industrial 49.99 MCM more<br /> - Economical stimulation 864.83 Million Baht / yr<br />Mae Tang<br />ลำน้ำแม่แตง<br />ลำน้ำแม่งัด<br />Diversion Tunnel<br />ลำน้ำปิง<br />Mae Kwang<br />
  74. 74. ประตูระบายน้ำแม่ตะมาน<br />อาคารระบายน้ำ : บานระบายน้ำแบบพับได้<br /> - บานระบายน้ำขนาด 12.50 x 3.50 ม. จำนวน 3 บาน<br /> - ช่องระบายทราย ขนาด 0.80 x 1.00 ม. จำนวน 10 ช่อง<br /> อาคารระบายทราย : บานระบายแบบโค้ง<br /> - ขนาด 2.50 x 3.00 ม. จำนวน 2 ช่อง<br /> อาคารรับน้ำ : บานระบายแบบตรง<br /> - ขนาด 4.00 x 4.00 ม. จำนวน 1 ช่อง<br />ระยะเวลาในการก่อสร้าง 2 ปี<br />อุโมงค์ส่งน้ำ แม่แตง - แม่งัด<br /> - เส้นผ่าศูนย์กลางอุโมงค์ 4.00 ม.<br /> - ความยาวอุโมงค์ 25.401 กม.<br /> - ปริมาณน้ำผ่านอุโมงค์สูงสุด 28.50 ลบ.ม./วินาที<br />ใช้เวลาการก่อสร้าง 4 ปี <br />อุโมงค์ส่งน้ำ แม่งัด – แม่กวง<br />- เส้นผ่าศูนย์กลางอุโมงค์ 5.00 ม.<br />- ความยาวอุโมงค์ 20.933 กม.<br />- ปริมาณน้ำผ่านอุโมงค์สูงสุด 26.00 ลบ.ม./วินาที<br />ใช้เวลาการก่อสร้าง 4 ปี <br />
  75. 75. Mae Ping Operation Gate Project<br />
  76. 76. Mae Ping Operation Gate Project Plan<br />Fish ladder 3.00m x270m<br />6 Regulating Gates12.50 x 6.50 m.<br />Max Q 1,200 cms Automatically OperatedTraditional Lanna Style Design for City Landmark Purpose<br />
  77. 77. Mae Ping Operation Gate Project<br />9.75 m<br />Front View<br />รูปด้านหน้า<br />9.75 m<br />Side View<br />รูปด้านข้าง<br />
  78. 78. Flood Warning and Forecast System<br />
  79. 79. ประชาสัมพันธ์ให้ประชาชนทราบ<br /> (To inform the communities about the flood in advance)<br />1) ทาง Internet ใน www.hydro-1.com<br /> รายงานสถานการณ์ทางInternetในWebsitehttp://www.hydro-1.com<br />
  80. 80. เวียงแหง<br />พายุฝน<br />Upper Ping<br />UP.02<br />เชียงดาว<br />UP.01<br />UP.03<br />UP.11<br />พร้าว<br />แม่แตง<br />เขื่อนแม่งัด<br />แม่ริม<br />UP.04<br />UP.05<br />เชียงใหม่<br />UP.12<br />หางดง<br />สันทราย<br />MS<br />UP.06<br />เขื่อนแม่กวง<br />ดอยสะเก็ด<br />สารภี<br />ป่าซาง<br />สันกำแพง<br />ลำพูน<br />UP.10<br />UP.07<br />UP.09<br />UP.08<br />กิ่ง อ.บ้านธิ<br />Telemetry<br />
  81. 81. Telemetry System in Upper Ping Basin<br />
  82. 82. Telemetry System Real Time Report<br />www.upperping.com<br />
  83. 83. ขอขอบคุณทุกท่าน<br />สำนักชลประทานที่ 1<br />Appreciate your attention<br />

×