Building
Upcoming SlideShare
Loading in...5
×
 

Building

on

  • 265 views

contact Amanjit Singh

contact Amanjit Singh
09312221946

Statistics

Views

Total Views
265
Views on SlideShare
265
Embed Views
0

Actions

Likes
0
Downloads
4
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Building Building Presentation Transcript

  • PROFILE OF THE BUILDING
  • Building facts
    • Prime location NH8
    • Green Building View slide
    • Fresh air throughout the building thru the ventilation units attached to the AC’s , cross air ventilated building View slide
    • Power backup
    • Four side open building
    • Terrace anti aircraft light
    • CCTV Cameras at prime locations
    • The flooring carpets are anti static carpets
    • Plantation
    • Glass Mosaic tiles
    • Safety glass all through the building
  • Ground Floor
  • GROUND floor
    • 3 Cabins
    • 2 Training Rooms
    • 1 CCTV Room
    • 1 Production Hall
    • 3 Washrooms
    • 1 Cafeteria
  • Ground floor
    Total AC Unit Capacity : 70 tons
    • Reception:5.5 Tons : Voltas
    • Cafeteria :27 Tons : Carrier and LG
    • Training Center :9.5 Tons : Carrier
    • Production Area and Storage Area : 22 Tons : Blue Star
    • Individual Units : 6 Tons : Carrier and Samsung
    PANELS
    • 2 Fire Hydrant stations
    • 1 Notifier Fire control panel
    • 1 Ground Floor Panel 400 Amperes
  • First floor
    • 13 Cabin
    • 26 Cubical
    • 188 Workstation
    • 5 Meeting Room
    • 2 Server Room
    • 3 Washrooms
  • First floor
    AC Units
    • Total AC packaged unit : 68 Tonnes : Voltas
    • Individual AC units : 12 Tonnes :Diakin
    Panels :
    • 2 Fire hydrant station
    • 1 First floor panel 200 amperes
  • Second floor
    • 22 Cabins
    • 35 Cubicals
    • 144 Workstation
    • 3 Meeting Room
    • 1 Server Room
    • 3 Washrooms
  • Second Floor
    AC Units ;
    • Total Package Unit : 66 Tons : Voltas
    • Individual Units : 24.5 Tons: Carrier /Diakin
    Panels
    • 2 fire hydrant station
    • MDB UPS panel 125 ampere
    • Server room control UPS panel 125 ampere
    • Research and development panel 100 ampere
  • THIRD FLOOR
    • 21 Cabins
    • 31 Cubicles
    • 60 Workstations
    • 1 Meeting Room
    • 1 Board Room
    • 1 Auditorium
    • 1 Server Room
    • 1 Pantry Directors Area
    • 3 Washrooms
    • 2 Director Washroom
  • Third Floor
    AC Units :
    • Total Package Unit : 68 tons : Voltas
    • Individual Units : 23.5 Tons : Diakin /Carrier/Toshiba
    Panels :
    • 2 Fire hydrant station
    • Third floor UPS panel :125 ampere
    • Electrical panel : 200 amperes
    • Lighting Panel : 125 Amperes
  • Terrace
    Panels :
    • 2 Cooling Towers : 165 TR : Case /Asian
    • 1 Cooling Tower Pump Room
    • 1 Lift room
    • 2 Fresh Air Unit
    • 2 Exhaust fan unit
  • Outer AREa ( GF )
    Panels :
    • HT Meter Room
    • HT Panel Rooms
    • STP Plant : 50 KLD
    • Isolator Panel: 2000 AMPERE
    • POLE LIGHTS 39
    • RAMP SHUTTERS -2
    • PUMP ROOM
    • DG SETS
    • DIESEL TANK YARD :40000 KLD
  • Basement
    • LT PANEL -1 (2000 KVA)
    • VENTILATION PANEL -1(250 AMPERE)
    • NEW UPS PANEL -1 (100 AMPERE)
    • UPS BYPASS CHANGEOVER PANEL -5 (100 AMPERE EACH )
    • AC PANE L-1(630 AMPERE)
    • ADDITIONAL AC PANEL – 1(250 AMPERE )
    • UNIVERSAL TRANSFORMER CONTROL PANEL(RTCC )
    • CAPACITOR PANEL -1 (400 AMPERES )
    • BLOWER-2(18.5 KW AND 7.5KW)
    • FIRE HYDRANT STATION -2
    • APC UPS -4 (30 KVA ) WITH 32 BATTERIES EACH OF 65 AH
    • APC UPS -3 (40 KVA ) WITH 64 BATTERIES EACH OF 26 AH