• Save
Green Metal Formwork for construction of hi-rise building
Upcoming SlideShare
Loading in...5
×
 

Green Metal Formwork for construction of hi-rise building

on

  • 6,102 views

Environmentally friendly construction method by TLD/Acepac that uses reusable Metal Formwork that shortens construction period due to its ease in setting up and repetitive in nature.

Environmentally friendly construction method by TLD/Acepac that uses reusable Metal Formwork that shortens construction period due to its ease in setting up and repetitive in nature.

Statistics

Views

Total Views
6,102
Views on SlideShare
6,094
Embed Views
8

Actions

Likes
10
Downloads
0
Comments
0

2 Embeds 8

http://www.slideshare.net 7
http://translate.googleusercontent.com 1

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Green Metal Formwork for construction of hi-rise building Green Metal Formwork for construction of hi-rise building Presentation Transcript

  • METALWORK (SHENZHEN) CO., LTD. METALWORK (SHENZHEN) CO., LTD. PRESENTATION OFFICE RM 1601,BUILDING NO.18,BEAUTIFUL GARDEN,CENTRAL CITY, LONGGANG,SHENZHEN TEL +86-755-28900228 FAX +86-755-28913393 EMAIL : ksho@acepac.com.sg WEB : www.tldsz.com
  • METALWORK (SHENZHEN) CO., LTD. TLD Metalwork (Shenzhen) Co., Ltd. was established in 1997. Initially we specialized ourselves in fabricating and supplying high quality architectural metal parts such as stainless steel decorative features, doors and balustrades to many prestigious projects in Hong Kong. Since the year 2000, we have expanded our products to include design, fabrication and supply of aluminium formwork systems. Our export markets include Hong Kong, Macau, Dubai and India where technically sophistricated formwork systems are required. In order to cope with the increasing demands by our overseas customers for a short lead time delivery period without compromising the quality of our formwork systems, we have relocated our design and fabrication facilities to Dongguan with the factory space expanded to 20,000 sq.m. thereby increasing our production capacity and trail erection space. By erecting the completed formwork panels and accessories at our factory, we can ensure total accuracy in the design and fabrication of panels accessories prior to packing and shipping them to project sites overseas. Our TLD Aluminium Formwork System has below advantages: 1) Material: a) Aluminium alloy is Light weight, easy to handle and safty; b) Aluminium Formwork can be reused over 200 times; c) Low wastage and can be recycled. 2) Construction speed and quality: a) TLD aluminium formwork can form the complete concrete structure as designed by the customer, it has unsurpassed construction speed; b) Will mock-up in TLD facotry and be easy for erecting on customer’s site c) Aluminium formwork can form high quality finish of the concrete surface 3) Labour and cost: a) Can use unskilled labour ; b) Cost effective for mass production.
  • METALWORK (SHENZHEN) CO., LTD. Human Resources 1 Management 14 a Manager 3 b Financial & Administrative 3 c Marketing & Business 6 d QA &QC 2 2 Designer 18 3 Project & Operators 118 Total 150
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (HONG KONG)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (HONG KONG)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (HONG KONG)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (HONG KONG)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (HONG KONG)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (HONG KONG)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (MACAU)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (MACAU)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork 2 (MACAU)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork JAFZ TOWER (DUBAI)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork GOLF TOWER III(DUBAI)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork SPORTS CITY 2 区(DUBAI)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork [OFFICES BUILDING(XL TOWER)]
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork MOCK-UP BUILDING LAYOUT
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (HONGKONG)
  • METALWORK (SHENZHEN) CO., LTD. Job Reference – Metal system formwork (HONGKONG)
  • METALWORK (SHENZHEN) CO., LTD. Introduction of aluminum system formwork 1 Aluminum system formwork installation on construction site 2 Aluminum formwork system process 1 Design 2 Fabrication 3 Mock-up 4 Transportation
  • METALWORK (SHENZHEN) CO., LTD. 1 Aluminum system formwork installation on construction site
  • METALWORK (SHENZHEN) CO., LTD. 1 Aluminum system formwork installation on construction site
  • METALWORK (SHENZHEN) CO., LTD. 2 Aluminum formwork system process 1 Aluminum system design -a key-Plan -c Shop Drawing -b Shell Drawing -d Erection Drawing a. key-Plan c. Shop Drawing b. Shell Drawing d. Erection Drawing
  • METALWORK (SHENZHEN) CO., LTD. 2 Aluminum formwork system process 2 Aluminum formwork fabrication Hardness Testing Fusion Formulated Aluminum Rod Chemical Components Inspection Raw Material Extruding Heating the Aluminum Extruded Profile Rod
  • METALWORK (SHENZHEN) CO., LTD. 2 Aluminum formwork system process 2 Aluminum fabrication Refitting Procedure 1 Refitting Procedure 2 Ageing Procedure 1 Eligible Extruded Ageing Procedure 2 Profile Inspection
  • METALWORK (SHENZHEN) CO., LTD. 2 Aluminum formwork system process 2 Aluminum Fabrication Semi-manufactured Goods Cutting Punching and Welding Semi-manufactured Goods Finished Products Cleaning Inspection
  • METALWORK (SHENZHEN) CO., LTD. 2 Aluminum formwork system process 3 Mock-up
  • METALWORK (SHENZHEN) CO., LTD. 2 Aluminum formwork system process 4 Transportation
  • METALWORK (SHENZHEN) CO., LTD. Procedures upon completion of trial assembly Trial assembly completed System formwork numbering to panels System formwork numbering to drawings Dismantle as per unit and discipline Packing Transport to construction site Site storage Site lift and installation
  • METALWORK (SHENZHEN) CO., LTD. Aluminum System Formwork – 4 days cycle 1) Day 1 --- 07 : 00~10:00 Lifting up Re-bar 2) Day 1 --- 08 : 00~14:00 Striking Wall Panel 3) Day 1 --- 09 : 00~17:00 Install Wall Panel 4) Day 1 --- 09 : 00~15:00 Fixing E&M Holes 5) Day 1 --- 16 : 00~Day 2 09:00 Striking Deck Panel 6) Day 1 --- 17 : 00~ 7) Day 2 --- 08 : 00~15:00 Install Slab & Bay-Window 8) Day 2 --- 14 : 00~Day 3 17:00 Rebar Fixing For Slab 9) Day 2 --- 16 : 00~Day 3 17:00 Fixing E&M Conduit 10) Day 3 --- 08 : 00 ~ 18 : 00 Rebar Fixing For Slab 11) Day 4 --- 08 : 00 ~ 17 : 00 Concrete 3 Sets 6 Sets
  • METALWORK (SHENZHEN) CO., LTD. Illustration for left-in beam soffit Beam Mid Bar Beam
  • METALWORK (SHENZHEN) CO., LTD. Illustration for left-in beam soffit Slab Slab Panel Left-in Prop
  • METALWORK (SHENZHEN) CO., LTD. Illustration for left-in beam soffit
  • METALWORK (SHENZHEN) CO., LTD. Illustration for left-in beam soffit Beam Soffit Left-in Prop
  • METALWORK (SHENZHEN) CO., LTD. Job Reference For System Formwork Design, Supply & Install of Alum System Formwork for Alum. System Tseung Kuan O Extension Proposed Property 06/2003 08/2004 Formwork Development at Hang Hou Station Area 38b Design, Supply & Installation of System Formwork, Alum. System Installation of Precast Fascade & Concreting for Tiu Keng 02/2004 07/2005 Formwork Leng Station Development, HK Design, Supply of System Formwork for Proposed Alum. System Residentail and Commercial Development at Area 55B, Formwork 04/2004 09/2004 Tseung Kwan O.T.K.O.T.L.75, Sai Kung, N.T.,HK Alum. System Design, Supply of System Formwork for Wynn Resorts Formwork & Steel 10/2004 08/2005 Macau System Formwork Supply of Aluminium beam for ShangHai Alum. Beam 05/2005 07/2005 Design, Supply& Installation of System Formwork for Alum. System Residential Development at Lot R+R1,Rua Central Da Formwork 09/2005 05/2006 Areia Preta,Macau Design, Supply of Aluminium System Formwork for Alum. System (P408FZ) Lob & Shopping Arcade, JAFZA Shouth Formwork 12/2005 08/2006 Plot NOS. SZS10212 & SZS10213,Dubai
  • METALWORK (SHENZHEN) CO., LTD. Job Reference For System Formwork Design, Supply of Aluminium System Formwork for Golf Tower Alum. System Formwork 06/2006 09/2006 III The Views Plot 34 Emaar Properties PJSC, Dubai Design, Supply & Installation of System Formwork, Installation Alum. System of Precast Fascade & Concreting for Proposed Residential Formwork & Steel 08/2006 01/2008 Development On Tseung Kwan O Town Lot 70,Area 86,Site System Formwork F,HK Design, Supply of System Formwork for Sports City Profile Alum. System Residence Tower / Bermuda Views Tower, Dubai Formwork 08/2007 12/2007 Design, Supply& Installation of System Formwork for Alum. System Formwork 06/2007 12/2007 Venetian Cotai Parcel 2 Serviced Apartment Tower Macau Design, Supply& Installation of System Formwork ,Installation Alum. System of Precast Fascade for Tai Wan maintenance center property Formwork 08/2007 11/2008 development, Sha tin town lot NO. 529 ,HK Design, Supply of System Formwork for XL Tower/Bussiness Alum. System Tower, Dubai Formwork 01/2008 06/2008 Design, Supply of System Formwork for Wynn Resorts Alum. System Macau-Diamond Suites, Macau Formwork 04/2008 03/2009
  • METALWORK (SHENZHEN) CO., LTD. Job Reference For System Formwork Shun Hing Centre Stainless Steel Wash Basin 2005 Metro Harbour View Aluminium Formwork 2001 Sorrento Automatic Lifting Frame 2002 Tseung Kwan O Hang Hau MTR Station Aluminium Formwork 2002 Cyberport Stainless Steel Connecting Components 2003 Mass Transit Railway Stations Formwork Steel Components 2003 Nam Cheong Street Public Health Laboratory Mobile Scaffolding 2003 Complex Queen Mary Hospital Stainless Steel Brackets 2003 Hang Hau MTR Station DreamCity Aluminium Formwork 2003 Central North MTR Station Aluminium Formwork 2003 Tiu Keng Leng MTR Station Aluminium Formwork 2003 Hong Kong University Memorial Hall Mobile Scaffolding 2003 Stainless Steel balustrade, Skylight and Royal Cliff, Repulse Bay 2004 Doors International Finance Centre III Aluminium Lamp Channel 2004 Les Saisons Mobile Scaffolding 2004 Hong Kong Housing Society Stainless Steel Waste Treatment System 2005 Tseung Kwan O DreamCity T1-6 Aluminium Formwork 2006 Property Development at Tai Wai KCR Aluminium Formwork 2007
  • METALWORK (SHENZHEN) CO., LTD. Job Reference For System Formwork Wynn Casino Aluminium formwork 2004 Lacite Aluminium Formwork 2006 The Venetian Macao-Resort-Hotel Aluminium Formwork 2007 Parking Meter System Powder-coated Steel components 2004 Stainless Steel & Aluminium Elliptical University of Michigan 2005 Columns Stainless Steel Connectors for Glazed IOWA State Public Library 2005 Curtain Wall JAFZ Tower Aluminium Formwork 2006 GOLF Tower III Aluminium Formwork 2006 Residential Tower at Dubai Sports City Aluminium Formwork 2007 Business Bay Aluminium Formwork 2007 XL Tower Aluminium Formwork 2007 Lanco Hills Technology Park Residential Towers Aluminium Formwork 2008 Steel Structure for Facade, Lift Shaft and Staircase Landing and Stringers, Baden-Baden Museum 2008 Aluminium Stepping and Stainless Steel Guardrail and Barrier King Abdullah University of Science & Technology Stainless Steel Studs 2008