Wrong confirmation ID
  • Email
  • Favorite
  • Download
  • Embed
  • Private Content

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

IT Project Performance Management with Oracle Primavera

by Microsoft on May 21, 2010

  • 3,188 views

IT Project Performance Management with Oracle Primavera

IT Project Performance Management with Oracle Primavera

Accessibility

Categories

Tags

p6 p6 analytics obi primavera business intelligence obiee oracle bi

More...

Upload Details

Uploaded via SlideShare as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

Cancel

2 Embeds 42

http://www.slideshare.net 41
http://www.lmodules.com 1

Statistics

Favorites
2
Downloads
218
Comments
0
Embed Views
42
Views on SlideShare
3,146
Total Views
3,188
Post Comment
Edit your comment Cancel

IT Project Performance Management with Oracle Primavera — Presentation Transcript