INSPECTION /RECORD SHEET FOR FOUNDATION EXCAVATION DIMENTION

NAME OF LINE:
CONSULTANT :
CLIENT              :
CONTRACTOR :


DATE                                                   12-Dec-07

TOWER NO:                                   0                     TOWER TYPE                 0


                                                LEG#1               LEG#2                    LEG#3              LEG#4
LEG EXT:                                          +4                     +2                       +3                +4
CHEMNEY EXT:                                       0                      0                       0                  0


SOIL CLASS:                           3                   DRAWING NUMBER:                        A/SP/7660/P/040


EXCAVATION DETAILS

EXCAVATION DRAWING NO:                                     A/SP/7660/P/040


                                                       LEG#1                  LEG#2                   LEG#3              LEG#4
                                                AS DRNG ACTUEL      AS DRNG      ACTUEL      AS DRNG ACTUEL     AS DRNG      ACTUEL

AVERAGE DEPTH TO CP                              4250      4250          4250         4250       4250    4250      4250          4250
EXCAVATION WIDTH                                 6030      6950          6030         7200       6030    6650      6030          6700
                                 WIDTH            150       150          150          150        150      150      150           150
      UNDER CUT                  HEIGHT           200       200          200          200        200      200      200           200


            SOIL STRATA                           MIXED SOIL             MIXED SOIL              MIXED SOIL         MIXED SOIL
DEWATERING REQUIRED                                    YES/NO              YES/NO                  YES/NO            YES/NO
SHUTERING EMPLOYED                                     YES/NO              YES/NO                  YES/NO            YES/NO

CHANGE OF FOUNDATION CLASS : YES/NO                               IF YES ACCEPTED CLASS:

Remark : Excavation accepted for stub setting and concreting




---------------------------------------------


INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION




                                                                     1
NAME OF LINE:                 0
CONSULTANT :
CLIENT      :
CONTRACTOR :

DATE                                   12-Dec-07

TOWER NO:                     0                 TOWER TYPE              0

                                  LEG#1               LEG#2              LEG#3            LEG#4
LEG EXT:                            +4  M                +2         M      +3  M             +4         M
CHEMNEY EXT:                         0  M                 0         M       0  M              0         M

SOIL CLASS:               3                 DRAWING NUMBER:                 A/SP/7660/P/040

STUB DETAILS

STUB MARK NO:                     H5800-1                           STUB LENGTH               6021

STUB DIMENTIONS

LEVEL LEG#2                                                                               LEVEL LEG#3
T=              0.616                     T=           14015.2                            T=          1.616
A=              0.614                     A=             8053.0                           A=          1.613



                                  T=        20108.0
                                  A=        11344.0
                                                                                  T=          14353.4
                                                                                  A=           7900.0

          T=            14292.7
          A=             8055.0

                                  T=        20272.7
                                  A=        11172.0




LEVEL LEG#1                               T=              14487.0                         LEVEL LEG#4
T=              1.616                     A=               7902.0                         T=          1.616
A=              1.616                                                                     A=          1.615

NOTE: SETTING LEG FOR LEVELL :LEG NO:……………………………….
                                                 1




INSPECTION /RECORD SHEET FOR REINFORCEMENT AND CONCRETING

NAME OF LINE:                 0
CONSULTANT :




                                                      2
CLIENT    :
CONTRACTOR :

DATE                                       12-Dec-07

TOWER NO:                           0                  TOWER TYPE             0

                                    LEG#1                 LEG#2                LEG#3                 LEG#4
LEG EXT:                              +4  M                  +2       M          +3  M                  +4          M
CHEMNEY EXT:                           0  M                   0       M           0  M                   0          M

SOIL CLASS:                   3               DRAWING NUMBER:                     A/SP/7660/P/040

CONCRETE MATERIALS (if as per drawing Y(es):


              ITEM                           OBSERVATION                                 COMMENTS
CEMENT                                              OK                                         N/A
GRAVEL SIZE                                         OK                                         N/A
SAND PROPERTY                                       OK                                         N/A
CONCRETE SUPPLIER
LOADING TIME                                11:43                 7:13                 10:52                 8:45
CONCRETING TIME                             13:10                 9:15                 12:00                 10:40

REINFORCEMENT MATERIALS (if as per drawing Yes):

REINFORCEMENT WEIGHT

                                  LEG#1                LEG#2                LEG#3                LEG#4
        PER LEG                1768.31                 1768.31              1768.31             1768.31
  TOTAL WEIGHT                                                    7073.24

CONCRETING

                 DATE OF                  DATE OF                CONCRETING VOLUME                        SLUMP
               CONCRETING               CONCRETING
   LEG           PYRAMID                 CHIMNEY          AS PER DRAWING              ACTUEL                 MM
    1             11/1/2007               11/1/2007               33.23                 46                    85
    2             28/2/2007               28/2/2007               33.23                 50                    90
    3             19/1/2007               25/1/2007               33.23                42.5                   90
    4             11/12/2006              11/12/2006              33.23                 42                   100
            TOTAL CONCRETING VOLUME                              132.91                180.5




INSPECTION /RECORD SHEET FOR REINFORCEMENT AND CONCRETING

NAME OF LINE:
CONSULTANT :
CLIENT      :
CONTRACTOR :




                                                          3
DATE                                  12-Dec-07

TOWER NO:                       0                 TOWER TYPE         0

                                LEG#1               LEG#2            LEG#3              LEG#4
LEG EXT:                          +4  M                +2      M       +3  M               +4   M
CHEMNEY EXT:                       0  M                 0      M        0  M                0   M

SOIL CLASS:                 3            DRAWING NUMBER:                  A/SP/7660/P/040

CUBES CYLINDRES TAKEN (ID=Mark identification )S for slab,C for chimney

    ID            DATE          LEG             DATE           LEG
     S          11/1/2007         1           19/1/2007          3
     C          28/2/2007         2          11/12/2006          4

FORM WORK REMOVED


   LEG            DATE                     OBSERVATION
     1          13/1/2007                          OK
     2           2/3/2007                          OK
     3          27/1/2007                          OK
     4          13/12/2006                         OK

REMARK: ACCEPTED FOR BACK FILLING
         FOUNDATION ACCEPTED FOR PAYMENT:




INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION

NAME OF LINE:
CONSULTANT :
CLIENT      :
CONTRACTOR :

DATE                                  12-Dec-07



                                                     4
TOWER NO:                 0                  TOWER TYPE             0

                          LEG#1                 LEG#2               LEG#3             LEG#4
LEG EXT:                    +4  M                  +2      M          +3  M              +4           M
CHEMNEY EXT:                 0  M                   0      M           0  M               0           M

SOIL CLASS:           3                 DRAWING NUMBER:                 A/SP/7660/P/040

STUB DETAILS

STUB MARK NO:                 H5800-1                      STUB LENGTH                    6021


CLEATS/STUB                     12                         CLEAT BOLTS/STUB                      24


STUB DIMENTIONS



                                                                LEG#1                LEG#2
                                           STUB SLOPE      WING1 WING2 WING1 WING2
                                          THEORETICAL          90       90      90         90
                                          ACTUAL AT SITE       90       90      89         90
1MTR

                  A                                             LEG#3                LEG#4
                                           STUB SLOPE      WING1 WING2 WING1 WING2
                                          THEORETICAL          90       90      90         90
                                          ACTUAL AT SITE       91       90      90         90




          STUB SETTING IS ACCEPTED FOR CONCRETING




INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION



NAME OF LINE:
CONSULTANT :
CLIENT      :
CONTRACTOR :




                                                 5
DATE                                12-Dec-07

TOWER NO:                    0                 TOWER TYPE            0


                    2                                                    3




                    1                                                    4

                          SLOPE IN 50CM    LEVEL
  LEG     LEG EXT CHI.EXT WING1 WING2 TOP OF STUB
   1         +4      0      45      45      1.616
   2         +2      0     44.5     45      0.614
   3         +3      0     45.5     45      1.613
   4         +4      0      45      45      1.615                        SIDE SLOPE IN 50CM=45

REFERENCE LEG FOR LEVEL                    1
                                                                                            -b


                                                                                            +b

                                           a



                         1-2      1-4     2-1          2-3       3-2       3-4      4-1          4-3
  DISTANCE"a"cm         1429.3   1448.7   1429.3       1401.5   1401.5    1435.3   1448.7         1435.3
    VALUE"b"cm            -4       6       0            0         0        2.5       -2           6
  (b/a)x100%value       -0.280    0.414    0.000        0.000    0.000     0.174   -0.138          0.418




INSPECTION /RECORD SHEET FOR EARTHING MEASURMENTS



NAME OF LINE:
CONSULTANT :
CLIENT      :
CONTRACTOR :


DATE                                12-Dec-07



                                                   6
TOWER NO:                   0             TOWER TYPE          0


                            LEG#1            LEG#2             LEG#3           LEG#4
LEG EXT:                      +4  M             +2      M        +3  M            +4      M
CHEMNEY EXT:                   0  M              0      M         0  M             0      M


BASIC EARTHING CONNECTED TO LEG NO:               1               3


DATE       EARTH RESISTANCE (OHM) WITH BASIC EARTHING
12/12/2007             1.8 OHM




NOTE: IF TOWER FOOTING RESISTANCE IS GREATER THAN 15 OHM ADDITIONAL EARTHING MAY BE REQUIRED
,SUBJECT TO THE APPROVAL OF ENGINEER



  AGREED FOR ADDITIONAL
 EARTHING TO BE INSTALLED       FOR EDF               FOR CONTRACTOR




DATE      EARTH RESISTANCE (OHM) WITH ADDITIONAL EARTHING
                         OHM


   EARTHING INSTALLATION
         ACCEPTED               FOR EDF               FOR CONTRACTOR




                                              7

More Related Content

Viewers also liked (12)

Overhead lines electrical_hazards
Overhead lines electrical_hazardsOverhead lines electrical_hazards
Overhead lines electrical_hazards
 
Counter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlCounter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohl
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Design of transmission lines in india a review of multiple swing angle
Design of transmission lines in india  a review of multiple swing angleDesign of transmission lines in india  a review of multiple swing angle
Design of transmission lines in india a review of multiple swing angle
 
Guide to sampling concrete
Guide to sampling concreteGuide to sampling concrete
Guide to sampling concrete
 
Swing angle
Swing angleSwing angle
Swing angle
 
Sample collection (Soil Investigation)
Sample collection (Soil Investigation)Sample collection (Soil Investigation)
Sample collection (Soil Investigation)
 
Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01
 
Use of bentonite
Use of bentoniteUse of bentonite
Use of bentonite
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Recommended limits for aggegates
Recommended limits for aggegatesRecommended limits for aggegates
Recommended limits for aggegates
 
Case study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structuresCase study on non destructive testing on concrete structures
Case study on non destructive testing on concrete structures
 

Similar to Copy of stub setting

Similar to Copy of stub setting (20)

Tensile capacity asd lrfd friedberg high sterngth bolts 031213
Tensile capacity asd lrfd friedberg high sterngth bolts 031213Tensile capacity asd lrfd friedberg high sterngth bolts 031213
Tensile capacity asd lrfd friedberg high sterngth bolts 031213
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
Pipeline hydraulic calculation
Pipeline hydraulic calculationPipeline hydraulic calculation
Pipeline hydraulic calculation
 
Footing
FootingFooting
Footing
 
Bill Godwin #1 Working with PVC Irrigation Wed jan 27
Bill Godwin #1 Working with PVC Irrigation Wed jan 27Bill Godwin #1 Working with PVC Irrigation Wed jan 27
Bill Godwin #1 Working with PVC Irrigation Wed jan 27
 
Bill Godwin #6 Irrigation Pipe & Fittings Wed Jan 27
Bill Godwin #6 Irrigation Pipe & Fittings Wed Jan 27Bill Godwin #6 Irrigation Pipe & Fittings Wed Jan 27
Bill Godwin #6 Irrigation Pipe & Fittings Wed Jan 27
 
Trilogy test cma
Trilogy test cmaTrilogy test cma
Trilogy test cma
 
Trilogy test cma
Trilogy test cmaTrilogy test cma
Trilogy test cma
 
Footing
FootingFooting
Footing
 
Keynote Kung-Fu: Streamlining Your Design Workflow With Keynote
Keynote Kung-Fu: Streamlining Your Design Workflow With KeynoteKeynote Kung-Fu: Streamlining Your Design Workflow With Keynote
Keynote Kung-Fu: Streamlining Your Design Workflow With Keynote
 
Datos presentacion ag olazo dic 09
Datos presentacion ag olazo dic 09Datos presentacion ag olazo dic 09
Datos presentacion ag olazo dic 09
 
Fanuc Ot Cnc Training Manual
Fanuc Ot Cnc Training ManualFanuc Ot Cnc Training Manual
Fanuc Ot Cnc Training Manual
 
108 ts
108 ts108 ts
108 ts
 
3D Drawing Samples
3D Drawing Samples3D Drawing Samples
3D Drawing Samples
 
Anomoligies 19 03 10
Anomoligies 19 03 10Anomoligies 19 03 10
Anomoligies 19 03 10
 
6.pdf
6.pdf6.pdf
6.pdf
 
Flujo de caja hidrosoft
Flujo de caja hidrosoftFlujo de caja hidrosoft
Flujo de caja hidrosoft
 
1 N4733
1 N47331 N4733
1 N4733
 
Projects
ProjectsProjects
Projects
 
My Projects
My ProjectsMy Projects
My Projects
 

More from Lahmeyer International, UAE (19)

AP88 & AP91 shifting proposal
AP88 & AP91 shifting proposalAP88 & AP91 shifting proposal
AP88 & AP91 shifting proposal
 
Gb137
Gb137Gb137
Gb137
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 2
Copy of stub setting 2Copy of stub setting 2
Copy of stub setting 2
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of stub setting 3
Copy of stub setting 3Copy of stub setting 3
Copy of stub setting 3
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Copy of stub setting 3
Copy of stub setting 3Copy of stub setting 3
Copy of stub setting 3
 
Copy of stub setting 2
Copy of stub setting 2Copy of stub setting 2
Copy of stub setting 2
 
Copy of stub setting 2
Copy of stub setting 2Copy of stub setting 2
Copy of stub setting 2
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of stub setting 3
Copy of stub setting 3Copy of stub setting 3
Copy of stub setting 3
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Airbirne observation plate
Airbirne observation plateAirbirne observation plate
Airbirne observation plate
 
3
33
3
 

Recently uploaded

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 

Recently uploaded (20)

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 

Copy of stub setting

  • 1. INSPECTION /RECORD SHEET FOR FOUNDATION EXCAVATION DIMENTION NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 +2 +3 +4 CHEMNEY EXT: 0 0 0 0 SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 EXCAVATION DETAILS EXCAVATION DRAWING NO: A/SP/7660/P/040 LEG#1 LEG#2 LEG#3 LEG#4 AS DRNG ACTUEL AS DRNG ACTUEL AS DRNG ACTUEL AS DRNG ACTUEL AVERAGE DEPTH TO CP 4250 4250 4250 4250 4250 4250 4250 4250 EXCAVATION WIDTH 6030 6950 6030 7200 6030 6650 6030 6700 WIDTH 150 150 150 150 150 150 150 150 UNDER CUT HEIGHT 200 200 200 200 200 200 200 200 SOIL STRATA MIXED SOIL MIXED SOIL MIXED SOIL MIXED SOIL DEWATERING REQUIRED YES/NO YES/NO YES/NO YES/NO SHUTERING EMPLOYED YES/NO YES/NO YES/NO YES/NO CHANGE OF FOUNDATION CLASS : YES/NO IF YES ACCEPTED CLASS: Remark : Excavation accepted for stub setting and concreting --------------------------------------------- INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION 1
  • 2. NAME OF LINE: 0 CONSULTANT : CLIENT : CONTRACTOR : DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 STUB DETAILS STUB MARK NO: H5800-1 STUB LENGTH 6021 STUB DIMENTIONS LEVEL LEG#2 LEVEL LEG#3 T= 0.616 T= 14015.2 T= 1.616 A= 0.614 A= 8053.0 A= 1.613 T= 20108.0 A= 11344.0 T= 14353.4 A= 7900.0 T= 14292.7 A= 8055.0 T= 20272.7 A= 11172.0 LEVEL LEG#1 T= 14487.0 LEVEL LEG#4 T= 1.616 A= 7902.0 T= 1.616 A= 1.616 A= 1.615 NOTE: SETTING LEG FOR LEVELL :LEG NO:………………………………. 1 INSPECTION /RECORD SHEET FOR REINFORCEMENT AND CONCRETING NAME OF LINE: 0 CONSULTANT : 2
  • 3. CLIENT : CONTRACTOR : DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 CONCRETE MATERIALS (if as per drawing Y(es): ITEM OBSERVATION COMMENTS CEMENT OK N/A GRAVEL SIZE OK N/A SAND PROPERTY OK N/A CONCRETE SUPPLIER LOADING TIME 11:43 7:13 10:52 8:45 CONCRETING TIME 13:10 9:15 12:00 10:40 REINFORCEMENT MATERIALS (if as per drawing Yes): REINFORCEMENT WEIGHT LEG#1 LEG#2 LEG#3 LEG#4 PER LEG 1768.31 1768.31 1768.31 1768.31 TOTAL WEIGHT 7073.24 CONCRETING DATE OF DATE OF CONCRETING VOLUME SLUMP CONCRETING CONCRETING LEG PYRAMID CHIMNEY AS PER DRAWING ACTUEL MM 1 11/1/2007 11/1/2007 33.23 46 85 2 28/2/2007 28/2/2007 33.23 50 90 3 19/1/2007 25/1/2007 33.23 42.5 90 4 11/12/2006 11/12/2006 33.23 42 100 TOTAL CONCRETING VOLUME 132.91 180.5 INSPECTION /RECORD SHEET FOR REINFORCEMENT AND CONCRETING NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : 3
  • 4. DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 CUBES CYLINDRES TAKEN (ID=Mark identification )S for slab,C for chimney ID DATE LEG DATE LEG S 11/1/2007 1 19/1/2007 3 C 28/2/2007 2 11/12/2006 4 FORM WORK REMOVED LEG DATE OBSERVATION 1 13/1/2007 OK 2 2/3/2007 OK 3 27/1/2007 OK 4 13/12/2006 OK REMARK: ACCEPTED FOR BACK FILLING FOUNDATION ACCEPTED FOR PAYMENT: INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : DATE 12-Dec-07 4
  • 5. TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M SOIL CLASS: 3 DRAWING NUMBER: A/SP/7660/P/040 STUB DETAILS STUB MARK NO: H5800-1 STUB LENGTH 6021 CLEATS/STUB 12 CLEAT BOLTS/STUB 24 STUB DIMENTIONS LEG#1 LEG#2 STUB SLOPE WING1 WING2 WING1 WING2 THEORETICAL 90 90 90 90 ACTUAL AT SITE 90 90 89 90 1MTR A LEG#3 LEG#4 STUB SLOPE WING1 WING2 WING1 WING2 THEORETICAL 90 90 90 90 ACTUAL AT SITE 91 90 90 90 STUB SETTING IS ACCEPTED FOR CONCRETING INSPECTION /RECORD SHEET FOR STUB SETTING DIMENTION NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : 5
  • 6. DATE 12-Dec-07 TOWER NO: 0 TOWER TYPE 0 2 3 1 4 SLOPE IN 50CM LEVEL LEG LEG EXT CHI.EXT WING1 WING2 TOP OF STUB 1 +4 0 45 45 1.616 2 +2 0 44.5 45 0.614 3 +3 0 45.5 45 1.613 4 +4 0 45 45 1.615 SIDE SLOPE IN 50CM=45 REFERENCE LEG FOR LEVEL 1 -b +b a 1-2 1-4 2-1 2-3 3-2 3-4 4-1 4-3 DISTANCE"a"cm 1429.3 1448.7 1429.3 1401.5 1401.5 1435.3 1448.7 1435.3 VALUE"b"cm -4 6 0 0 0 2.5 -2 6 (b/a)x100%value -0.280 0.414 0.000 0.000 0.000 0.174 -0.138 0.418 INSPECTION /RECORD SHEET FOR EARTHING MEASURMENTS NAME OF LINE: CONSULTANT : CLIENT : CONTRACTOR : DATE 12-Dec-07 6
  • 7. TOWER NO: 0 TOWER TYPE 0 LEG#1 LEG#2 LEG#3 LEG#4 LEG EXT: +4 M +2 M +3 M +4 M CHEMNEY EXT: 0 M 0 M 0 M 0 M BASIC EARTHING CONNECTED TO LEG NO: 1 3 DATE EARTH RESISTANCE (OHM) WITH BASIC EARTHING 12/12/2007 1.8 OHM NOTE: IF TOWER FOOTING RESISTANCE IS GREATER THAN 15 OHM ADDITIONAL EARTHING MAY BE REQUIRED ,SUBJECT TO THE APPROVAL OF ENGINEER AGREED FOR ADDITIONAL EARTHING TO BE INSTALLED FOR EDF FOR CONTRACTOR DATE EARTH RESISTANCE (OHM) WITH ADDITIONAL EARTHING OHM EARTHING INSTALLATION ACCEPTED FOR EDF FOR CONTRACTOR 7