Accessory Dwelling Unit:  Construction Start to Finish April 2011-Septemeber 2011
3D Model
Excavation
Excavation
Excavation
Excavation
Concrete Forms
Concrete  Foundation Walls
Gravel
Vapor Barrier
Rigid Foam, Rebar, and Pex Tubing for Radiant Heat
Concrete Slab
Utilities: Sewer and drainage pipes
Utilities: Water
Utilities: Electrical
Utilities: Gas
Platform Framing
Balloon Framing
Framing: Windows
Framing: Stairs
Framing: Roof
Framing: Sheathing
Roofing
Weather and Air Resistant Barrier
Rough Plumbing
Mechanical:  (eg. Heat Recovery Ventilator)
Mechanical:  Tankless Water Heater COLD WATER IN HOT WATER OUT
Mechanical: Radon Mitigation
Lighting and Electric
Air Sealing
Insulation: Batts
Insulation:  Closed Cell Spray Foam
Insulation: Blown in
Drywall  (aka Sheetrock)
Drywall: Mudding, Sanding, Priming
Shingles & Rain Screen
Siding
Staining and Sealing Concrete Flooring
Reused Flooring
Tiling
Painting
Cabinets & Shelving
Finish Plumbing
Finish Electrical and Lighting
Certificate of Occupancy and Moving In
Modifications
Questions
Questions
Upcoming SlideShare
Loading in...5
×

ADU Construction Process (in pictures)

7,571

Published on

Building an Accessory Dwelling Unit is not procedurally different than building a new house. This slideshow shows the building process step by step.

0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
7,571
On Slideshare
0
From Embeds
0
Number of Embeds
14
Actions
Shares
0
Downloads
11
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide
  • Excavation Gravel Rigid Foam Water Barrier Foundation Concrete Forms Concrete Pour Foundation Wall Rigid Foam Slab Utilities Sewer, Electrical, Water, Gas Framing Balloon Framing Thermal Bridging, Advanced Framing Sheathing Roof Stairs Windows Roofing Weather Resistant Barrier Rain Screen Rough Plumbing Mechanical Radon mitigation Lighting and Electrical Air Sealing Insulation Foam, Blown in Insulation, Batts Drywall Sheetrock, Mudding, Sanding, Primer Siding Flooring Tiling Painting Cabinets, Shelving Finish Plumbing Finish Electrical and Lighting Certificate of Occupancy Modifications Moving In
  • Transcript of "ADU Construction Process (in pictures)"

    1. 1. Accessory Dwelling Unit: Construction Start to Finish April 2011-Septemeber 2011
    2. 2. 3D Model
    3. 3. Excavation
    4. 4. Excavation
    5. 5. Excavation
    6. 6. Excavation
    7. 7. Concrete Forms
    8. 8. Concrete Foundation Walls
    9. 9. Gravel
    10. 10. Vapor Barrier
    11. 11. Rigid Foam, Rebar, and Pex Tubing for Radiant Heat
    12. 12. Concrete Slab
    13. 13. Utilities: Sewer and drainage pipes
    14. 14. Utilities: Water
    15. 15. Utilities: Electrical
    16. 16. Utilities: Gas
    17. 17. Platform Framing
    18. 18. Balloon Framing
    19. 19. Framing: Windows
    20. 20. Framing: Stairs
    21. 21. Framing: Roof
    22. 22. Framing: Sheathing
    23. 23. Roofing
    24. 24. Weather and Air Resistant Barrier
    25. 25. Rough Plumbing
    26. 26. Mechanical: (eg. Heat Recovery Ventilator)
    27. 27. Mechanical: Tankless Water Heater COLD WATER IN HOT WATER OUT
    28. 28. Mechanical: Radon Mitigation
    29. 29. Lighting and Electric
    30. 30. Air Sealing
    31. 31. Insulation: Batts
    32. 32. Insulation: Closed Cell Spray Foam
    33. 33. Insulation: Blown in
    34. 34. Drywall (aka Sheetrock)
    35. 35. Drywall: Mudding, Sanding, Priming
    36. 36. Shingles & Rain Screen
    37. 37. Siding
    38. 38. Staining and Sealing Concrete Flooring
    39. 39. Reused Flooring
    40. 40. Tiling
    41. 41. Painting
    42. 42. Cabinets & Shelving
    43. 43. Finish Plumbing
    44. 44. Finish Electrical and Lighting
    45. 45. Certificate of Occupancy and Moving In
    46. 46. Modifications
    47. 47. Questions
    48. 48. Questions
    1. A particular slide catching your eye?

      Clipping is a handy way to collect important slides you want to go back to later.

    ×