Luis gestoso sismos 2011- Bolzano Workshop
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Luis gestoso sismos 2011- Bolzano Workshop

on

  • 40 views

 

Statistics

Views

Total Views
40
Views on SlideShare
40
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Luis gestoso sismos 2011- Bolzano Workshop Presentation Transcript

  • 1. 1
  • 2. 2 TIME (UTC) DEPTH INTENSITY STRENGTH 15:05 2 VI 4,5 16:47 3 VII 5,1
  • 3. 3 SEISMIC EMERGENCY PLAN OF CIVIL PROTECTION IN THE REGION OF MURCIA (SISMIMUR)
  • 4. 4 GRUPO ORDEN GRUPO LOGISTICO GRUPO SANITARIO GRUPO ACCION SOCIAL GRUPO INTERVENCIÓN GRUPO ACCION SOCIAL GRUPO LOGISTICO GRUPO INTERVENCIÓN GRUPO SANITARIO GRUPO ORDEN CECOPAL DIRECTOR Alcalde COMITÉ ASESOR (PEMU) GABINETE DE PRENSA (PEMU) JEFE DE OPERACIONES (PEMU) JEFE DE PUESTO DE MANDO AVANZADO (PEMU) GABINETE DE PRENSA Jefe de Gabinete de Prensa de Consejería Presidencia GABINETE DE PRENSA Jefe de Gabinete de Prensa de Consejería de Presidencia y de Delegación de Gobierno JEFE DE OPERACIONES Director de CECARM CECOP DIRECTOR Consejero de Presidencia JEFE DE PUESTO DE MANDO AVANZADO Jefe de Servicio de P.Civil COMITÉ ASESOR (según Plan SISMIMUR) DIRECTOR Consejero de Presidencia y Delegado del Gobierno CECOP - CECOPI COMITÉ ASESOR (según SISMIMUR) JEFE DE OPERACIONES Director de CECARM y Jefe de Unidad de P. Civil de Deleg. Gobierno JEFE DE PUESTO DE MANDO AVANZADO Jefe de Servicio de P.Civil CARM NIVEL 0NIVEL 1NIVEL 2 GABINETE DE PRENSA Jefe de Gabinete de Prensa de Delegación de Gobierno y Consejería Presidencia CECOPI DIRECTOR Delegado del Gobierno y Consejero de Presidencia COMITÉ ASESOR JEFE DE OPERACIONES Jefe de Unidad de P. Civil de Deleg. Gobierno y Director de CECARM JEFE DE PUESTO DE MANDO AVANZADO Jefe de Servicio de P.Civil CARM NIVEL 3 GRUPO EVALUACIÓN SÍSMICA GRUPO RESTAURACIÓN SERVICIOS ESENCIALES GRUPO EVALUACIÓN SÍSMICA GRUPO RESTAURACIÓN SERVICIOS ESENCIALES PLAN SISMIMUR
  • 5. 5 • Emergency state level 1 at 17:40, 35 minutes after the first earthquake happened • Emergency state level 2 at 19:20, 33 minutes after the second earthquake
  • 6. 6 9 deceased 200 injured Nearly 8000 attended calls by 112
  • 7. 7 PUESTO DE MANDO AVANZADO MANDO DEL GRUPO DE INTERVENCIÓN COORDINADOR DEL GRUPO DE EVALUACIÓN SÍSMICA COORDINADOR DEL GRUPO DE RESTABLECIMIENTO DE SERVICIOS ESENCIALES COORDINADOR DEL GRUPO SANITARIO MANDO DEL GRUPO DE ORDEN COORDINADOR DEL GRUPO LOGÍSTICO COORDINADOR DEL GRUPO ACCIÓN SOCIAL Advanced Command Position Intervention Team Command Seismic evaluation team Coordinator Essential recovery services group Coordinator Health group Coordinator Order group Command Logistic group Coordinator Social action group Coordinator
  • 8. 8 Advanced Command Position Military Emergency Unit
  • 9. 9 MANDO DEL GRUPO DE INTERVENCIÓN EQUIPO DE BOMBEROS EQUIPO DE BÚSQUEDA Y RESCATE EQUIPO DE CONTROL DE EDIFICIOS Intervention group Command Firefighters Team Building control Team Search&Res cue Team
  • 10. 10
  • 11. 11 COORDINADOR DEL GRUPO SANITARIO EQUIPO ASISTENCIAL EQUIPO DE SALUD PÚBLICA Health Team Coordinator Welfare Team Public Health Team
  • 12. 12
  • 13. 13 COORDINADOR DEL GRUPO DE ORDEN PATRULLA GUARDIA CIVIL PATRULLA POLICÍA LOCAL PATRULLA POLICÍA NACIONAL EQUIPO FORENSE State Police: 506 forces GC Patrols: 445 forces Police: 90 forces per day Forensic Team; identification and autopsy of 8 victims in 24 hours
  • 14. 14 COORDINADOR DEL GRUPO DE RESTABLECIMIENTO DE SERVICIOS ESENCIALES EQUIPO DE RESTABLECIMIENTO DE AGUA POTABLE EQUIPO DE RESTABLECIMIENTO DE GAS EQUIPO DE RESTABLECIMIENTO DE ELECTRICIDAD EQUIPO DE RESTABLECIMIENTO DE TELEFONÍA, RADIO Y TV EQUIPO DE RESTABLECIMIENTO DE CARRETERAS EQUIPO DE RESTABLECIMIENTO DE SANEAMIENTO EQUIPO DE RESTABLECIMIENTO DE VÍAS URBANAS Coordinator Drinkable water Team Gas recovery Team Phone, radio, TV recovery Team Roads recovery Team Streets & Lanes recovery Team Water&Sanitati on recovery Team Electricity recovery Team
  • 15. 15 TUNNEL: both viaducts on A-7 motorway over Guadalentín river were affected. It took 30 hours to repair. Motorway cut between km 593 and 595 TRAIN: railway between Lorca and Águilas kept closed since 11th to 25th May due to buildings collapse risk on the railway GAS: HC Energía, gas distributor in Lorca, closed 1.200 natural gas taps on the city. On May 17th service was recovered. HOSPITALS: Rafael Méndez Hospital, with capacity for 257 beds, was cleared for safety reasons, althoug not importants structural damages were detected. Emergency room was re- opened on May 13rd. Phone: On May 13rd Movistar and Vodafone repeaters were installed. They were requested since the second earthquake
  • 16. 16 COORDINADOR DEL GRUPO LOGÍSTICO EQUIPO DE MAQUINARIA CIVIL EQUIPO DE ILUMINACIÓN Y CLIMATIZACIÓN EQUIPO DE OTROS SUMINISTROS EQUIPO DE AVITUALLAMIENTO EQUIPO DE COMBUSTIBLES EQUIPO DE APOYO LOGÍSTICO AÉREO EQUIPO DE COMUNICACIONES EQUIPO DE ALOJAMIENTO Coordinator Civil equipment Team Provisioning Team Supplies Team Logistic air support Team Communications Team Lodging Team Fuel Team Ilumination&climate Team
  • 17. 17 •  Some camps were established at the heavy damaged districts: – Las Viñas, San Fernando, Sutullena, Instituto Ibáñez •  The main camp were at “Huerto de la Rueda” trade fair. 4.000 people took refuge there
  • 18. 18 Seismic researching team: IGN- IGM Cultural Legacy damage evaluation Team: Technics from State, Region, City Councils Housing damage evaluation Team: Téch people from CARM, City Councils, proffesional colleges, volunteers, UME COORDINADOR DEL GRUPO DE EVALUACIÓN SÍSMICA EQUIPO DE INVESTIGACIÓN SÍSMICA EQUIPO DE EVALUACIÓN DE DAÑOS EN VIVIENDAS EQUIPO DE DERRIBO Y DESESCOMBRO EQUIPO DE EVALUACIÓN DE DAÑOS EN PATRIMONIO CULTURAL Demolition and clear-up Companies
  • 19. 19 Coordination of 200 arquitects, building engineers, volunteers, Regional and Local Administrations and Military Emergency Unit •  80% buildings were damaged •  City divided in 29 sectors grid •  Initial evaluation for buildings structural wellness. Colour code (green, yellow, red) about facilities access risks
  • 20. 20
  • 21. 21 EvaluationCheck Short-term works Restoration 51 inmuebles
  • 22. 22 Special group ready to take care of victims, specially in social aspects, related with the emergency situation COORDINADOR DEL GRUPO DE ACCIÓN SOCIAL EQUIPO DE EVACUACIÓN Y ALBERGUE EQUIPO DE ATENCIÓN ESPECIAL EQUIPO PSICOLÓGICO EQUIPO DE SUMINISTRO DE ROPA EQUIPO DE ALIMENTACIÓN EQUIPO DE LIMPIEZA E HIGIENE Evacuation&Acommodation Feeding Team Clothing supply Team Psychological Team Cleaning Team Special attention team Coordinator
  • 23. 23 On May 18th, population with no home, registered in the city of Lorca, were lodged in a second camp, “La Torrecilla”. Camp capacity was about 1800 people. 1580 were finally lodged. Distribution of people per nationality
  • 24. 24 Camp was closed October 30 2011