Journey to Sustainability

130 views
112 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
130
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Journey to Sustainability

  1. 1. Journey to SustainabilityNIKE Factory Stores February 19, 2013 slide │ 1
  2. 2. … the quality of not being harmful to the environment or depleting natural resources, thereby supporting long-term ecological balanceslide │ 2
  3. 3. 1971….EARTH DAY US based non profit organization, Keep America Beautiful, launched its memorable ad campaign "People Start Pollution. People can stop it“ featuring the "Crying Indian”…slide │ 3
  4. 4. slide │ 4
  5. 5. NIKE’S Maxim #8 - Do the Right Thing Embrace the truth. Be transparent. Seek diversity. Promote sustainability. These values are a part of who we are. They give each of us a chance to make a unique contribution to the quality of life for others and to our business…….Our success depends on it.slide │ 5
  6. 6. 2005 – Our Initial Sustainable Process for NFS Fabricated Fitting Rooms DuctSox for HVAC & busSTRUT Lighting System Polished Concrete Floors Xlerator Hand Dryers Nike Reuse-A-Shoe Matsslide │ 6
  7. 7. 2005 - USGBC’s LEED® Certification System Implemented US Green Building Council (USGBC) Leadership in Energy & Environmental Design a nonprofit organization of members from is the nationally accepted every sector of the building industry Green Building Rating System united by a common purpose: developed by the USGBC to transform the building marketplace to LEED® certification is used for certifying the sustainability greenest performing buildings in the worldslide │ 7
  8. 8. 2006 – FIRST SUCCESSLEED® for Retail: Commercial Interiors Silver 2008 – WE STUMBLE Rio Grande, Texas Houston, Texas slide │ 8
  9. 9. slide │ 9
  10. 10. 2010 – Defining the New Game LESSONS LEARNED – LEED® Certification Process Corporate Executive Support is mandatory due to inevitable budget, headcount, and schedule timeline alterations. Identify a Champion as the point person to guide the certification program to success. Retain LEED® APs with vast experience relative to USGBC’S rigorous documentation requirements. Substantial Lead Time is vital in identifying project specifics and accomplishing all upfront work.slide │ 10
  11. 11. Frequent Training is Essential a b c d June 2010 Dec 2010 Feb 2012 LEED® SPEC Writing Training RESULTS Workshop Charrette Seminar GBS conducts Eco-design Mission 2 25+ NIKE LEED® training collaborative SPEC Commission participants workshop at writing charrette training seminar achieve USGBC NIKE WHQ held at NIKE WHQ held at NFS Opry LEED® GA Mills, TN Accreditationslide │ 11
  12. 12. Choose Certification Level LEED® CI rating system certified silver gold platinum 40 – 49 50 – 59 60 – 79 80+ credits credits credits creditsslide │ 12
  13. 13. 2011 - First Nike LEED® for Retail: CI Gold Project Oklahoma City, OKslide │ 13 KT
  14. 14. LEED® Gold Certification - Credit Related Achievements INDOOR SUSTAINABLE WATER ENERGY & MATERIALS & INNOVATION ENVIRONMENTAL SITES EFFICIENCY ATMOSPHERE RESOURCES IN DESIGN QUALITY Based on stats for Oklahoma City - LEED® for Retail: Commercial Interiors Gold – 68 TOTAL CREDITS 3/21 8/11 31/37 4/14 14/17 6/6 Partnered with LL to 36% water use 100% wind power 88% of construction Low/no VOC emitting Green housekeeping reduce solar heat gain reduction through use purchased through waste diverted from paints, adhesives, and by installing highly of: REC’s (renewable landfill furniture used reflective roof energy certificates) Green building - low flow toilets education & fixtures 28% pre/post No smoking policy Preferred parking for 94% of equipment consumer recycled implemented LEV (low emitting Savings of an has ENERGY STAR content in new Optimal green energy vehicle) and fuel estimated 16,000+ rating building materials & performance efficient vehicles products Increased air quality gallons of water/year through added 45% lighting energy outside air and LEED® accredited Centrally located bike was reduced by using increased filtration professional utilized racks installed to daylight sensors, on project encourage alternative mercury-free LED transportation lamps & robust EMS Lighting and thermal comfort controls for all work stations NOT SHOWN: Regional Priority: Optimize Energy=1; Construction Waste Mngt=1slide │ 14 KT
  15. 15. Initial LEED Costs 14,000 SF Store Cost Cost psf Architect $13,000 $ 0.93 $110,850/ CPM $ 8,000 $ 0.57 AR $1,438,263 General Contractor $25,000 $ 1.79 = 8% LEED $ 4,200 $ 0.30 Consulting Fees $41,700 $ 2.98 Commissioning Fees $ 5,000 $ 0.36 Landlord $13,950 $ 1.00 TOTAL LEED COSTS $110,850 $ 7.92slide │ 15 KT
  16. 16. Next Generation LEED Costs 13,400 SF Store Cost Cost psf Architect $ 3,000 $ 0.22 CPM $ 4,000 $ 0.30 $49,600/ General Contractor $15,000 $ 1.12 AR $1,800,030 LEED $ 4,200 $ 0.30 = Consulting Fees $20,000 $ 1.49 3% Commissioning Fees $ 2,500 $ 0.19 Landlord (bike racks) $ 450 $ 0.03 REC Costs $ 450 $ 0.03 TOTAL LEED COSTS $ 49,600 $ 3.69slide │ 16 KM
  17. 17. Landlord Workletter Evolution White Box to Cold Dark Shell = $15 psf Typical Landlord workletter lacked specifications relative to an energy efficient building. After extensive collaboration with LL’s, we successfully negotiated a favorable “cold dark shell” workletter. Thus, NIKE is able to provide its own energy efficient components: Low flow Energy Building High SEER plumbing management materials with HVAC units fixtures systems recycled content NIKE benefits with a $15 psf increase in TAslide │ 17 KM
  18. 18. KM
  19. 19. Current - NIKE Factory Stores Certified LEED® Gold Opry Mills Little Rock Louisville Des Moines Merrimack St. Louis OK City OK Nashville AR KY IA NH MO TN Traverse Livermore Meridian Texas City Westgate Henderson Mt CA* ID* TX* AZ* NV UT*slide │ 19 *anticipated March, 2013
  20. 20. Converse & Hurley Certified LEED® for Retail Converse • Livermore, CA • Texas City, TX • Westgate, AZ Hurley • Livermore, CA • Texas City, TXslide │ 20
  21. 21. Volume Certificationslide │ 21
  22. 22. There is No Finish Line Identify and pursue Refine and evolve attainable credits green practices frequently If not already Remain committed to impletmented, continuing education explore volume Examine new ways to and trainingcertification process enhance Green Building

×