From the 54 page demolition
permit application
Labor Missionaries followed the plans
• Increasing evidence that the labor missionaries and their
  supervisors followed t...
What of the plan details?
• The 10 seismic claims do not reference
  any related plan details or pictures
• They are not s...
Integrity
• These seismic claims are a summary of all of the reports
  over a 15 year time span.
• They are broad and swee...
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
The Auditorium Suspended Cieling Has No Siesmic Bracing
Upcoming SlideShare
Loading in …5
×

The Auditorium Suspended Cieling Has No Siesmic Bracing

775 views
713 views

Published on

Published in: Technology, Spiritual
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
775
On SlideShare
0
From Embeds
0
Number of Embeds
265
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

The Auditorium Suspended Cieling Has No Siesmic Bracing

  1. 1. From the 54 page demolition permit application
  2. 2. Labor Missionaries followed the plans • Increasing evidence that the labor missionaries and their supervisors followed the plans will: • Continue to unravel the various layers of deception and misinformation • Provide Church auditors with a clearer view of methods and motives. • Dispel the many enabling myths that have perpetuated this fraud over 15 years. • Require Beca to reciprocate with plan details and pictures or retract • Warrants a call to the CEO of Beca to voluntarily come forward and make things right.
  3. 3. What of the plan details? • The 10 seismic claims do not reference any related plan details or pictures • They are not specific to any particular location • These unsubstantiated seismic assumptions have cast a wide net over the David O McKay Building, the Temple and the Fosters Road chapel • They have become the basis of all past, present and future decisions
  4. 4. Integrity • These seismic claims are a summary of all of the reports over a 15 year time span. • They are broad and sweeping with little to no plan details and pictures. • The mounting evidence will expose the guilty parties to the light of day • The seismic claims are not tied to any code issues. • Statements such as “the walls are not connected to the foundations or the columns” are statements of assumed fact. • Our evidence turns these facts to fiction

×