• Save
Rarely Seen Shuttle Activities
Upcoming SlideShare
Loading in...5
×
 

Rarely Seen Shuttle Activities

on

  • 337 views

 

Statistics

Views

Total Views
337
Views on SlideShare
337
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Rarely Seen Shuttle Activities Rarely Seen Shuttle Activities Presentation Transcript

  • S H U TTLE P R O C E S S IN G ( B e f o r e F lig h t A c t iv it ie s R a r e ly S e e n B y Th e D G e nC r a lV E b lic --- IS e O P u R ) D IS C O V E R Y
  • External Tank Arrives by Barge from MS
  • External Tank Vertical Assembly Building
  • Removing External Tank From Carrier
  • External Tank Enters VAB
  • External Tank in VAB
  • Preparing to Lift the Tank to Vertical
  • Lifting Tank
  • Solid Rockets Are Attached
  • Engines Are Attached To Solids
  • Engines Are Attached To The Shuttle In The Shuttle Processing Facility
  • Shuttle In Sling Ready For Lift In VAB
  • Shuttle Has Been Moved To VAB And And Will Be Attached To External Tank
  • Shuttle is Attached
  • Payload Preparation Room (PPR)
  • Cargo Package For ISS
  • New Module For ISS
  • Payload Ready To Be Moved to The Launch Pad
  • Payload Carrier Leaves PPR
  • Payload Being Moved To Launch Pad
  • Lifting Payload Into Position For Insertion Into Discovery When It Arrives At The Pad
  • Shuttle Discovery Leaves VAB
  • Shuttle & Crawler TRIP: Length--- 3 ½ mi Time--- 6-8 hours Launch Pad
  • Crawler Control
  • DISCOVERY ARRIVES AT PAD
  • READY FOR LAUNCH
  • We Have Lift Off