  • 1M square ft installedRoom, rack, floor
  • Presentation march 2011 v1 e

    1. 1. Data Center Containment<br />Introduction<br />March 2011<br />   <br /> <br /> <br /> <br /> <br />Polargy, Inc.<br />256 Gibraltar Drive, Suite 155<br />Sunnyvale, CA 94089<br />888.816.8338<br />www.polargy.com<br />
    2. 2. Easy is Good<br />Not complex; no software, no cranes, no permits<br />Consolidation<br />Virtualization<br />Economizers<br />Monitor and Control<br />VFDs<br />Lighting<br />Containment Projects<br />
    3. 3. Polargy Project Approach Advantage<br />Design<br />Build<br />Commission<br />We assist in all processes: insurance, fire marshal, utility rebates, designing, building and commissioning <br />
    4. 4. Design<br /><ul><li>Hot/Cold
    5. 5. Obstructions
    6. 6. Fire safety
    7. 7. Layout
    8. 8. Shop drawings
    9. 9. Material list
    10. 10. Labor estimate</li></li></ul><li>Build<br />
    11. 11. Build<br />Over 1M square feet installed<br />Private<br />
    12. 12. Commissioning<br />Q: How Hot Can the Hot Aisle Get?<br />A: It Is in the Commissioning Plan <br />
    13. 13. Containment’s Biggest Issue: Fire Safety<br />Approaches<br /><ul><li>Fuse Links: Need to be below ambient of 100°F, fire marshals don’t like links
    14. 14. Drop-Away Panel: UL listed, FM Global approved
    15. 15. Add New Sprinkler Heads: Costly</li></ul>Drop-Away Panel <br />for use Under Sprinkler Heads <br />
    16. 16. Customer Success Metrics<br />
    17. 17. Customer Success Metrics<br />Equivalent to<br />1,482 homes<br />6,628 tons of coal<br />
    18. 18. Rapid Time to Savings<br />66,400<br />35,500<br />107,700<br />20,000<br />105,500<br />108,400<br />18,700<br />108,500<br />10,000<br />108,800<br />
    19. 19. Path to Savings<br />Pick candidate site<br />Assess if ROI is compelling <br />If compelling, develop a plan to get it done<br />

    ×